Original source · versioned page text
RAL23/0015 DEVELOPMENT APPLICATION TO RECONFIGURE A LOT (1 LOT INTO 2 LOTS & ACCESS EASEMENT) AT 11 BILLABONG WAY, TEWANTIN (Referred from Planning & Environment Committee Meeting dated 6 February 2024 - Item 5.1 - for further consideration) · Report
GENERAL COMMITTEE MEETING 12 FEBRUARY 2024
3. To ensure the safety of people and property on this property is maintained, all
buildings and structures must be sited constructed in accordance with the bushfire
management conditions of Council Approval RAL23/0015.
Lot 2
4. During inclement weather events up to and beyond the 1% AEP event, this lot
experiences flooding along the eastern property boundary.
5. All structures are to be constructed within the building envelope shown on the
approved plan. For more information refer to Council Approval RAL23/0015.
6. To ensure the safety of people and property on this property is maintained, all
buildings and structures must be sited constructed in accordance with the bushfire
management conditions of Council Approval RAL23/0015.
C. Include the following Reference Document:
Plan No. Rev. Plan/Document Name Date
- 1 Bushfire Evacuation Plan prepared 13.11.2023
by Equilibrium Ecology
D. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original