Original source · versioned page text
Att1 - Architectural Package
Very large file (62.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 14, section 1. The text section number identifies this passage in the reader.
DH-A DH-B DH-C ROOF LEGEND
DP Downpipe
EG Eaves Gutter
LBB Line of Building Below
OH Overhang
MRS Metal Roof Sheeting -
B Custom Orb
10.01
DH-1 DH-1
LBB D
10.02
EG
EG
EG
LBB MRS
10.0° Pitch
EG
DH-2 DH-2
LBB
LBB
LBB
5.0° Pitch
MRS
10.0° Pitch
MRS
MRS
EG
10.0° Pitch
A A
LBB
LBB
LBB
10.01 10.01
EG
10.0° Pitch
LBB
MRS
5.0° Pitch
MRS
EG
DH-3 DH-3
EG LBB
EG
LRO
SH-A SH-B SH-C
(extents of flyover roof
shown dashed)
10.0° Pitch
LRO
MRS
DH-A DH-B DH-C
LBB
EG
LRO
CONNECTS TO
SPORTS HALL
Revision Project Architect Stage Project No.
01 Work in Progress 5/07/2022 CYC Noosa Campsite CG DEVELOPMENT APPROVAL 1302-01 Roof Plan - Communal Dining Hall
02 Roof Plans Issue 17/08/2022 48 Kabi Road Cootharaba QLD
03 Development Approval 25/08/2022
Client
Christian Youth Council
Drawn
MF/MB
Status
PRE-CONSTRUCTION (NOT FOR CONSTRUCTION)
Scale
1:100 at A1 A-DA-CA-04.01 03
(07) 3251 6900 [email protected] Elevation Architecture Pty Ltd ACN 606 170 807 © Copyright reserved this document is and shall remain the property of Elevation Architecture. Unauthorised use of this document in any form whatsoever is prohibited. All information to be printed in colour. Figured dimensions take precedence over scale dimensions. Contractors must verify all dimensions on site before commencing any work or making shop drawings. P:\Data 1\1302-01 CYC Noosa Campsite\5.2 Development Application\5.2.1 ArchiCAD\1302-01_Communal DA 24.pln
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.