Decision Notice MCU25 0096 & OPW25 0146 (As Published)
2. This development approval lapses if the use has not happened by 11 November 2031, unless
an application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
7341-DA02 05 Location Plan & Summary, prepared by 30/10/2025
Blackburne Jackson
7341-DA03 05 Floor Plan – Level 1, prepared by 30/10/2025
Blackburne Jackson
7341-DA04 05 Floor Plan – Level 2, prepared by 30/10/2025
Blackburne Jackson
7341-DA05 05 Roof Plan, prepared by Blackburne Jackson 30/10/2025
7341-DA06 05 Elevations, prepared by Blackburne 30/10/2025
Jackson
7341-DA07 05 Elevations, prepared by Blackburne 30/10/2025
Jackson
7341-DA08 05 Sections, prepared by Blackburne Jackson 30/10/2025
7341_L01-01_A A Landscape Notes & Schedules July 2025
7341_L03-01_A A Landscape Planting Plan July 2025
7341_L07-01_A A Landscape Details July 2025
Building Height
4. The maximum height of the development must not exceed 8.150 metres above the ground
level.
5. Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
certifies that the building does not exceed the maximum height requirement of this Decision
Notice.
Performance Bond
6. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Operational Works. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit. Council reserves the
right to call upon the bond or guaranteed sum to effect compliance with conditions.
7. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and, where appropriate, the
building name.
Water & Sewer Connections
8. An underground connection to reticulated water and sewerage must be provided to the
premises in accordance with the standards and requirements of Northern SEQ Distributor–
Retailer Authority (Unitywater).
Page 2 of 16
Document Set ID: 24296454
Version: 4, Version Date: 13/11/2025