23616DA - Change to Existing Approval [As Published] · 132003.221132.6
23616DA
Environmental Services. These logs should not create a fire
hazard.’
Page 20; Section At the end of the third sentence add the following:
8.1: ‘This monitoring of the gully vegetation will be co-ordinated with, and
take into account the results of, the water cycle analysis (via a mass
water balance approach) required by Condition 55.’
Landscape Management Plan
43. The development shall be undertaken in accordance with the Landscape Management Plan
prepared by EDAW Gillespies and dated October 2004 and as may be amended by these
conditions. An amended Landscape Management Plan incorporating the required amendments
shall be lodged for approval prior to issue of a Development Permit for Operational Works.
44. The following corrections and amendments shall be incorporated into the Landscape
Management Plan:
Page 4: Delete reference to Viewing Platform from the Key to the Site Access
Map.
Page 7: Delete ‘50’ in the seventh box in the key and replace with ‘30’.
Page 17; fourth dot Delete the current words and replace with the following:
point in the ‘On- ‘. Access to the Private Open space within the Conservation Residential
going maintenance’ Precinct is restricted to the owners of properties within the
column: Conservation Residential Precinct. There is no public access.
Access to the Private Open space areas is restricted to pedestrians. All
vehicles, horses, bicycles, trail bikes and motorbikes are prohibited.’
Page 27; last Delete the last sentence and replace with the following:
sentence: ‘Design and construction details for the fauna friendly fence are to be
provided as part of the Operational Works Application for the first stage
of the development. All of the fauna-friendly fence and all of the gates
and signage are to be provided during the first stage of development.’
Page 31; Figure Correct this figure so that it is consistent with Figure 2-9 in the
showing network of Stormwater and Water Quality Management Plan by WBM Oceanics.
swales and detention
basins:
Page 33; Master Add the pedestrian/bikeway connection to Swanbourne Way.
Plan:
Pages referring to Correct pages 4, 8, 11, 19, 23, 24, 25, 26, 30 and 33 in accordance
the Fire with the conditions of approval for the Fire Management Plan.
Management Plan:
Sediment and Erosion Control
45. Detailed staged Sediment and Erosion Control Plans are to be prepared for the site and shall be
prepared to the reasonable satisfaction of Council and in accordance with the Institution of
Engineers Australia ‘Engineering Guidelines for Queensland Soil and Sediment Control’ (June
1996) and in particular using Checklist No. 3 from that document. The sediment and erosion
control plans shall cover all development on site (during the construction, establishment and
operational phases) including rehabilitation and remediation.
46. The Sediment and Erosion Control Plans will deal with the staging of the development generally
in accordance with WBM’s Report ‘Lensworth Lake Doonella – Stormwater and Water Quality
Management Plan – Version 2, Revision 3’ of 30/3/03.
47. The Sediment and Erosion Control Plans shall also include the Public Open Space area and
shall:
47.1. Identify existing erosion problems, and
Page 10 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616DA - Change to Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 122 KB (small file)
- File type
No other editions are linked here.