Council archive · source document
Information Response - Grant Street - 050417 · MCU17/0009
Attached to the e-mail Information Response MCU17/0009 and OPW17/0037 - Email 1 of 2.
Issue - External Works
Information Required
4. The engineering and landscaping plans should be amended to include a concrete footpath along the frontage
of the site at around 1.5m wide.
Response
Refer to the revised architectural plans DWG No. DA-L01 – Issue F (Appendix A) prepared by Georgina
Price Design. The amended plans incorporate a 1.5m wide concrete footpath to the front of the site.
Issue - External Finishes
Information Required
5. Please provide details on the material for wall cladding types 1 and 2.
Response
Refer to the Schedule of Finished prepared by Georgian Price Design for a comprehensive list of the materials
and finished proposed for the exterior of the development.
I have further included revised drawings (Appendix B - Issue F) for the application due to the minor amendments that
were required as part of this Information Response.
This ends my client’s response to matters raised by Council within their information request. We ask that Council
proceeds with assessment of the application.
We look forward to Council processing the application at its earliest convenience. Do not hesitate to contact myself
personally if you have any questions.
Kind Regards,
Russell Green MPIA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information Response - Grant Street - 050417.pdfRelated documentApplication case desk ↗
Information Response - Grant Street - 050417.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.