2020 - 21 Annual Report
Theme - The Noosa Community
Corporate Plan Goal - Our community is connected,
safe and happy and able to meet their potential
Key achievements as we work towards our long term goal include:
Specific Operational Plan Priorities
• Council continued implementation of Council’s Social Strategy including the Cultural Plan, Sport
and Active Recreation Plan and Health and Wellbeing Plan. Council endorsed a 2020/21 Action Plan
to progress implementation of the Cultural Plan.
• Our Community Facilities (Noosa Aquatic Centre, Noosa Leisure Centre and The J) had difficult
trading conditions due to closures associated with the pandemic. Nevertheless, while open, they
continued to play an important role in the social fabric of our community and have performed well
given the COVID-19 context.
• Planning approval was obtained and tenders let
for the construction of the Hinterland Adventure
Playground at Cooroy. Construction has started
with the new all abilities playground scheduled
to open by the end of 2021.
• Council sourced funding and assisted with the
construction of additional crisis housing as part
of the Shine Housing project.
• A consultant was engaged to investigate
the needs and opportunities for a new Regional Art Gallery including an examination of other
successful regional galleries. This work is part of a long term strategy to establish a new Regional
Art Gallery for Noosa.
• Council researched the best options for the replacement of our aging mobile library truck. A new
service model has been adopted that will provide more options for our community to access
library resources from locations other than Council’s two permanent libraries. The tender has been
let for the new mobile Library which will come into operation in 2021/22.
• Master Plans for the Noosa District Sports
Complex and the Cooroy Sports Complex
were adopted by Council last year and
implementation is now underway. New lighting
was installed at the Noosa District complex and
detailed design for internal roads completed
as well as concept plans for the well-being hub
have been developed.
• Major investment in our Road network
continued comprising a $4.6M reseal program
including the reseal of Maple Street, Cooroy and the Reef Street/Eenie Creek Road roundabout.
Council also continued its refurbishment and upgrade of major bridges throughout the Shire
including the Orealla Bridge at Sunrise Beach on David Low Way.
• Construction on Stage 3 of the Rufous Street, Peregian development commenced. The new
carpark was completed in 2019 but the construction of the new Peregian Beach Community
House was delayed as a result of the collapse of the initial primary contractor. In 2020/21,
a new tender was let and construction is now underway.
Page 23
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Annual Report 2020-21(PDF, 6MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.