Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Appendix H - Slope Stability Assessment

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Brett Hage                                                                                      22328-001-Rev0
                                                                                             14 September 2022

All excess stormwater collected on site must be directed by pipes to discharge at least 10 m down slope
from the proposed structures. Surface dissipation, such as a rock weir or similar, must be installed at the
stormwater outlet(s) to minimise the risk of soil erosion at the discharge point. Discharge on to, or directly
above, the horticultural terraces to the south-east of the proposed building envelope would not be
permissible.
Subsurface disposal of stormwater must not be undertaken.




                                                       15/19
Log in to download the original file

Appendix H - Slope Stability Assessment.pdf · 5.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.