Council archive · source document
Traffic Report · MCU21/0175
FALL
TGSI TGSI TGSI
TGSI TGSI
1
51 60
FALL HRV - Heavy Rigid Vehicle FALL
SITE
BOUNDARY 40 29
AY
RH
1:
EASEMENT
16
E
LT VE
1
WA DRI TRENCH GRATE RETAINING WALL
RY
LIN
E
BIO RETENTION BASIN 1 22 m 2
RETAINING
WALL EXISTING FOOTPATH BIO-RETENTION BASIN 2 RL 8600
DA T 50 m 2
UN AN ALL TRENCH GRATE
EN
W
ING
BO OV RE TAIN
FALL
EC
DASHED LINE FOR ONE WAY ONLY
BO TGSI
AC
ROOF ABOVE
P PR UN
NS STAFF CARBAYS 4 CARS 2 MC IV DA
PE
DASHED LINE FOR RE
MC 2 SRV TA
IN AT
EO
AWNING ABOVE
ON
EW
ING
WA E RY
IVAT GW
AL
L BIN BIN BIN BIN
AY
ON
LL
OP LI
NE
PR RE
TA
ININ EGRESS EGRESS LY EN
BIN
SP
MRV A
BIN
E
PLANT CE
N CO
LA
BIN
I CE 12 HRV VE
RV NA
SE
N
MC 2 BUILDING 2 EGRESS
T
d Vehicle
EASEMENT 5 SHOWROOM DASHED LINE FOR
RE
y Rigi ROOF ABOVE
T
HRV - Heav
AIN
955 m 2
IN
G
DASHED LINE FOR
W
FFL 8930
AL
LEVEL ABOVE
L
UNDERCROFT
STAFF CARPARK
LIFT
12 CARS
2 MC STAIRS
1
6
ENTRY ENTRY
STAIRS
TGSI
TGSI
TGSI SHOPFRONT
ONE WAY ONLY
7 LINE OF
RL 8750
BALCONY 8 20
NT
OVER
TGSI
VENA
21
FALL CARPARK 1 FALL
BUILDING 1 SCALE 1:400
E CO
60 CARS
TROLLEY
RL 8750 SHOWROOM
BAYS
SPAC
50 GFA 1720 m 2
FALL
41 12.5 HRV 12.5m
excl airlock
Overall Length 12.500m
OPEN
FFL 8930
LOBBY
TGSI TGSI TGSI 1:31 TGSI FALL Overall Width 2.500m
TGSI TGSI
Overall Body Height 4.300m
ATE
FALL
1 Min Body Ground Clearance 0.417m
SERVICE LANE
PRIV
51 60 Track Width 2.500m
KERB
Lock-to-lock time 6.00s
Curb to Curb Turning Radius 12.500m
AD
FALL FALL
28
Clearance Envelope 0.500m
RO
TGSI
SITE 7 BIKES
BOUNDARY 40 29
RAMP
1.20
ATE
1:
EASEMENT 2.4 5.9 1.4
16
TGSI
1
TRENCH GRATE RETAINING WALL
V
EXISTING FOOTPATH BIO-RETENTION BASIN 2 RL 8600 RAMP 1.20
DASHED
LINE FOR
PRI
50 m 2 ROOF
ABOVE
TURNAROUND
TGSI 1
BAY
C
1:
M
20
8
1
RA
M
P
1.2
0
RL 8300 CARPARK 2
TGSI
15 CARS RL 8300
9 MC
EX
IS TIN
15
MC 9
MC 6
G 9
FO
OT
PA PYLON
TH
SIGN
TRENCH GRATE
BIO-RETENTION BASIN3
20 m 2
STORMWATER
EASEMENT
FOOTPATH LAYOUT
TO BE CONFIRMED
GROUND FLOOR PLAN-FOR INFORMATION [210726]
1.500 @ A3
NOTES:
SCALE 1:750
1. MAPPING UNDERLAY PROVIDED BY NEARMAP. MAY PRELIMINARY
BE SUBJECT TO DETAILED DESIGN & SITE SURVEY.
2. ALL UNITS SHOWN ARE IN METERS (m) UNLESS ADVICE ONLY
OTHERWISE NOTED
27 July 2021
SCALE PROJECT PROJECT NUMBER ORIGINAL SIZE
AS SHOWN ON PLAN TTM CONSULTING PTY LTD LOT 2, NOOSA CIVIC, NOOSAVILLE 21BRT0259 A3
ABN 65 010 868 621 DRAWING TITLE DRAWING NUMBER REVISION
LEVEL 8, 369 Ann Street, BRISBANE QLD 4000
NORTH CLIENT P.O. BOX 12015, BRISBANE QLD 4003 21BRT0259-02 B
VEHICLE SWEPT PATH ANALYSIS
B 27-07-21 BASE PLAN REVISED AH TL SC
STOCKWELL T: (07) 3327 9500 F: (07) 3327 9501 DESIGN VEHICLE SRV, MRV AND HRV DATE SHEET
A 23-07-21 ORIGINAL ISSUE AH TL SC E: [email protected] W: www.ttmgroup.com.au 27 Jul 2021 1 OF 1
REV. DATE AMENDMENT DESCRIPTION DRAWN CHECKED APPROVED
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Traffic Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.