APPLICATION DETAILS
Application No.	MCU21/0059 & OPW21/0094
Applicant	Pile-It Pty Ltd
Proposal	Material Change of Use - Landing – Residential and Operational Works – Jetty
Properly Made Date	27 April 2021
Information Request Date	Not Applicable
Information Response Date	Not Applicable
Decision Due Date	22 June 2021
Report Completed Date	20 May 2021
Report Reviewed By	Diogo Carrico

PROPERTY DETAILS
Property Address	Quay West Noosa 5/19 Laburnum Cres Noosaville Qld 4566
RP Description	Lot 5 GTP 104767
Land Area	190.0000 m²
Existing Use of Land	Residential

STATUTORY DETAILS
SEQRP Designation	Urban Footprint
Zone	Medium Density Residential
Precinct	Not Applicable
Local Plan Area	Not Applicable
Overlays	Acid Sulfate Soils, Flooding
Assessment Type	Code
PROPOSAL
The application seeks approval for a Material Change of Use - Landing – Residential and Operational Works - Jetty
The locality and proposal plan are included below.

Figure 1 – Locality

Figure 2 – Site Plan

Figure 3 – Design Plan

site details
Background
The applicant requested an on-site prelodgement meeting to discuss the site specific issues prior to make the subject application. The application is generally in accordance with the discussions at the prelodgement meeting.
Site Description
The subject site is one of the 3 units that have a direct frontage to the canal
Surrounding Land Uses
Residential
assessment
Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017; and
Noosa Plan 2020.
Noosa Plan 2020
The following codes from the Noosa Plan 2020 are applicable to this development:
Low Density Residential Zone Code;
Waterways Works Code
The application has been found to generally comply with all applicable statutory instruments.
cONSULTATION
Referral Agencies
Not Applicable
Internal Council Referrals
Planning assessment
Planning Officer comments:
It is noted that the proposal does not comply with Acceptable Outcome AO16.2 of the Waterways Works Code, as a 6m wide jetty head is proposed. The location of the subject site, in proximity to the lock walkway, restricts the ability for the jetty to extend out into the waterway any greater than what is proposed, and therefore the jetty head is required to ensure the jetty is usable. It is noted that the adjoining property to the north includes an approximate 4m frontage to the canal, and as such, is unlikely to be able to construct a compliant jetty within proximity to the proposed jetty on the subject site. Given the site location and proposed design, the proposal is considered to comply with Performance Outcome PO16 of the Waterways Works Code, and as such, the jetty head is considered acceptable. The proposal reflects the character and setting of works within the immediate surrounds of the locality (Noosa Waters Estate).
conclusion & reasons for decision
The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 63(5) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No MCU21/0059 OPW21/0094 for a Material Change of Use - Landing – Residential and Operational Works - jetty situated at Quay West Noosa 5/19 Laburnum Cres Noosaville Qld 4566 and described as Lot 5 GTP 104767, it is recommended the application be approved in accordance with the following details for the Decision Notice:
application details
Application No:	MCU21/0059 & OPW21/0094
Street address:	Quay West Noosa 5/19 Laburnum Cres Noosaville Qld 4566
Real property description:	Lot 5 GTP 104767
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
Decision details
Council decided to issue the following type of approval:
Development Permit for Material Change of Use - Landing – Residential and Operational Works - Jetty
CURRENCY PERIOD of approval
The currency period for this development approval is stated in the conditions below.
assessment manager conditions
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
20.001-012-S01	C1	Drawing Schedule & Transmittal prepared by Long View Consulting Engineers	26 February 2021
20.001-012-S02	C1	Structural Notes Sheet prepared by Long View Consulting Engineers	26 February 2021
20.001-012-S03	C1	Site Plan, Framing Plan, Elevations prepared by Long View Consulting Engineers	26 February 2021
20.001-012-S04	C1	Jetty Framing Detail prepared by Long View Consulting Engineers	26 February 2021
Currency Period
The Currency Period for this development approval lapses if all conditions have not been complied with by 20 May 2023, unless an application to extend the currency period is approved by Council.
General Conditions
The maximum number of vessels that may be berthed, moored, attached or stored on the structure(s) must not exceed 2.
The maximum moored vessel/s must not exceed:
Length - 5.0 metres
Weight - 1,500kg
Velocity - 0.5 metres/second
Vessels berthed/moored at the jetty must be located a minimum of 1.0 metre from the prolongation of the property boundaries.
Vessels and boatlifting devices must be connected directly to the jetty, and not located side by side or in tandem with another vessel.
The use of the jetty must not cause any adverse effects on the amenity of the surrounding area including changes to light, views, air quality and noise.
All structures must be designed and constructed such that they are free standing within the waterway and are not connected to or behind the revetment wall
All structures must have no detrimental effects on stormwater drains and/or easements.
Jetties must have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the revetment wall.
A rigid handrail must be fitted on one side of the walkway.
No posts or vertical supports of the proposed jetty are to extend vertically from the structure unless they provide necessary support for the handrail.
No boatlifting devices are to be attached or moored at the jetty structure for the purpose of elevating a vessel above the water without Council approval.
There must be no electrical reticulation system carrying electricity in excess of 24 volts beyond the revetment wall unless all switches and power outlets are positioned above the 1%AEP flood level.
Lighting associated with the use must be designed, installed, operated, and maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
Rock scour protection, wrapped in geotextile, extends from 750mm up to approximately 5000mm from the face of the revetment wall in Noosa Waters. Piles are to be:
Located clear of this rock protection where applicable, or alternatively
Where the scour protection extends beyond 750mm:
Prior to driving piles, the rocks are to be removed to expose the geotextile and the geotextile cut neatly to allow it to be turned back. During pile driving, care is to be taken to ensure the geotextile is not damaged. At the completion of pile driving, the fabric is to be turned down around the pile and the rocks replaced around the piles
The jetty is to be used for private purposes only with no commercial operations to be undertaken.
Boat repair activities are not permitted on site.
Wastewater and sullage must only be disposed of at approved pumpout facilities.
The mooring facility must not be utilised for live-aboard purposes.
Any construction and post construction activity is not to impact on the condition of the waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009.
Certification by a Registered Professional Engineer of Queensland that states that the jetty is constructed in accordance with best practice methods and is structurally sound must be submitted to Council. This certification must be submitted to Council within three (3) months of the completion of the works.  A final inspection and approval of the structure by Council’s Inspector is also required.  Please contact Council’s Development Assessment Branch on 5329 6500 to arrange the inspection.
This approval lapses where the construction of the jetty has not commenced within two (2) years of the date of issue of the approval, unless application is made and approved by Council for an extension.
After completion, the proposed works must be maintained in a sound state of repair in accordance with the approved plans
referral agencies
Not applicable.
Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
General Advisory Notes
Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works.  A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ.  The RPEQ bears full responsibility for all aspects of the engineering design.  Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent.
The approval or conditions do not absolve the owner of the land from complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory regulations in the execution and/or performance of said works.
Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time.
Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees.
Building and Construction Industry (Portable Long Service Leave) Levy
The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
property notes
Not applicable.
VARIATION approval details
Not applicable.
further development permits required
Not applicable.
submissions
Not applicable.
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.
OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

[word/footer1.xml]
Page 8 of 8

[word/header1.xml]
3

[word/header2.xml]
DEVELOPMENT ASSESSMENT DELEGATED REPORT

[Attachment: image1.jpeg (image text)]
 

19
‘sGTP104767
Neosavilly,

   

19 /
agret0s767 /

   

(a /
/1G7P 104238
/ [a7
SY asTP 104238
\ far |
acTP104872 |

0
502RP839224


[Attachment: image3.jpeg (image text)]
Lor; 2 / Lor; 5 oT: 4
cre tose re. toaer cr. toaer
AREA 00m

 

 

 

 

 

 

 

 

 

-msyonoe

 

 

9500

 

 

 

 

 

 

 

NOOSA WATERS,

JETTY SITE PLAN
12100

‘
Log in to download the original file

Delegated Report - Code - Planning MCU21 0059.docx · 215 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.