Skip to the record
Accept no substitutions.

Original source · versioned page text

Approved Plans - RAL21/0033

of 97

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (29.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 19, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
              Response to Further Advice
      A Further Advice Request was received on 14 March, 2022 as part of Reconfiguration of Lot
      Application No: RAL21/0033. Items 1 to 3 relate to Flooding, with response to each item
      detailed below:
      Issue
      Blockage of hydraulic structures needs to be accounted for in the design of the new internal
      roadway and assessment of impacts of the development.
      Information Request:
      1.     Provide an updated Flood Investigation report which documents the blockage
      assumptions for each of the culverts represented in the ‘existing’ and ‘proposed’ model
      scenarios and demonstrate the assumptions are consistent with the guidance of ARR2019
      Book 6 Chapter 6.
      Response:
      A blockage assessment was completed and identified a 20% blockage should be applied to
      the culverts within the model. With the inclusion of 20% blockage on the new culvert
      crossing, an additional cell is required (9 x 1200 (w) x 600 (h)).
      Issue
      Building envelopes need to be entirely flood free.
      Information Request:
      2.      Update the TOD subdivision plan such that the entirety of the building envelopes
      achieves the minimum levels specified in Table 4-5 of the updated ‘Flood Investigation’
      report.
      Response:
      Site plan has been updated to show building envelope extents being filled.
      Issue
      Lot 1 building envelope flood immunity for the 1% (2100) AEP is required to be achieved by
      filling. The access of the building envelope to Glenridge Drive is inundated in the 39%AEP
      event. These outcomes are unacceptable and contrary to the Flood Hazard Overlay Code.
      Information Request:
      3.       Update the TOD subdivision plan to Delete Lot 1 and amalgamate with proposed Lot
      Response:
      Layout has been updated to address this item.




21-0288-FS001-V5 | Flood Investigation | 60 Glenridge Drive, Cooroibah                               |3
Log in to download the original file

Approved Plans - RAL21_0033.pdf · 29.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.