Approved Plans - RAL21/0033

of 97

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (29.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 14, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      EXECUTIVE SUMMARY
      PEAKURBAN Pty Ltd have been engaged by Mark Bain to prepare a Flood Investigation in
      support of a development application to Noosa Shire Council (NSC) over land located at 60
      60 Glenridge Drive, Cooroibah (Lot 47 RP 860577). This development application seeks a
      development permit for a Reconfiguration a Lot (ROL) to create 8 rural residential lots.
      The site is influenced by two unnamed tributaries of the Noosa River. Both catchments extend
      upstream across McKinnon Drive to the west and join at the eastern boundary of the site. The
      total catchment of both tributaries is 130ha. The catchment is characterised by steep upper
      catchment and flattens out along the lower part of the flood plain. Elevations on site range
      from 10 to 44m AHD.

      Suitable flood immunity is achievable for future dwellings on the site, with the recommended
      minimum building envelope / finished floor level (FFL) for each lot has been taken as the
      greater of the DFE + freeboard (0.3m) or the PMF (refer Table 4-5). Each lot will be have a
      place to refuge above Probable Maximum Flood within the future dwelling.
      The investigation has found that there is a no off-site impacts, reduction in peak flows and
      increase in flood storage provided. As such, any further formal on-site detention is not
      recommended as development has been designed to achieve the outcome of non-
      worsening.
      A flood risk assessment was completed which identified that the use of the building envelope
      as a flood refuge should a flood event greater than the 1% AEP occur.
      The new internal road will achieve flood immunity in the 10% AEP and remain trafficable in the
      1% AEP event. A 9 x 1200 (w) x 600 (h) box culverts are proposed under the road crossing.




21-0288-FS001-V5 | Flood Investigation | 60 Glenridge Drive, Cooroibah                                 |i
Log in to download the original file

Approved Plans - RAL21_0033.pdf · 29.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.