Change Representations Pomona Subdivision

of 3

Page text shows just the words. Original shows the document exactly as it was published.

         e. provision of sight distances adequate for the design speed of the road; and
         f. signage and linemarking.
         g. a turning head constructed between lots 6 & 7.


It is proposed that only the turning head will be constructed as part of this development
and a road reserve provided between lot 6 & 7 to allow future extension of the road to the
property to the north should this be developed in the future. It is requested Council
consider including an additional condition in the Decision Notice to make this clear.



Condition 38a)

38. Pedestrian and bicycle facilities must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and must include
in particular:
         a. a 2 1.5 metre wide footpath within one side of the new road’s verge for the entire
         length of the new road, connecting to the existing footpath on Pavilion Street;

It was agreed by Council’s development engineer the footpath could be reduced from 2.0m
to 1.5m to assist with verge profile adjacent to the existing properties.



Condition 47

47. No retaining walls/earthworks are to be undertaken and/or constructed or occur, with
only minor works permitted (including those around lots 8 & 9) that are necessary to
facilitate the roadworks, stormwater management, flood immunity for lot 10 and connection
to services. The development must be undertaken in a manner which responds to the
site’s constraints such that the natural landform is generally maintained. Any earthworks
proposed must be detailed clearly in the application for Operational Works and be limited
in extent to the reasonable satisfaction of Council.

Clarification is required to ensure the minor earthworks proposed on lots 8 & 9 would be
consistent with requirements of minor works.



Condition 49

49. An underground connection to reticulated water and sewerage must be provided to
each lot in accordance with the standards and requirements of Northern SEQ Distributor–
Retailer Authority (Unitywater). No lower-pressure sewer system (private pump systems)
are permitted in order to provide sewer connection to the lots.

A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to each lot.

The owner is working towards a reticulated gravity sewer through the showgrounds land
to the south. There is an ‘in principle’ agreement to extend the sewer main to connect this
lot. Further written correspondence is imminent and can be provided as part of the
Operational Works package.

This condition is considered unreasonable as Council is not the water and sewerage
authority.

 FM6002Q/1-01/07/2017                                                            Page 2 of 3
Log in to download the original file

Change Representations Pomona Subdivision.pdf · 553 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.