Original source · versioned page text
Compiled Reference Document - MCU25/0020 (As Published)
ADG Consulting Pty Ltd — Given the location and previous use of the site, groundwater impacts resulting from site contamination are not anticipated. A groundwater investigation will be undertaken at the commencement of dewatering as described in Section 6.5.2 of this report. This assessment will be representative of the groundwater being extracted and treated from the entire site, as opposed to localised monitoring well data which is often misleading. Based on previous experience with dewatering in the area, ADG expects the groundwater to require treatment to increase pH and dissolved oxygen levels, as well as reduce turbidity, suspended sediments and dissolved metal concentrations prior to being discharged to the Noosa River Canal System. ADG1786.25 Dewatering Management Plan_Rev1_07.10.25 Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.