Council archive · source document
OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Performance outcomes Acceptable outcomes and design of the development to protect and retain identified ecological values and underlying ecosystem processes within or adjacent to the development site to the greatest extent practicable. This includes: (1) maintaining or restoring vegetated buffers between development and coastal waters to the extent practicable, unless the development is within ports or airports, or is marine development (2) maintaining or enhancing the connectivity of ecosystems in consideration of the cumulative effect of the development in addition to existing developed areas (3) retaining coastal wetlands, seagrass beds and other locally important feeding, nesting or breeding sites for native wildlife. AND Response ery g containing Matters of State Environmental Significance for Regulated Vegetation intersecting a watercourse. This mapping matter is irrelevant to the site because the area where the works are proposed is all hard infrastructure. Due to surrounding infrastructure, vegetation restoration and enhancement is not appropriate or relevant in the location for the small scale of the proposed project. AO7.6 Measures are incorporated as part of siting and design of the development to maintain or enhance water quality to achieve the environmental values and water quality objectives outlined in the Environmental Protection (Water) Policy 2009. AND The proposal is intended to prevent the current uncontrolled under mining and scour of the road which is currently releasing sediments into the river. AO7.7 Development avoids the disturbance of acid sulphate soils, or where it is demonstrated that this is not possible, the disturbance of acid sulphate soils is carefully managed to minimise and mitigate the adverse effects of the disturbance on coastal resources. A small amount of insitu soils below the level of mean low water springs will require disturbance for keying in the toe of the batter. It is anticipated that the contractor will undertake this section of work by pushing the bucket head in the sediment enough to laydown the fabric and overlay the 500mm of rock. The amount of disturbance for this part of the activity is less than 100m3 and most importantly displaced sediment will not become oxidised. PO8 Coastal protection work is undertaken only as a last resort where erosion presents an imminent threat to public safety or permanent structures. Editor’s note: Applications for coastal protection work must be supported by a report certified by an RPEQ that demonstrates how the engineering solution sought by the work will be achieved. A08.1 Coastal protection work is only undertaken to protect existing permanent structures from imminent adverse coastal erosion impacts, and the structures cannot reasonably be relocated or abandoned. AND The repair of the revetment works is necessary to allow repair and prevent further undermining of the adjacent road. The existing road provides access to houses and so cannot be relocated or abandoned. AO8.2 Coastal protection work to protect private structures is undertaken on private land to the maximum extent reasonable. AND Na the road is public. State development assessment provisions 10 October 2014 V1.5 Module 10 — Coastal protection 10.1 Tidal works, or development in a coastal management district state code Page 8 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW1/0370 Operational Works Application for Prescribed Tidal WorksRelated documentApplication case desk ↗
About this file
- File size
- 14.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.