SUPERSEDED - Minor Change Existing Approval 132002 220460 4 [As Published] · 132002.220460.4

of 9

Text shows just the words. Original shows the document exactly as it was published.

                                                                               Officer:               Glen Conforti
                                                                               Direct Telephone:      07 53296241
                                                                               Our Reference:         132002.220460.4 : JELDER
                                                                               Your Reference:        180080

               27 April 2018


               JDBA Certifiers
               PO Box 1365
               MOOLOOLABA QLD 4557
               [email protected]



               Dear Sir,
                                              Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 15 March 2018, requesting a minor change to an existing
               development approval. Council decided your requested changes.
               Details of the decision are as follows:
               1.     APPLICATION DETAILS

                Application No:                 132002.220460.4

                Street address:                 Bluetongue 4 Bryan St Sunshine Beach Qld 4567

                Real property description:      Lot 614 RP 48111

                Planning Scheme:                The Noosa Plan (27 November 2017)

               2.     DECISION DETAILS

               Council on 1 May 2003 decided to issue the following type of approval:

                Application No.        Type of Development

                132002.220460          Material Change of Use – Duplex Dwelling

               In relation to representations made about conditions 1, 4, 5, 7.3, 17, 18, 29, 30 and 51, Council on
               3 July 2003 resolved to:
               A.     Amend conditions to 1, 17, 18 and 51.
               B.     Delete condition 7.3.
               C.     Refuse to change conditions 4, 29 and 30 for the following reasons:
                      1.       Condition 4 requires privacy screens and hopper shutters that enclose the balcony
                               areas to be removed as the proposed screens and shutters contribute to an
                               appearance of additional building bulk.
                      2.       Conditions 29 and 30 require a 2 metre wide pathway to be constructed as the existing
                               path is likely to be damaged given the extent of work required, and patching the




                                                PO Box 141              P. (07) 5329 6500          [email protected]
                                                TEWANTIN QLD 4565       F. (07) 5329 6501          www.noosa.qld.gov.au
                                                                                                                 Page 1 of 9
Document Set ID: 20570273
Version: 4, Version Date: 01/05/2018
Full text of the other 8 pages

Page 2

                               footpath will result in an unsightly patchy footpath with potential trip hazards. The
                               additional width is sought to accommodate the high pedestrian movement in the area.
               D.     Advise the applicant that proposed material for balustrading (produced by Hi Light Industries
                      with approximately 80% transparency) meets the intent of condition 5 of the development
                      approval.
               In relation to a request to change the Development Approval, Council on 25 November 2004
                     resolved to:
               A.     Approve the plans numbered DA-01B to DA –06B, DA-07D, DA-08B, DA-09B, DA-10c & DA-
                      12B prepared by Scott Mayes Design Services and dated 25.7.04.
               B.     Approve changes to Conditions 1, 7, 17 and 18.
               C.     Delete Conditions 9 & 17.
               D.     Include three additional conditions.
               In relation to a request to change the Development Approval, Council on 7 February 2007 resolved
               to:
               A.     Approve a change to Condition 3;
               B.     Issue a Compiled Decision Notice
               In relation to the request to make a minor change to the existing approval, Council on 23 April 2018,
               decided to approve the requested changes. The changes are detailed below.
               A.     Approve the change.
               B.     Amend Conditions 1.
               3.     CURRENCY PERIOD OF APPROVAL
               The currency period for this development approval is stated in Condition 12 of the Assessment
               Manager Conditions.
               4.     ASSESSMENT MANAGER CONDITIONS
               Land Use
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are numbered DA-01B to DA –05B,
                      DA-07D, DA-08B, DA-09B, DA-10c & DA-12B dated 25.07.04 and prepared by Scott Mayes
                      Design Services and Sheet No. 3 of 6, drawing titled Proposed 3rd Floor Addition & 2nd Floor
                      alterations to Existing unit, prepared by Accolade Building Designs dated 28/02/2018 and as
                      annotated by Council and as may be amended by these conditions.
               2.     The building is not to exceed a maximum of 12 metres and 3 storeys above both natural and
                      finished ground levels.
               3.     A verification survey of the building is to be carried out by a Licensed Surveyor and a
                      certificate lodged with Council at completion of the work confirming compliance with the
                      maximum building height above natural surface, required by the provisions of the Planning
                      Scheme, apart from the lift shaft, which may extend in part to a maximum of 12.57 metres.
               4.     Any deck areas are not to be enclosed with shutters, glass panelling or the like, thus
                      remaining as open structures.
               5.     Balustrading of all decks is to be of an open transparent material.
               6.     The development must be undertaken and operated in a manner that causes no detrimental
                      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
                      lighting nuisance or other emissions.




                                                                                                       Page 2 of 9
Document Set ID: 20570273
Version: 4, Version Date: 01/05/2018

Page 3

               7.     The open space and setback areas are to be landscaped in accordance with Council’s Policy
                      on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably
                      qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior
                      to the premises being occupied and maintained at all times thereafter and to include the
                      following:-
                      7.1. Dense landscaping, comprising mature tree species is to be undertaken towards the
                           road frontage of the property and is to comprise a minimum of 3 x 100 Litre tree species
                           and include ground covers and shrubs. Landscaping provided on the road reserve is
                           to comprise a minimum of 2 street trees (100 litre);
                      7.2. Species planted are to comprise locally endemic species.
                      7.3. Deleted.
               8.     Any fencing provided in conjunction with the development is to be setback an average of two
                      (2) metres to any road frontage.
               9.     Deleted.
               10.    Security in the form of a cash bond or trading bank guarantee to the sum of $15 000 must
                      be submitted, to secure performance of all conditions of this approval, prior to the issue of a
                      Development Permit for operational works. The cash bond or trading bank guarantee will be
                      returned on performance of the conditions of approval less any costs incurred by Council in
                      respect of enforcing performance of this permit.
               11.    The requirements of this development approval are to be effected, prior to the use of the
                      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
                      this approval to effect compliance with conditions.
               12.    This Development Permit for a material change of use of premises lapses if:-
                      12.1. the use or erection of a building or other structure associated with the use, has not
                            been commenced by 20 March 2007, unless application is made and approved by
                            Council for an extension; or
                      12.2. the use of any premises pursuant to the Development Permit ceases.
               13.    The developer must obtain all of the other Development Permits referred to in the Decision
                      Notice, prior to obtaining a Development Permit for building works.
               Land Development
                      Vehicle Access
               14.    A 3.0 metre wide concrete access driveway shall be constructed from the street frontage of
                      the development into the site.
               15.    The vehicle access driveway shall be designed and constructed to Council’s design
                      standards and to grades that prevent vehicles from scraping and/or bottoming. Should any
                      driveways be constructed to grades that do not comply with AS2890.1-1993 or as modified
                      by Council’s Standard Drawing 9019, which allows a maximum grade of 1 in 4, Council will
                      require that the driveway be removed and reconstructed to levels that do comply.
                      To this extent the applicant shall submit detailed engineering plans prior to obtaining a
                      Development Permit for Operational Works that accurately illustrate the design levels for the
                      driveway and also the design gradients.
                      The applicant shall note that Council will not approve a driveway that results in vehicles
                      scraping and/or bottoming.
               16.    No vehicle will be permitted to reverse from the carpark area, down the driveway, and onto
                      the street. All vehicles shall enter and leave the site in a forward direction.
                      Vegetation Protection
               17.    Deleted.



                                                                                                        Page 3 of 9
Document Set ID: 20570273
Version: 4, Version Date: 01/05/2018

Page 4

                      Carparking
               18.    Carparking shall be provided on site, within the proposed basement carpark, generally as
                      shown on drawing number DA-02B, dated 25/07/04, as prepared by Scott Mayes Design
                      Services, project number 862 except as modified herein.
               19.    All carparking shall comply with the provisions of AS 2890.1-1993 for user class 3.
               20.    In accordance with AS2890.1-1993, section 5.3 - Headroom, the minimum head clearance
                      (headroom) at any point within the basement carpark shall be 2.2 metres.
               21.    All carparking shall be kept, maintained, and line-marked in a condition fit for use.
                      Roadworks Contributions
               22.    A roadworks contribution of $963.33 towards the Coastal Major Road Network shall be paid
                      to the Council prior to obtaining a Development Permit for Operational Works. This amount
                      will be subject to variations in the Price Index, All Groups Brisbane from June 2002 until the
                      date of payment.
                      Beach Access Contributions
               23.    A contribution toward the provision of beach access shall be paid in accordance with
                      Council’s Planning Scheme Policy PSP 4 on Beach Access Contributions prior to the issue
                      of a Development Permit for Operational Works. The amount of the contribution shall be
                      calculated at the rate current at the date of payment. An estimate only of the contribution
                      rate as of September 2002 was $65 per accommodation unit.
                      Earthworks
               24.    Prior to undertaking any excavation, the person acting on this permit shall contact all public
                      utility service providers to ascertain the location of their underground services.
               25.    The transportation of all materials to and from the site shall be undertaken in a manner such
                      that no particle matter escapes onto a public road. All vehicles carrying materials either to
                      or from the site shall be covered to prevent materials including dust being windblown from
                      the vehicle.
               26.    Any earthworks required on site shall be carried out in accordance with Section 3.8 of
                      Council's "Engineering Design Standards" manual and so as not to cause the ponding of
                      water on any adjoining lands or the blockage of, or interference with, any natural
                      watercourses.
                      Retaining Walls
               27.    A Registered Professional Engineer Queensland shall design any retaining walls greater
                      than one (1) metre in height and submit detailed plans for Council approval prior to obtaining
                      a Development Permit for Operational Works.
                      Retaining wall designs shall also incorporate a 1 metre high fence or similar if there is a risk
                      of people falling from the high side of the wall.
                      Frontage Works
               28.    Footpath improvements such as topsoiling, grassing, and tree planting will be required to the
                      street frontage in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines.
                      Grass shall be couch, free of weeds.
               29.    A new 2 metre wide concrete path shall be constructed along the frontage of the site where
                      there is not already a concrete path or where the existing path is damaged.
               30.    The new path shall be designed and constructed to levels that minimise the risk of
                      pedestrians from tripping or slipping and the path shall join neatly and smoothly with the
                      existing paths. Care shall be taken to protect any significant vegetation or any underground
                      services.




                                                                                                        Page 4 of 9
Document Set ID: 20570273
Version: 4, Version Date: 01/05/2018

Page 5

               31.    All redundant vehicular crossings to the site shall be removed and replaced by kerb &
                      channel and footpath paving in accordance with Council’s Standard specifications prior to
                      commencement of the use permitted by this permit.
               32.    A Development Permit for Operational Works shall be obtained prior to the commencement
                      of any frontage works. Footpath and property alignment levels may be obtained from
                      Council’s Works Directorate upon request.
                      Stormwater Drainage
               33.    Roof and surface water is to be collected on site and is to be discharged through at least two
                      (2) separate underground drain lines into Bryan Street via Council’s street drainage system.
                      The maximum discharge allowable to Council’s kerb & channel at any one location is 25
                      litres/second.
                      In this regard, a Development Permit for Building Works shall not be granted until a
                      Development Permit for Operational Works has been issued.
                      Headworks
               34.    Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
                      and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
                      Contributions respectively and at the rates applicable at the time of payment. An estimate
                      only of the contribution rates as of September 2002 under the current policies is as follows:

                        Water Supply     $ 3,570

                        Sewerage         $ 2,696

                        TOTAL            $ 6,266

                      All headworks contributions must be paid prior to the issue of a Development Permit for
                      Operational Works.
                      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
                      headworks contributions not be paid at the due time, Council shall call upon the trading bank
                      guarantee in full.
                      In the event that the Development Permit for Material Change of Use of Premises lapses or
                      is cancelled, the contribution or trading bank guarantee will be returned.

                      Erosion and Sediment Control
               35.    Any person acting on this permit shall prevent erosion and sediment export from leaving the
                      site. Site control measures such as silt fencing, controlled gravel access to the site and
                      controlled disposal of waste, will be necessary.
                      In this regard plans detailing the methods of controlling erosion and sediment are required
                      to be submitted to the Council for approval prior to obtaining a Development Permit for
                      Operational Works.
                      General
               36.    The site shall be connected to Council's existing water supply and sewerage reticulation
                      systems and be constructed in accordance with Council’s standards and requirements at no
                      cost to Council.
               37.    Water meters shall be provided to each individual unit and shall extend from the water supply
                      system to the property boundary in accordance with Council's standards.
               38.    Any damage caused to any public utility during the course of construction shall be repaired
                      to Council’s standards and at no cost to Council.
               39.    Any alteration of any public utility or other facilities necessitated by the development of the
                      land or associated construction works external to the site shall be at no cost to Council.


                                                                                                        Page 5 of 9
Document Set ID: 20570273
Version: 4, Version Date: 01/05/2018

Page 6

               Environmental Health
               40.    The development must be undertaken and operated in a manner that causes no detrimental
                      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
                      lighting, dust or odour nuisance or any other emissions in accordance with the nuisance
                      provisions of the Environmental Protection Regulation 1998. On the spot fines apply for such
                      offences.
               41.    Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or
                      located in a manner which prevents a noise nuisance beyond the subject land in accordance
                      with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot
                      fines apply for such offences.
               42.    All lift plant including motors, shall be situated within the building or suitably provided with
                      noise reduction measures and located as to prevent a noise nuisance beyond the subject
                      land in accordance with the nuisance provisions of the Environmental Protection Regulation
                      1998. On the spot fines apply for such offences.
               43.    Air conditioning units shall be located in a manner which prevents noise nuisance beyond
                      the subject land in accordance with the nuisance provisions of the Environmental Protection
                      Regulation 1998 and Council’s Local Law No. 12 - Control of Nuisances. On the spot fines
                      apply for such offences.
                      An occupier of premises where there is air-conditioning equipment must not use or allow the
                      use of the equipment -
                      43.1. before 7am or after 10pm on any day if it makes noise or causes noise to be made of
                            more than the higher of the following -
                              43.1.1. 40 dB(A)
                              43.1.2. 3 dB(A) above the background noise level
                      43.2. from 7am to 7pm on any day if it makes noise or causes noise to be made of more than
                            the lower of either of the following -
                              43.2.1. 50 dB(A)
                              43.2.2. 5 dB(A) above the background noise level
                      43.3. from 7pm to 10pm on any day if it makes noise or causes noise to be made of more
                            than 3 dB(A) above the background noise level.
               44.    Swimming/spa pool fencing, gates and wall openings within these areas to comply with
                      Australian Standard 1926 for pool safety. Display resuscitation chart at each pool, which are
                      free from Council’s Environmental Health Section.
               Building
               45.    There is to be no uncontrolled discharge of water onto the slope.
               46.    Stripping of vegetation for construction purposes should be minimised. If vegetation is
                      destroyed it should be reinstated immediately after construction is completed.
               47.    Additional load due to fill, construction equipment or stockpiled materials should not be
                      located on the dune slope. Filling in the open space area is to be avoided.
               48.    The use of vibratory equipment of any kind is not permitted to be used, including vibrating
                      rollers, the use of vibrating installation techniques for sheet piling and other construction
                      vibrations caused by excavating, earthmoving or demolition machinery or other similar
                      construction techniques.
               49.    A condition survey is to be carried out of adjoining buildings, structures and services prior to
                      any construction works taking place on site. If distress already exists, a photographic survey
                      shall be undertaken, the distress measured and a plan to monitor changes to distress shall
                      be implemented. A copy of this report is to be submitted to Council within 5 business days of
                      survey and prior to construction work proceeding.


                                                                                                        Page 6 of 9
Document Set ID: 20570273
Version: 4, Version Date: 01/05/2018

Page 7

               50.    Copies of all inspection reports by engineers are to be submitted to Council within 5 business
                      days of the inspection taking place.
               51.    The geotechnical engineer will be required to be on site for the whole of the time during the
                      basement excavation. No work of any such kind relating to the excavation of the basement
                      shall be carried out if he is not on the site supervising and directing this work. The consulting
                      geotechnical engineer shall carry out regular site inspections (and testing as required). Site
                      inspections shall be carried out prior to and during critical stages of construction (eg.
                      commencement of excavation, installation of piles, excavation near sensitive structures).
                      Such works shall only be carried out during dry weather conditions and if there is a risk of
                      sand movement occurring, all work shall be suspended until such steps, approved by the
                      geotechnical engineer have been taken to ensure that no further slippage will result.
               52.    The builder, landscaper and all workers associated with the construction of the works on this
                      site shall at all times comply with the directions of the consulting geotechnical engineer.
               53.    The applicant shall pay Council’s reasonable costs in relation to any geotechnical advice
                      sought by it in relation to this development provided that a quotation of the likely costs to be
                      incurred be obtained from the Council’s consultants Messrs Coffey Geosciences Pty Ltd and
                      that the amount of such costs be agreed to by the applicant before the advice is obtained.
               54.    Link wall movement shall be monitored throughout construction by an engineer and if
                      movement occurs construction is to be stopped immediately and appropriate action is to be
                      taken to arrest the movement. Further work shall only take place after a re-assessment of
                      the conditions on site by the engineer.
               55.    The client is to engage the services of a suitably qualified engineer to oversee the piling
                      works and copies of all inspection reports are to be submitted to Council within 5 business
                      days of the inspection taking place.
               Additional Condition:

               56.    Water saving devices shall be included for all dwelling units with a maximum 9L per minute
                      restrictor on all showers.
               57.    The 3rd storey façade to the front boundary shall be setback a minimum of 8.5m.
               58.    Both reversing bays shall be provided with a signpost and painted pavement markings to
                      clearly define the area as “No Parking - Reversing Area Only”.
               59. The developer must provide a suitably screened imperviously paved area large enough for
               all refuse and recycling containers
               5.     REFERRAL AGENCIES

               Not applicable
               6.     ADVISORY NOTES

               1.     The Environmental Protection Regulation 1998 and Local Law No.12 prohibit a builder from
                      making noise from:-
                      1.1. Monday to Saturday, before 7:00am or after 6:30pm
                      1.2. Sunday or public holiday, at any time.
                      A maximum penalty of $1,500 applies to an offence under these provisions
               In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
               cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where it
               could reasonably be expected to move into a roadside gutter, stormwater drain or a water course.
               On the spot fines apply for such offences
               7.     PROPERTY NOTES

               Not applicable


                                                                                                         Page 7 of 9
Document Set ID: 20570273
Version: 4, Version Date: 01/05/2018

Page 8

               8.       VARIATION APPROVAL DETAILS

               Not applicable
               9.       FURTHER DEVELOPMENT PERMITS REQUIRED

                     Type of Development Permit            Subject of the required Development Permit
                     required

                     Building                              Duplex Dwelling

                     Operational Works                     Landscaping, Car Parking and Access, Frontage
                                                           Works, Stormwater, Sediment & Erosion Controls

               10.      SUBMISSIONS

               Two properly made submissions were received.
               11.      RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               12.      OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.


               Yours faithfully,



               Glen Conforti
               Development Planner


               Enc:     Appeal Rights
                        Approved Plans/Documents
               cc.      Unitywater




                                                                                                       Page 8 of 9
Document Set ID: 20570273
Version: 4, Version Date: 01/05/2018

Page 9

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017



               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                    Page 9 of 9
Document Set ID: 20570273
Version: 4, Version Date: 01/05/2018

Used in these records

About this file

File size
205 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED - Minor Change Existing Approval 132002 220460 4 [As Published].pdf · 205 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.