Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2020-09-14 GC Agenda - Item 7 - Attachment 2 - Independent Scientific Review of Monitoring and Evaluation Plan

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
    Appendix A: MERI review checklist


                                                                                                                        Source of   Assessment and
    #           Prompt                          Notes
                                                                                                                        information recommendations.
    Planning and design
    1           Are the project                 There is some confusion in terminology between the Project Plan         Project      Generally met.
                goals/objectives SMART?         and the MER Plan.                                                       Plan
                                                                                                                                     Clarify and align
                (Strategic, Measurable,
                                                The Project Plan described five project objectives (A1-A5) (pg. 18).    Pg. 10-15,   terminology between
                Appropriate, Realistic and
                                                Table 1 (pg. 10-15) provides a series of deliverables (or outputs)      18. 32       Project Plan and MER Plan
                Time bound)
                                                that relate to each of the five objectives. This section of the                      (Recommendation 1).
                                                                                                                        MER Plan
                                                project document is very operationally focussed. The project
                                                deliverables are clear and meet SMART criteria but are at the level     Pg. 68-74
                                                of outputs.
                                                The MER Plan provides additional detail in relation to Phase II of
                                                the oyster restoration project, which seems to address objectives
                                                A1-A4. Objective A5 relates to TNC providing technical and expert
                                                support to Noosa Council’s Noosa River Plan, and is not addressed
                                                in the MER Plan.
                                                The MER Plan also lists goals and objectives, but used in a different
                                                way. The goals and objectives listed in the MER are SMART.
    2           Is there an explicit program    There is not an explicit program logic but the use of the MER           MER Plan     Met
                logic or similar that clearly   terminology for TNC shellfish restoration projects (based on the        pg.59
                identifies:                     Open Standards for the Practice of Conservation)6 are reasonably
                         Outputs;


6
    https://cmp-openstandards.org

                                                                                 12
Log in to download the original file

2020-09-14 GC Agenda - Item 7 - Attachment 2 - Independent Scientific Review of Monitoring and Evaluation Plan(PDF, 1MB).pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.