Coastal Protection and Management Regulation 2003
Schedule 4A Assessment of Compliance

 

Specific Outcome

construction of the work; or

(b) disturbance to the sediment on the
bed and banks of the tidal water; or
(c) exposure to acid sulphate soils.

OW elcelel- le] (-msle) Lace)

extent the requirements stated in the
Standard are directed at maintaining the
water quality of tidal water;

(b) if a relevant planning scheme standard
is more stringent than the

standard mentioned in paragraph
(a)—the relevant planning scheme
standard, to the extent it is more stringent
than the standard mentioned in paragraph

{a).

fey nit aate yee)

 

12.7 Prescribed tidal work is designed
and constructed in a way to ensure it is
safe for persons standing or walking
on the work.

The design and construction of the
prescribed tidal work is consistent with
the following standards—

(a) subject to paragraph (c), any

surface of prescribed tidal work on which
a person may stand or walk is—

(i) not slippery; and

(i) does not have any feature that may
cause the person to trip or fall;

(b) subject to paragraph (c), any part of
prescribed tidal work that is unsafe for
persons standing or walking on the work
is surrounded by adequate

barriers to deter persons from

entering the part;

(c) if a relevant planning scheme standard
is more stringent than the

standard mentioned in paragraph (a)

or (b)—the relevant planning

scheme standard, to the extent it is more
stringent than the standard mentioned in
paragraph (a) or (b).

The part of the prescribed tidal works intended for a person
to stand or walk on is the concrete footpath. This concrete
footpath includes a 2% crossfall to reduce likelihood of
slippery moss growth.

For safety, a railing is proposed to deter pedestrians from
walking off the pathway onto the revetment wall.

Details for the safety rail are shown on Drawing 0000009
Sheet 07.

 

 

12.8 Appropriate measures are taken
for prescribed tidal work for a non-
private purpose to ensure an
unsupportable live load is not applied to
the work by persons or vehicles.

 

The design and construction of the
prescribed tidal work is consistent with
the following standards—

(a) subject to paragraph (b), prescribed
tidal work has erected or placed in
position on or near the work, a sign

 

The railing will prevent vehicles driving onto the revetment
wall.

 

11|Page

 

Used in these records

About this file

File size
14.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW1_0370 Operational Works Application for Prescribed Tidal Works.pdf · 14.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.