Original source · versioned page text
Compiled Reference Document - MCU25/0020 (As Published)
ADG Consulting Pty Ltd 1 ‘Introduction ADG Consulting Pty Ltd (ADG) was engaged by Sunshine Beach Noosa Developments Pty Ltd (on behalf of Des Wood) to prepare a Dewatering Management Plan (DMP) for the proposed residential development within property described as Lot 2 on SP281580, situated at 11 Ravenwood Dr, Noosa Heads, Queensland. A previous version of this DMP (RevO dated 20/02/25) was prepared on the basis of a single level basement, which has now been amended to two level, and the DMP has now been revised in response to this change and also in response to a ‘Further Advice — Development Application’ letter received by the project from Noosa Council (reference MCU25/0020, dated 24/09/25). 1.1 Proposed development The proposed development comprises the construction of a two-storey residential dwelling over a two- level in-ground basement on the 622 m’ site. Supplied information indicates that excavations to facilitate the basement construction will extend to a maximum of approximately 7.4 m below ground level (bgl) to approximately RL-5.0 m Australian Height Datum (AHD; assuming local existing surface levels of around 2.4m AHD and a basement slab in the order of 0.4 m thickness). Localised deeper excavations will also be required for the construction of the car stacker overrun pit and other structural elements (i.e. footings and pile caps), where required. Groundwater seepage was previously recorded at a depth of between approximately 1.8 to 2.0 mbgl (equating to an approximate elevation of approximately 0.6 to 0.4 mAHD), during geotechnical investigations on the site (Tectonic, 2025). No further recent data has been supplied for review in preparing this DMP, however based on ADG’s experience on nearby sites in the locality in recent years, it is anticipated that groundwater should be expected at or around 0.6 m AHD +/- 0.5 m, depending on tidal and seasonal rainfall conditions. Dewatering will therefore be necessary to allow the basement to be constructed in dry conditions. 1.2 Relevant guidelines The DMP was prepared with reference to the following documents: — Australian and New Zealand Guidelines for Fresh and Marine Water Quality. 2018. Australian and New Zealand Governments and Australian state and territory governments (ANZG), Canberra ACT, Australia. — Australian and New Zealand Guidelines for Fresh and Marine Water Quality. 2000. Australian and New Zealand Environment and Conservation Council and Agriculture and Resource Management Council of Australia and New Zealand (ANZECC/ARMCANZ). — Environmental Protection (Water & Wetland Biodiversity) Policy 2019. Department of Environment and Science (DES), Queensland Government. — Noosa River environmental values and water quality objectives. 2022. Department of Environment and Science (DES), Queensland Government. — Guidelines for Managing Risks in Recreational Water. 2018. Australian Government, National Health and Medical Research Council (NHMRC). = Monitoring and Sampling Manual 2018, Version 2 June 2018. 2018. Department of Environment and Science (DES). - Queensland Water Quality Guidelines 2009, Version 3. 2013. The Department of Environment and Heritage Protection (DEHP). 1.3 General environmental duty The Environmental Protection Act 1994 describes that all persons in Queensland have a “General Environmental Duty” and that “a person must not carry out an activity that causes, or is likely to cause environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm”. ADG1786.25 Dewatering Management Plan_Rev1_07.10.25 Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.