2020-09-14 GC Agenda - Item 7 - Attachment 2 - Independent Scientific Review of Monitoring and Evaluation Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Objectives Deliverables1
A1.6 Six monthly progress reports
A2 Identify suitable restoration sites for A2.1 Shellfish restoration suitability model
Phase II and Phase III and appropriate
A2.2 Permitting
shellfish substrate design and
configurations that minimize estuary- A2.3 Community consultation
user conflict whilst optimizing
rehabilitation
A3 Strengthen community interest, A3.1 Community consultation to identify
support and participation in Noosa volunteering opportunities
River restoration by establishing a
A3.2 Establish volunteering program
community volunteering program to
support oyster restoration
A4 Restore oyster ecosystems across the A4.1 Restore two sites
lower estuary
A4.2 Restore multiple additional sites
A4.3 MER study
A5 Provide technical and expert support A5.1 Workshop with Noosa Council
to Noosa for planning,
A5.2 Technical review x 5
implementation and evaluation
associated with appropriate elements A5.3 Study tours x 3
of the Noosa River Plan and other
A5.4 Conservation planning
coastal and marine management plans
A5.5 Access to TNC networks
A5.6 Promote project at conferences
A5.7 Promote project for further support
2.3 Monitoring, Evaluation and Reporting (MER) Plan 2020-2022
The MER Plan is embedded within the Project Plan, and provides substantial additional detail, including:
Project team and project governance;
Targets, goals and objectives;
Indicators and data collection methods and responsibilities; and
Evaluation metrics and reporting commitments.
Project targets, goals and objectives presented in the MER Plan are outlined in Table 2 overleaf.