Original source · versioned page text
Annual Report 2020-21
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Noosa Council
Notes to the Financial Statements
for the year ended 30 June 2021
Note 14. Property, Plant and Equipment (continued)
Index applied
Last (change in index Other interim
Valuation comprehensive Key assumptions and estimates recognised this revaluation
Asset Class and Fair Value Hiearchy approach valuation date Valuer engaged (related data sources) year) adjustment
Buildings (Level 3) Current 30/06/2020 Australis Asset No active market due to the specialised ABS Producer Price Nil
replacement cost Advisory Group nature of the assets and the services Index: 3020 Non-
local government buildings provide. residential building
Valuations are determined using unit construction,
rates for construction taking into Queensland
consideration industry standard cost
guides, project costs from recently
completed buildings.
Other inputs to cost, useful life and
remaining life include economic value,
legal and commercial obscelescence,
industry standards, asset condition and
consumption rating applied. All buildings
are separated into different components
with value determined based on a range
of interrelating factors. i.e. sub-structure,
superstructure, roof, electrical and
lighting, fitout and fittings, fire services,
HVA, mechanical and security services.
Other Infrastructure Assets (Level 3) Current 30/06/2021 Australis Asset No active market due to the specialised ABS Producer Price Nil
2021: $47,248k replacement cost Advisory Group nature of services these assets provide. Index: 3020 Non-
2020: $48,327k Unit rates are developed by estimating residential building
labour and materials required for asset construction,
replacement. Base rates were sourced Queensland
using actual contract prices for recently
completed projects or supply quotes for
similar assets based on age, size,
location and condition.
Where costs are not available, rates
were obtained from the valuer's
database or the Rawlinson's Australian
Construction Handbook, 2021 Edition.
continued on next page ... Page 29 of 61
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Annual Report 2020-21(PDF, 6MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.