Approved Plans - RAL21/0033

of 97

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (29.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 30, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                     Flow depth < 0.2m
                   1% AEP WSL




                                                                     Internal Road




      Figure 4-1: Section Across Internal Road Extension

      4.3.2.5. Flood Levels and Immunity

      Flood levels around the site for the Defined Flood Event (DFE) (i.e. 1% (2100) AEP) are detailed
      for various reporting locations as shown in Figure 4-2. This shows the proposed new building
      envelopes are above the DFE level. The recommended minimum building envelope /
      finished floor level (FFL) for each lot has been taken as the greater of the DFE + freeboard
      (0.3m) or the PMF, as summarised in Table 4-5.

      Table 4-5: Recommended Minimum Building Envelope and Finished Floor Level

        Lot     1% (2100)         Minimum         1% (2100)        PMF Peak      Min Building
                AEP Peak          Required        AEP + 0.3m       Flood Level   Envelope / FFL
                Flood Level       Freeboard       freeboard        (m AHD)       (m AHD)
                (m AHD)           (m)             (m AHD)

        1           13.24              0.3            13.54              13.52        13.54

        2           12.99              0.3            13.29              13.51        13.51

        3           12.99              0.3            13.29              13.52        13.52

        4           12.99              0.3            13.29              13.53        13.53

        5           12.99              0.3            13.29              13.52        13.52

        6           12.58              0.3            12.88              13.50        13.50

        7           12.58              0.3            12.88              13.48        13.48

        8           12.48              0.3            12.78              13.46        13.46




21-0288-FS001-V5 | Flood Investigation | 60 Glenridge Drive, Cooroibah                                   | 14
Log in to download the original file

Approved Plans - RAL21_0033.pdf · 29.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.