Original PDF page 19, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Response to Further Advice
A Further Advice Request was received on 14 March, 2022 as part of Reconfiguration of Lot
Application No: RAL21/0033. Items 1 to 3 relate to Flooding, with response to each item
detailed below:
Issue
Blockage of hydraulic structures needs to be accounted for in the design of the new internal
roadway and assessment of impacts of the development.
Information Request:
1. Provide an updated Flood Investigation report which documents the blockage
assumptions for each of the culverts represented in the ‘existing’ and ‘proposed’ model
scenarios and demonstrate the assumptions are consistent with the guidance of ARR2019
Book 6 Chapter 6.
Response:
A blockage assessment was completed and identified a 20% blockage should be applied to
the culverts within the model. With the inclusion of 20% blockage on the new culvert
crossing, an additional cell is required (9 x 1200 (w) x 600 (h)).
Issue
Building envelopes need to be entirely flood free.
Information Request:
2. Update the TOD subdivision plan such that the entirety of the building envelopes
achieves the minimum levels specified in Table 4-5 of the updated ‘Flood Investigation’
report.
Response:
Site plan has been updated to show building envelope extents being filled.
Issue
Lot 1 building envelope flood immunity for the 1% (2100) AEP is required to be achieved by
filling. The access of the building envelope to Glenridge Drive is inundated in the 39%AEP
event. These outcomes are unacceptable and contrary to the Flood Hazard Overlay Code.
Information Request:
3. Update the TOD subdivision plan to Delete Lot 1 and amalgamate with proposed Lot
Response:
Layout has been updated to address this item.
21-0288-FS001-V5 | Flood Investigation | 60 Glenridge Drive, Cooroibah |3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.