Rational Method Calculations
Project number:                                     20210008                                                                                   Calculations:                                       B. Parry
Street Address                                      9 Bottlebrush Ave
Locality:                                           Noosa Heads, Noosa Shire Council                                                           Date:                                               12/07/2021
                                                    Lot 147 RP 88934



Site Area Composition

Existing Site Roof Area:                                                188.407 m2                                                             Developed Site Roof Area:                                        161.348 m2
Existing Site Paved Area:                                              135.9653 m2                                                             Developed Site Paved Area:                                       196.082 m2
Existing Site Total (Impermeable):                                     324.3723 m2                                                             Developed Site Total (Impermeable):                               357.43 m2
Existing Site Total (Permeable):                                       181.2037 m2                                                             Developed Site Total (Permeable):                                148.146 m2

Total Site Area:                                                        505.576 m2                                                             Increase Impermeable Area:                                        33.058 m2
                                                                                                                                                                                                                  0.003 Ha.


Time of Concentration

Existing Site                                                                                                                                  Proposed Site

                                               tc                            5.0 mins                                                                                                         tc                   5.00 mins



Rational Method - Peak Flow Calculation

Existing Site                                                                                                                                  Proposed Site
                                   Area (Ha.)                              0.051 Ha.                                                                                                   Area                       0.051 Ha.
                                           fi                              0.642                                                                                                          Fi                      0.707
                                          1                                                                                                                                              1
                                              I10                           74.9 mm/hr                                                                                                       I10                   74.9 mm/hr
                                          C10                               0.83                                                                                                         C10                       0.84




A.E.P                                               Fy                             Cy                       Iy            Qy (m3/s)            A.E.P                                               Fy                     Cy            Iy            Qy (m3/s)
                                         4 EY                                                                     79.00               0.0058                                 3 Month (4 EY)                                                   79.00           0.0059
                                         1 EY                                0.8                    0.663        125.00               0.0116                                         1 (1 EY)                       0.8         0.673        125.00           0.0118
                                       0.5 EY                               0.85                    0.704        157.00               0.0155                                       2 (0.5 EY)                      0.85         0.715        157.00           0.0158
                                     20% AEP                                0.95                    0.787        192.00               0.0212                                       5 (0.2 EY)                      0.95         0.799        192.00           0.0216
                                     10% AEP                                   1                    0.828        226.00               0.0263                                   10 (10% AEP)                           1         0.841        226.00           0.0267
                                      5% AEP                                1.05                    0.870        258.00               0.0315                                    20 (5% AEP)                        1.05         0.883        258.00           0.0320
                                      2% AEP                                1.15                    0.953        300.00               0.0401                                    50 (2% AEP)                        1.15         0.968        300.00           0.0408
                                      1% AEP                                 1.2                    0.994        332.00               0.0463                                  100 (1 in 100)                        1.2         1.010        332.00           0.0471


Pre / Post Comparison

AEP                                                 Qincrease (m3/s)               Estimated storage (m3)
                                         4 EY                            0.0001                    0.0367
                                         1 EY                            0.0002                    0.0735
                                       0.5 EY                            0.0002                    0.0980
                                     20% AEP                             0.0003                    0.1340
                                     10% AEP                             0.0004                    0.1660
                                      5% AEP                             0.0005                    0.1990
                                      2% AEP                             0.0006                    0.2534
                                      1% AEP                             0.0007                    0.2927
Log in to download the original file

SWMP.pdf · 5.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.