Original source · versioned page text
B - Architectural Plans
The original of this document is very large (10.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSh Property Projects Australia Appendix B - Architectural Plans Prepared bu: OH Architecture Toowoomba Brisbane 216 Herries Street, Toowoomba 618 Brunswick Street, New Farm Phone: 07 4632 0516 Phone: 07 3254 1566 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 21 pages
Page 2
DEVELOPMENT APPLICATION DEVELOPMENT SUMMARY
EXISTING SITE AREA 635.46m²
EXISTING SITE COVERAGE 29%
PROPOSED DUPLEX (MULTIPLE HOUSING - TYPE 2) PROPOSED SITE COVERAGE 46%
LOT 135 ON RP132135 MAXIMUM BUILDING HEIGHT 8.450mm
11 MARGIT CRESCENT, SUNRISE BEACH PLOT RATIO 0.49:1
ARCHITECTURAL DRAWING PACKAGE
DRAWING REGISTER
DA 000 - EXISTING SITE PLAN
DA 001 - PROPOSED SITE PLAN
DA 002 - PROPOSED SUBDIVISION PLAN
DA 101 - PROPOSED BASEMENT PLAN
DA 102 - PROPOSED LOWER PLAN
DA 103 - PROPOSED UPPER PLAN
DA 104 - PROPOSED ROOF PLAN
DA 151 - PROPOSED ELEVATIONS
DA 152 - PROPOSED ELEVATIONS
DA 153 - PROPOSED ELEVATIONS
DA 161 - PROPOSED SECTIONS
DA 162 - PROPOSED SECTIONS
DA 163 - PROPOSED SECTIONS
DA 201 - SHADOW DIAGRAMS
DA 202 - SHADOW DIAGRAMS
DA 203 - SHADOW DIAGRAMS
DA 204 - SHADOW DIAGRAMS
DA 211 - STREETSCAPE ELEVATION
DA 301 - PROPOSED RENDER
DA 302 - PROPOSED RENDER
DATE: 08.04.2020
REVISION: A
PROJECT NO: 20-003 101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au
Page 3
EXISTING BUILDING TO BE REMOVED
ACCEPTED DEVELOPMENT
0 1 2 6m
20-003 | DA 000
11 MARGIT CRESCENT, SUNRISE BEACH| EXISTING SITE PLAN revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au Scale 1:200 @ A3 date: 08 April 2020
Page 4
PROPOSED GARAGE
FOOTPRINT UNDER
DWELLING UNIT 01 FOOTPRINT
DWELLING UNIT 02 FOOTPRINT
PROPOSED GARAGE
FOOTPRINT UNDER
0 1 2 6m
20-003 | DA 001
11 MARGIT CRESCENT, SUNRISE BEACH| PROPOSED SITE PLAN revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au Scale 1:200 @ A3 date: 08 April 2020
Page 5
DOUBLE GARAGE DRIVEWAY
DOUBLE GARAGE DRIVEWAY
0 .5 1 3m
20-003 | DA 101
11 MARGIT CRESCENT, SUNRISE BEACH| PROPOSED BASEMENT PLAN revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au Scale 1:100 @ A3 date: 08 April 2020
Page 6
GRASSED AREA
LIVING
POOL OUTDOOR ROOM GREEN ROOF
DINING
KITCHEN
WC
BUTLERS
UTILITY LDY
UTILITY LDY
BUTLERS
WC
KITCHEN
DINING
POOL OUTDOOR ROOM GREEN ROOF
LIVING
GRASSED AREA
0 .5 1 3m
20-003 | DA 102
11 MARGIT CRESCENT, SUNRISE BEACH| PROPOSED LOWER FLOOR PLAN revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au Scale 1:100 @ A3 date: 08 April 2020
Page 7
BED 02 WIR
BATH
WC
DECK
HALLWAY MASTER BED
RUMPUS
ENSUITE
BED 03
BED 03
ENSUITE
RUMPUS
HALLWAY MASTER BED
DECK
WC
BATH
BED 02 WIR
0 .5 1 3m
20-003 | DA 103
11 MARGIT CRESCENT, SUNRISE BEACH| PROPOSED UPPER FLOOR PLAN revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au Scale 1:100 @ A3 date: 08 April 2020
Page 8
ROOF
ROOF
0 .5 1 3m
20-003 | DA 104
11 MARGIT CRESCENT, SUNRISE BEACH| PROPOSED ROOF PLAN revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au Scale 1:100 @ A3 date: 08 April 2020
Page 9
FINISHES LEGEND
ELEVATION A - MARGIT CRECENT (EASTERN) ELEVATION
0 .5 1 3m
20-003 | DA 151
11 MARGIT CRESCENT, SUNRISE BEACH|PROPOSED ELEVATIONS revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au Scale 1:100 @ A3 date: 08 April 2020
Page 10
FINISHES LEGEND
ELEVATION B - WESTERN ELEVATION
0 .5 1 3m
20-003 | DA 152
11 MARGIT CRESCENT, SUNRISE BEACH|PROPOSED ELEVATIONS revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au Scale 1:100 @ A3 date: 08 April 2020
Page 11
FINISHES LEGEND
ELEVATION C - SOUTHERN ELEVATION
0 .5 1 3m
20-003 | DA 153
11 MARGIT CRESCENT, SUNRISE BEACH|PROPOSED ELEVATIONS revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au Scale 1:100 @ A3 date: 08 April 2020
Page 12
FINISHES LEGEND
ELEVATION D - NORTHERN ELEVATION
0 .5 1 3m
20-003 | DA 154
11 MARGIT CRESCENT, SUNRISE BEACH|PROPOSED ELEVATIONS revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au Scale 1:100 @ A3 date: 08 April 2020
Page 13
FINISHES LEGEND
OUTDOOR ROOM OUTDOOR ROOM
DOUBLE GARAGE ENTRY ENTRY DOUBLE GARAGE
SECTION 01
0 .5 1 3m
20-003 | DA 161
11 MARGIT CRESCENT, SUNRISE BEACH|PROPOSED SECTIONS revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au Scale 1:100 @ A3 date: 08 April 2020
Page 14
FINISHES LEGEND
HALLWAY RUMPUS MASTER BED DECK
LIVING KITCHEN OUTDOOR ROOM GREEN ROOF
POOL
DOUBLE GARAGE
SECTION 02
0 .5 1 3m
20-003 | DA 162
11 MARGIT CRESCENT, SUNRISE BEACH|PROPOSED SECTIONS revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au Scale 1:100 @ A3 date: 08 April 2020
Page 15
FINISHES LEGEND
DECK MASTER BED RUMPUS HALLWAY
GREEN ROOF OUTDOOR ROOM KITCHEN LIVING
POOL
DOUBLE GARAGE
SECTION 03
0 .5 1 3m
20-003 | DA 163
11 MARGIT CRESCENT, SUNRISE BEACH|PROPOSED SECTIONS revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au Scale 1:100 @ A3 date: 08 April 2020
Page 16
JUNE 21 - 9AM JUNE 21 - 12PM JUNE 21 - 3PM
QDC COMPLIANT BUILDING
20-003 | DA 201
11 MARGIT CRESCENT, SUNRISE BEACH| SHADOW DIAGRAMS revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au NOT TO SCALE date: 08 April 2020
Page 17
DECEMBER 21 - 9AM DECEMBER 21 - 12PM DECEMBER 21 - 3PM
QDC COMPLIANT BUILDING
20-003 | DA 202
11 MARGIT CRESCENT, SUNRISE BEACH| SHADOW DIAGRAMS revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au NOT TO SCALE date: 08 April 2020
Page 18
JUNE 21 - 9AM JUNE 21 - 12PM JUNE 21 - 3PM
PROPOSED BUILDING
20-003 | DA 203
11 MARGIT CRESCENT, SUNRISE BEACH| SHADOW DIAGRAMS revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au NOT TO SCALE date: 08 April 2020
Page 19
DECEMBER 21 - 9AM DECEMBER 21 - 12PM DECEMBER 21 - 3PM
PROPOSED BUILDING
20-003 | DA 204
11 MARGIT CRESCENT, SUNRISE BEACH| SHADOW DIAGRAMS revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au NOT TO SCALE date: 08 April 2020
Page 20
20-003 | DA 211
11 MARGIT CRESCENT, SUNRISE BEACH|STREETSCAPE ELEVATION revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au NOT TO SCALE date: 08 April 2020
Page 21
20-003 | DA 301
11 MARGIT CRESCENT, SUNRISE BEACH | PROPOSED RENDER revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au NOT TO SCALE date: 08 April 2020
Page 22
20-003 | DA 302
11 MARGIT CRESCENT, SUNRISE BEACH | PROPOSED RENDER revision: A
101 days rd . gran ge . qld . 4051 | 0431065811 | www.oharchitecture.com.au NOT TO SCALE date: 08 April 2020