Original source · versioned page text
2020-09-14 GC Agenda - Item 7 - Attachment 2 - Independent Scientific Review of Monitoring and Evaluation Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Source of Assessment and
# Prompt Notes
information recommendations.
A guide to data management in ecology and evolution (British
Ecological Society, 2014).
In addition, project documentation references a number of TNC
standard operating protocols and methods including the following:
Methodology for habitat suitability modelling;
Oyster habitat restoration monitoring and assessment handbook
(Baggett et al., 2014); and
Shuck don’t Chuck for shell recycling.
6 Is there a formal MERI plan Yes. The MER plan is comprehensive. Refer specifically to Annex 1 MER Plan, Met
that documents measures, which describes indicators, monitoring methods, assessment Annex 1 pg.
evaluation and reporting, metrics, benchmarks, frequency, timing and responsibilities. 52-88.
including timing and
responsibility?
Monitoring
7 Are the proposed indicators Mostly yes. Refer to Annex 3. Ecological methods are well MER Plan, Met for biophysical and
and monitoring methods established and clearly described. Socio-economic methods are Annex 3, ecological indicators.
clearly described? fairly generic. pg. 75-82 Qualitative methods to
understand community
awareness, use and
satisfaction are not clearly
described but could be
developed
(Recommendation 3).
8 Will restoration and Yes. Project output measures are clearly described in Table 1 Project Met
engagement activities be (Project Plan) and are included draft reporting template (Annex 5). Plan Table
logged and reported? Quantitative measures of engagement activities (e.g. number of
15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.