Skip to the record
Search everything, all in one place.

Original source · versioned page text

2014-01-28 Planning & Organisation Committee Agenda

of 59

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   28 JANUARY 2014




                                                      Page 49 of 59

Community Spaces & Social Infrastructure                                                                        The ‘J’ Waik is a linear public space, which provides shade through the new structure and canopy shade
                                                                                                                     tree planting. whilst other facilities would include seating. wayfinding signage. waste bin(s) and adequate
     Social infrastructure and spaces for community use and benefit include flexible open spaces and public          lighting to ensure the space is visible at night from passing traffic along Noosa Drive. The palette of
     facilities, community space, arts and activity spaces, small enterprise incubators and affordable housing       materials and finishes would tie in with the overall streetscape design for Noosa Drive, whilst the space
     updos                     :                      ‘               "3                                             would also include integrated artwork.
     The Masterplan considers ways to reinforce and improve existing community spaces and social                     Centre Stage Cinema Forecourt: The place to be seen before a show
     infrastructure, as well as providing opportunities for new spaces and facilities throughout The Junction        Centre Stage Cinema Forecourt is 2 place to dine and meet friends, activated day and night. it would
     Social infrastructure items may be delivered through Council's infrastructure plans, whilst community spaces    have architectural elements to complement Arcadia Street and the Transit Centre with vertical landscape
     may arise from private development and other initiatives by Council and State and/or Federal Government         treatments (climbers, trellis, feature lighting to building etc) and tree canopy shade, architectural feature
     Contributions from developers will assist with community services, facilities, assets and networks (social      lighting and lighting for night time activity. The space would accommodate outdoor dining, natural shade,
     infrastructure) that are required for the quality of life and community wellbeing of the Noosa community        integrated artwork and wayfinding signage, whilst the palette of materials and finishes would complement
                                                                                                                     the streetscape design and materials and finishes selected for Sunshine Beach Road, Arcadia Steet and the
     Open Space and Public Facilities                                                                                Transit Centre.
     The Strategy aims to provide a range of flexible open space, gathering and recreation opportunities through     ‘Shatches by PLACE Design Group showing potential treatments for Arcadia Street (top) and Cockatoo Playground in Pinaroo Rotary Park (Bottom) (2010)
     revitalisation of existing spaces and areas within The Junction and through acquisition of new public space
     dedications as part of future land developments within The Junction.                                                          £        L.,                                                            ee ee
                                                                                                                                  ad            2          pesnoke CEMENTS                            AT atADE SPREOO zone
     These spaces would ideally incorporate a robust landscape design and cater for modest community                                              tg                CAO THEE                                    n
     gatherings as well as small groups and individuals. They would include seating, tee canopy shade and                                                        .
     shelter, easy access to public amenities and they would be accessible and legible. The key intentions for                                                 ;
     fevitalised and new public spaces in the Noosa Junction precinct include:                                          LL.               if    rl
     Arcadia Street: The Green Heart of Noosa Junction                                                                  |}               \             —           N7                                       y/ NV         V7
     Arcadia Street is extended from Sunshine Beach Road to Pinaroo Rotary Park.  It is a shared zone at the            |                             at                                              A
                                                                                                                                                                                                     —
     eastern end, where pedestrians are the priority. Wide pedestrian areas support al-fresco dining, seating,          |  (\          (4               ] a                          EZ     th  l     |          fi      ()
     gatherings, landscaping, trees and integrated artistic elements. The place is activated both day and night,           i Ne, "==         =                               |       pas          It              in     i
     with commercial frontages on both sides of the street. This is the main pedestrian street and the ‘Green                                     —————t                        ———
     Heart’ of Noosa Junction. Architectural and artistic/creative elements and landmark plantings demarcate
     the critical junctions along this space and distinguish the start and finish, reinforcing this premier space. An
     entertainment stage is incorporated into the design.                                                                                                              Sanutinte
                                                                                                                                                                            ay                             —furet Serie
     Cockatoo Playground and Pinaroo Way: A soft, green edge to Pinaroo Rotary Park
     Cockatoo Playground, the new playground for children in Pinaroo Rotary Park, features environmental                                                           Reet. eo.
     themes and interpretation, and is supported by picnic and other park facilities. Pinaroo Way is a low key.                                       =
     low speed access road, which provides a more open interface between the park and Noosa Junction.                                           A
     The ‘J’ Walk: An activated linear open space frontage to Noosa Drive                                                            Ty         r          ry                                                           r/
     A revitalised plaza space for The ‘J' youth population and the community, featuring a bold structure/bus                \}      i      y            ir Te                   se        Wit        V     Mir    ie      A
                                                                                                                              "                                                                                         a=
     shelter with super graphics promoting Noosa Events, landscape treatments and space for gathering: a place                  4         y               4 in          ED        I       Py His        Kolin      Li     ALON
     to be seen whilst waiting for the bus...or just to be seen                                                                                 Ff)      cooht Dabo LAY       Zl                       =            Ma

   EE:       P L A Cc E                                                                                                                                                                               Nowa lunction Piacemuaking Strategy Zz

                                   4                y                                                     ‘              n        %             oe)        wy       vn               .      ri
          ¥                        3                                                                3                       >     2.                        VR          eee)                    Legend
           ‘                        yap                                                             Si,                   os         S    ye                      a                      fa      eae
             A    Ne                <4            at                                                                         me                              Bee          Hs:          ‘      ee          © primary Trailhead
                     Za        c     rs       -   |                                                                                       ee:      by                  ey)                       @4a8
                    4         ce           At,                                                             ‘            x        s     %            s         4s             )         4   4     o=_
                a                x           cx                                                            ie       x        ¥         *.           Pm         es   F             Fi           a          § Secondary Trailhead
       x                  oat  a                                                                              :        »                   ba  SY          EY,        )
                                                 i                                                      .                     a           mM           ay       A                   Cay
  ‘            S           a           2                                      OOSA   FAIR                e                 gt                                      ay          eats             (I) terest ares
             Y                                      ts                                                     ou’                      Br     3       lore                                 4
                           ¢             NG                                                                   i.           ey              a           re                              y
 ,                                            SNA                                                           me                                     7             ae                             OOO
                                             x      *        \                                             en                                                om                   a                          Trails Proposed To Be Closed For
       Cj                                                                                                                        se             re a                           fe i                          ~
                                                 oy                                                                     S                    4                   ®         oa
yon                z                                          ,         y                               whe.                      i                                aH       ‘ae                   ake        Temporary Advisory Signs Notilying
                                                                                                                  ns                          %                           &        Re
  ‘         aS                                                 c                                         f                             .         Xe               E      “         —                        of Trail Closure
        ~         ,               .   2D                 ay                               A                  .                =                a 4   ;       a.        ¢,    »              r
  g        ENS                                                                 ‘                :       ;             ;                           a              ‘         =.             ee
       3        ¥         ‘          a       eA                ‘                                            7                                we            bh    "             >.       A
                   y        \                            .                             5                                  4                      >       *                             ,           oe        Directional Signs
                     ‘                    ee           :                                         a                ,        .                     }        b                          o>                                 7
 Bx.     NOOSA       \ 4      Dx              e,    *                      ¥               1                    i                "              :             "                           ae.
pasos UR                 ee                      ioe                                         Sa                                        weds       mh                           Bt         ie,                 bisting
                                                X            r                                                                                :          y    .j            oes                 mmm Exting Tre!
    c               nm    NNR                     :                                                                                   a                Lo                              *
  ap \         as        WW                                                                                           “                     <p                              ‘                                               ;
      DN                                                                                                                               ¢            =            s         -                    ee ee me     Proposed New Trail
       ee                                                                                                   7          A                    ;                   :         -             ,
                                       =                                                                            M      :    ha                   q°*                    -              .
                                        $                                                                     Pe           ,     Ps          “Le                       -               mt   q   EJ WSUD Retrofit Incorporating Gross
      3     \                    a;                                                        is     se           =        s          J                 Py          pital                                      Pollutant Trap
                                                            -                                             oF        =                                      -                               ad
 ,                                                    A                    Ne  Ss                :                ey               in     eh                         Pn
                   .                                  a                                              ee          Se                 ee                       iy              ‘
                  =                              7     -                       :            7      bar]      -                                                   ie tem               pe
                   ,                                                      a                                                                   Ps              |   ee           4       ‘
                                                   -                at                                                                                           <r      J   ¢      g
                                                     25            :                               he ae                              Pee.              me                  :        s
                                                                                              ieee ee                     Ge      See                       LER         ne
                                                                    5                                                            an                           ag
                                               :                 k                 3                     rin  he                              2                re           P        2
                                                    FE              etn                                  ee                           Ee                         tay    it
       .                                                     .              ae   a                      ee                 at ees,              3)      ;      “Sioa          p       .
                                      2                                ee            eee                                  al                           ee
               ‘                          ~~                         a              ae                 m=                                                              a            7
                  >                               .                     a:            at               "I                         c                    =                  <         x
          a       F              re                 ASS                               a     Ra               =               1          a gige    Ph a               8F.          a
 B    3            “                                a          gat               5                4              ae                 as         a"     -     ms    e«                      a
       A         "4             .         SE                S                   -       e             ca.     (au          oo         cs    me,                    .      a
      eS:           mei                      a       —        Y     .     -                    ,         —_             cc                          ¥  . 3    Ds  %    a
Log in to download the original file

2014-01-28 Planning & Organisation Committee Agenda(PDF, 4MB).pdf · 4.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.