Council archive · source document
10/0662 - Attached Plans in response to information request [As Published] · 142010.662
Plans and drawings: the text below has words only, no drawings.
Soft Landscaping Specification — 13 Grant Street NOOSA HEADS - Specifications below are in accordance with the Sunshine Coast Regional Council . Planning Scheme Policy 03 (Coastal Beachside) Planting Guidelines Soils Soils to comply with Australian Standard ( AS4410) ‘Soil for Landscaping & Gardens’. Soils to have a similar structure to that existing in the area. Approximate topsoil depths: turfed areas 100-150mm, shrubs 300mm & trees 500mm. Mulching After settling of a quality plant soil mix & once the plants are in place, planted areas are to have a semi decomposed, weed free Bush mulch installed to a depth of 75-100mm but kept 50mm. Ensure that there is a mulch free zone immediately surrounding the plant to avoid any rotting of the stems. Rake mulch smooth to finish 20mm below surrounding finished levels. Weeding & Fertilising Due to the large selection proportion of tocal-native plants, care must be taken in the treatment of weeds & plant fertilisation. Only Glysophate, a non residual herbicide is to be used to eradicate weeds. Slow release fertilisers that are nil or low in Phosphorus are to be used upon planting and then approx 12 months afterwards on new plants & trees. Garden Edging All edging to have smooth navigable lines & to sustain the movement of maintenance equipment & vehicles where necessary. At garden & pathway interfaces, the edging is to finish flush so that obstacles & trip hazards are not created. With this site, most the garden beds abut paving, sleeper retaining walls or fences. The proposed edging for the front garden, where the curved bed meets the Mary River pebble, is continuous concrete kerbing. Paving & Pavers in Lawn & Pebble All outdoor pavers to have a minimum R11 slip rating. Paver dimensions to be a min 500x500, porcelain or natural stone. Pavers to be sealed after laying for longevity. Paver-steppers to be lined with have geo-technical fabric underneath. Plant Maintenance Period - 12 Weeks This period shall commence from date of practical completion of the works. The 12 week maintenance period must include but is not limited to the following: Water new plants 3 times per week for the first 3 weeks, reducing to twice per week for the next 9 weeks. Checking new plants for pests, weeds & diseases & treat accordingly if necessary. Replacing any plants of the same specified type & quantity if they have failed or have been damaged during construction. Checking that mulched surfaces remain in a clean & tidy condition & reinstate mulch if necessary. Keep a dated Log Book of maintenance activities carried out throughout the period, recording the materials & fertilisers etc that have been applied. KATIM DESIGNS Creating Gardens for Greater Outdoor Living. Tel: 0412 454 155. Email: [email protected]. ABN 67 044 538 640 Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0662 - Attached Plans in response to information request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.