Decision Notice - Approved by Delegation of Authority - MCU26 0003 (As Published)

of 7
                                                                                        Officer:            Matthew Pinese
                                                                                        Direct Telephone:   07 5329 6245
                                                                                        Our Reference:      MCU26/0003
                                                                                        Your Reference:     25023

               5 August 2026


               AE Hanson
               C/- Adamson Town Planning Pty Ltd
               PO Box 894
               COOROY QLD 4563
               [email protected]



               Dear Shane,
                                                         Decision Notice
                                                         Planning Act 2016

               I refer to your application and advise that on 3 August 2026, Council decided to approve the
               application, subject to conditions.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              MCU26/0003

                   Street address:              3 Grady Street, Kin Kin Qld 4571

                   Real property description:   Lot 206 on K6575

                   Planning Scheme:             Noosa Plan 2020 (Amendment 2 - 26 September 2025)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit for a Material Change of Use - Dwelling house
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

               PLANNING
                       When Conditions must be Complied With
               1.      Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                       the use commencing, and then compliance maintained at all times while the use continues.
                       Currency Period
               2.      This development approval lapses if the use has not happened by 3 August 2032 unless an
                       application to extend the currency period is approved by Council.

               ABN 97.969.214.121                                                                      PO Box 141
               noosa.qld.gov.au                                                                 Tewantin QLD 4565
               [email protected]                                                                 07 5329 6500
                                                                                                            Page 1 of 7
Document Set ID: 25031633
Version: 4, Version Date: 05/08/2026

Log in to download the original (Decision Notice - Approved by Delegation of Authority - MCU26 0003 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 6 pages

Page 2

                      Approved Plans
               3.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the table below.

                        Plan No.        Rev.    Plan/Document Name                                     Date

                        VG127 A100        5     Site Plan prepared by GS                               4/06/2026

                        VG127 A140        5     Existing and Demolition Plan prepared by GS            4/06/2026

                        VG127 A300        5     Floor Plan prepared by GS                              4/06/2026

                        VG127 A500        5     Elevations – Sheet 1 prepared by GS                    4/06/2026

                        VG127 A510        5     Elevations – Sheet 2 prepared by GS                    4/06/2026

                        2327 C02          A     Driveway Crossover and Details Plan prepared by 22/06/2026
                                                Stanford Consulting

                      Building Height
               4.     The maximum height of the development must not exceed 8 metres above the ground level.
                      Including where excavation is undertaken the exposed portion of the external façade of the
                      building.
                      Heritage
               5.     The existing heritage building known as St Luke's Anglican Church shall be retained on the
                      site and must not be demolished, removed or substantially altered except in accordance with
                      the approved plans.
               6.     Existing heritage features including the original building form, roof form and pitch, external
                      timber cladding, windows, doors, verandahs, decorative elements and stained glass windows
                      (where existing) shall be retained and protected unless otherwise approved by Council.
               7.     Any repair, replacement or extension works must utilise materials, colours, finishes and
                      detailing that are consistent with and complementary to the heritage character of the building.
                      The church is to retain the same colour scheme as shown on the attached Local heritage
                      place card.
               8.     Future external alterations to the heritage building, including new openings, awnings, decks,
                      balustrades, cladding, roofing materials or external services, must maintain the heritage
                      significance of the place and be generally consistent with the approved development.
               9.     Prior to commencement of building works, all onsite workers are to be advised by the site
                      foreman/supervisor that the former church is a heritage building and that no damage is to be
                      caused by construction activities, storage of materials, excavation works and vehicle
                      movements.
               10.    Prior to commencement of building works, an archival photographic record of the existing
                      heritage building shall be prepared and submitted to Council (see attached guideline). The
                      record shall include all elevations, principal internal spaces and significant architectural
                      features.




                                                                                                        Page 2 of 7
Document Set ID: 25031633
Version: 4, Version Date: 05/08/2026

Page 3

               ENGINEERING
                      Site Access and Driveways
               11.    A sealed access driveway must be provided from Gradys Street to all parking and
                      manoeuvring areas of the development. The works must be undertaken in accordance with
                      Stanford Consulting’s Driveway Crossover and Details Plan (2327 C02, Rev. A) and must
                      include in particular:
                      a.      a driveway crossover in accordance with Council’s standard drawing RS-056 and any
                              associated addendum.
               12.    Prior to the construction of the driveway crossover, the applicant must submit to Council:
                      a.      all necessary approvals from external service providers and external parties on which
                              the development works are proposed;
                      b.      certificates demonstrating currency of public liability insurance and works insurance
                              covering the works;
                      c.      a condition report including photographs of the frontage of the site; and
                      d.      a Construction Management Plan which much address the following:
                               i.      Traffic management during all phases of construction;
                              ii.      Adequate parking arrangements for works and deliveries;
                             iii.      appropriate traffic signage in accordance with the Manual of Uniform Traffic
                                       Control Devices (MUTCD); and
                             iv.       provision for safe vehicle and pedestrian access across the frontage of the site
                                       both during daily construction and after daily construction has ceased.
               13.    Certification by a Registered Professional Engineer of Queensland that states that the
                      driveway crossover is constructed in accordance with Stanford Consulting’s Driveway
                      Crossover and Details Plan (2327 C02, Rev. A) must be submitted to Council. This
                      certification must be submitted to Council within three (3) months of the commencement of
                      the use.
               14.    A final inspection and approval of the new driveway and completed reinstatement works by
                      Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
                      inspection.
                      Stormwater Drainage
               15.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge or disposed of on-site without causing scour or damage to the subject site or any
                      adjoining property.
                      Easements
               16.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               17.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               18.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.




                                                                                                          Page 3 of 7
Document Set ID: 25031633
Version: 4, Version Date: 05/08/2026

Page 4

                      Earthworks and Retaining Walls
               19.    All earthworks and associated batters/retaining structures, both above and below ground
                      level, both temporary and permanent, must be contained entirely within the subject site
                      unless written permission from the respective landowner(s) is provided to Council. All
                      earthworks must be undertaken in accordance with the provisions of Australian Standard
                      AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
               20.    Where the development involves excavation or filling over, or adjacent to, drainage, water
                      supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
                      provide a freeboard of 100mm above the finished ground surface level.
               21.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Damage to Services and Assets
               22.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               VEGETATION PROTECTION
                      Retention of Existing Trees and Vegetation
               23.    All trees and vegetation identified for retention must be protected in accordance with AS
                      4970, Protection of trees on development sites.
                      Removal of Existing Trees and Vegetation
               24.    Approved tree removal is limited to the two trees nominated in the approved ‘Existing &
                      Demolition Plan’ listed in this Decision Notice.
               25.    All existing native vegetation along the southern, eastern and northern boundaries is to be
                      retained, unless otherwise approved by Council.
               26.    Removal of existing trees and vegetation must be undertaken by a qualified person* and
                      must include:
                      a.      Stump grinding to below finished surface level
                      b.      Rectification to the finished surface levels and materials.
                      c.      No damage to other vegetation for retention.
                      d.      Legal disposal of all removed vegetation and debris.
                      e.      Replanting at a ratio of one replacement tree for each removed tree. Replacement
                              species are to be selected from the Noosa Council PSP2 Landscaping.
                      *(Refer to Advisory Note)
                      Fauna Management
               27.    Fauna or fauna habitat relating approved tree removal/clearing works must be managed by
                      a qualified person*.




                                                                                                       Page 4 of 7
Document Set ID: 25031633
Version: 4, Version Date: 05/08/2026

Page 5

               28.    Prior to felling or pruning, all trees are to be inspected for wildlife (i.e. koalas, possums, birds’
                      nests etc). If wildlife is present, the tree must not be felled or pruned until the wildlife has left
                      the tree or has been removed by a qualified person*.
                      *(Refer to Advisory Note)
               5.     REFERENCE DOCUMENTS

               Not applicable.
               6.     REFERRAL AGENCIES

               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Building and Construction Industry (Portable Long Service Leave) Levy
               1.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
                      Biosecurity Act 2014 – Fire Ant Control
               2.     Developers must remain vigilant for the presence of fire ants. Under the Biosecurity Act 2014,
                      individuals and businesses are responsible for ensuring that they follow the movement
                      controls for specific organic materials to help prevent the spread of fire ants within South
                      East Queensland’s fire ant biosecurity zones. Movement of a fire ant carrier from within a fire
                      ant biosecurity zone may need a biosecurity instrument permit. More information is available
                      on https://www.fireants.org.au/treat/business-andindustry/movement-controls
               3.     As this driveway is a private structure, the owner bears full responsibly for the standard of its
                      construction, maintenance and any liabilities associated with its construction. It is
                      recommended that professional advice be sought for the construction of the driveway to
                      ensure that the driveway is constructed in accordance with standard drawing RS-056.
                      Prestart, On and Off Maintenance Inspections Request
               4.     Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
                      business days notice of preferred inspection time.
               5.     If Council officers are required to undertake additional inspections of the same works, a
                      reinspection fee will be applicable in accordance with Council’s Fees and Charges register
                      applicable at the time.
                      Qualified person
               6.     A Qualified Person, for the purpose of:
                      a.      undertaking, supervising tree works and preparing arboriculture certification, is
                              considered to be a person with a minimum three years current experience in tree
                              protection and hazard identification/mitigation assessment and either:
                              i.       International Society of Arboriculture (ISA) certification; or
                              ii.      A Diploma of Arboriculture.
                      b.      Managing Fauna protection is considered to be a certified Fauna Spotter Catcher.
                      Retention of Existing Trees
               7.     The existing trees on adjoining properties must be retained and protected during
                      construction. To avoid doubt, this advisory note is not intended to exclude the operation of
                      Chapter 3 of the Neighbourhood Dispute Resolution Act 2011 following construction of the
                      development which is the subject of this development approval.



                                                                                                             Page 5 of 7
Document Set ID: 25031633
Version: 4, Version Date: 05/08/2026

Page 6

                      Equitable Access and Facilities
               8.     The plans for the proposed building work have NOT been assessed for compliance with the
                      requirements of the National Construction Code - Building Code of Australia (Volume 1) as
                      they relate to people with disabilities. Your attention is also directed to the fact that in addition
                      to the requirements of the National Construction Code as they relate to people with
                      disabilities, one or more of the following may impact on the proposed building work:
                      a.      the Disability Discrimination Act 1992 (Commonwealth);
                      b.      the Anti-Discrimination Act 1991 (Queensland); and
                      c.      the Disability (Access to Premises – Buildings) Standards.
               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.
               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required                 Subject of the required Development Permit

                Development Permit for Building Works               All building work.

               11.    SUBMISSIONS

               Not applicable.
               12.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               13.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.


               Yours faithfully

               Matthew Pinese
               Development Planner | Development Assessment
               Development & Regulation


               Enc:   Appeal Rights
                      Approved Plans/Documents




                                                                                                             Page 6 of 7
Document Set ID: 25031633
Version: 4, Version Date: 05/08/2026

Page 7

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                    Page 7 of 7
Document Set ID: 25031633
Version: 4, Version Date: 05/08/2026

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.