Original source · versioned page text
2020-09-14 GC Agenda - Item 7 - Attachment 2 - Independent Scientific Review of Monitoring and Evaluation Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Appendix A: MERI review checklist
Source of Assessment and
# Prompt Notes
information recommendations.
Planning and design
1 Are the project There is some confusion in terminology between the Project Plan Project Generally met.
goals/objectives SMART? and the MER Plan. Plan
Clarify and align
(Strategic, Measurable,
The Project Plan described five project objectives (A1-A5) (pg. 18). Pg. 10-15, terminology between
Appropriate, Realistic and
Table 1 (pg. 10-15) provides a series of deliverables (or outputs) 18. 32 Project Plan and MER Plan
Time bound)
that relate to each of the five objectives. This section of the (Recommendation 1).
MER Plan
project document is very operationally focussed. The project
deliverables are clear and meet SMART criteria but are at the level Pg. 68-74
of outputs.
The MER Plan provides additional detail in relation to Phase II of
the oyster restoration project, which seems to address objectives
A1-A4. Objective A5 relates to TNC providing technical and expert
support to Noosa Council’s Noosa River Plan, and is not addressed
in the MER Plan.
The MER Plan also lists goals and objectives, but used in a different
way. The goals and objectives listed in the MER are SMART.
2 Is there an explicit program There is not an explicit program logic but the use of the MER MER Plan Met
logic or similar that clearly terminology for TNC shellfish restoration projects (based on the pg.59
identifies: Open Standards for the Practice of Conservation)6 are reasonably
Outputs;
6
https://cmp-openstandards.org
12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.