Attached to the e-mail MCU14/0084 IDAS Form 1 Report, Attachment A Plans, Attachment B (1) Engineering report Email 1 of 4.
consulting engineers ii | | STRUCTURAL DESIGN CONCEPT PROPOSED RESIDENCE FOR HASLER AT 71 SEAVIEW TERRACE, SUNSHINE BEACH Prepared for Mr Hasler and Noel Robinson Architects 29 July 2014 Job No. 14517 Issue ‘B’ JOB NO: 14517 Noosa: 07 5449 9600 civil structural project management Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337 infrastructure buildings subdivisions industry & mining jublic spaces PO Box 61, Noosaville, QLD 4566, Australia www.todconsulting.com TOD CONSULTING PTY LTD ABN: 39128805336
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 14 pages
Page 2
1.0 2.0 3.0 4.0 5.0 6.0 Table of Contents Summary Introduction Project Description 3.1. Scope 3.2 General 3.3. Site Cond itions 3.4 Construction Management Plan 3.5 Construction of Retaining Walls and Excavation Design Loading Criteria 4.1. General 4.2 Codes and Specifications 4.3. Loading Criteria 4.4 Deflection Criteria Materials Specification 5.1. Concrete 5.2 Reinforcing Steel 5.3. Formwork 5.4 — Structural Steel 5.5 Screw Piling Structural Framing System 6.1 General Structural System 6.2 Lateral Resistance 6.3 Drainage 14 14 15
Page 3
Appendix MCU Tod Consulting Engineers Drawing List 1.0 14517-— OPO1 General Notes OP02 General Notes OP03 Site Plan OP04 Site Temporary Access and PilingPlan OP05 Site Construction Works ,Stage 1-3 OPO06 Site Construction Works ,Stage 4-7 OP07 Building Sections OP08 Construction Details Sheet 1 OPO9 Construction Details Sheet 2 0OP010 Earthworks —Cut Plan Summary The proposed residence at 71 Seaview Terrace, Sunshine Beach comprises the following: ° Generally three living levels ° Access driveway at road /roof level, ramping down to garage level e External terraced areas, pool and access corridors, stairs and lift The Structural design of the project will consider the steep sandy nature of the site and will be carried out in accordance with the relevant Australian Standard Codes of Practice including but not limited to the following: e AS/NZS 1170 Part 1 Loading Code: Dead and Live ° AS/NZS 1170 Part 2 Loading Code : Wind e AS/NZS 1170 Part 4 Loading Code : Earthquakes ° AS2159 Piling Code ° AS 3600 Concrete Structures ° AS 3700 Masonry Code e AS 4100 Steel Structures e AS2783 Swimming Pool Code ° Building Code of Australia The maximum loading deflection criteria to be adopted for the development is as follows: a) Horizontal (Lateral) movement (wind and seismic) Total not greater than Height/500 (at maximum permissible stress loads) Inter-storey not greater than Floor to Floor Height/500 (at maximum permissible stress loads) b) Horizontal (lateral) movement of retaining walls due to horizontal loads from retained soil and surcharge — not to exceed height/500. Cc) Vertical movement (dead plus live load)
Page 4
2.0 Slab and beams are to be designed to achieve the following maximum deflection criteria Incremental Deflection General Span/500 or 15mm (whichever is less) Long Term Deflection Slabs Span/500 or 15mm (whichever is less) Beams Span/500 or 15mm (whichever is less) Spandrel Beams — Span/500 or 15mm (whichever is less) Total allowable 20mm max to end spans (Slab + Beam) 20mm to internal spans Cantilever Span/250 or 10mm (whichever is less) The structural framing system is to comprise a reinforced concrete frame utilising permanent reinforced concrete slabs, beams and columns. External decks and the garage floors are to be 40 MPa reinforced concrete slabs and beams. All piled footings are to be founded into very dense sands, stiff sandy clays or extremely weathered sandstone, at least 5m below any 27° sand slip line projected from the base of the slope, and at least 7m below existing ground line, whichever is deeper. In some localised areas, piled footings may need to be founded deeper than these levels depending on excavation depth / sequence and pile loads. Introduction The following design criteria details the required structural performance criteria for the proposed residence. It establishes the overall structural performance requirements along with a series of minimum standards for specific design and construction technical controls of the works. Reference Documentation: e Site Survey Drawings by Lawrence & Partners e Noel Robinson Architectural Drawings dated 23.5.2014 81.269.B13 - Sk 03.01 Rev. P1 Sk 03.02 Sk 03.03 Sk 05.01 Sk 05.02 Sk 05.03 Sk 05.04 Sk 05.05 Sk 05.06 Sk 05.07 Sk 05.08 Sk 05.09 Sk 05.10
Page 5
Geotechnical Report by SCG dated 24.3.2009, and Morrison Geotechnical Report dated October 2014 , job no. DE 14/231 3.0 Project Description 3.1 3.2 3.3 Scope The work covers the entire main house building structure including but not limited to contiguous CFA (Continuous Flight Auger) concrete piles and both vertical and raked concrete-filled galvanised screw steel piled footings, slabs on ground, retaining walls, external pavements, structural steel supports for claddings, reinforced block walls, suspended reinforced concrete floors, roofs, walkways, stairs and other minor structural items. A significant component of the project is staged the construction of the contiguous piled retaining structures which form part of the permanent structure. Cantilevered reinforced concrete contiguous piled walls are utilised throughout the building works to provide a completely stable building platform during all the construction stages, and these will also greatly enhance the completed building’s capacity to resist lateral loads and add significantly to the stability of all areas uphill of the proposed works by limiting the extent of any future surface sand slips. Once the contiguous piled walls are completed and fully tied back to each other via a system of ground beams and floor slabs at the three main floor levels, the remainder of the structure can be readily constructed on a safe and stable building platform using traditional blockwork and floor formwork methods. General The proposed residence comprises the following: ° Three living levels to the main residence e Access driveway at road/roof level. ° External terraced areas, pool and access corridors Site Conditions The information discussed below has been interpreted from the geotechnical reports by Morrison Geotechnical (dated September 2009) and SCG Consulting Engineers dated 24 March 2009. In brief, boreholes drilled across the site encountered fairly consistent upper layer conditions comprising loose sands gradually increasing in density with depth. Deeper surface conditions vary 5
Page 6
3.4 across the site from dense sands to very stiff sandy clays overlying extremely weathered sandstone at approximately RL33. Ground water seepage and springs are likely to be encountered at any hard impermeable layers following wet weather. Due to the topography of the site all precautions must be taken to minimise risk of surface sand slips and possible flow of loose surface sands from excavated trenches and building platforms. The existing surface sands are very loose and slope at gradients of between 23° and 32°. The additional Geotechnical information provided in the Morrison Geotechnical Report to 22.4m depth will be used to further develop the structural design, and refine construction procedures. Preliminary assessment indicates extremely weathered rock at approx RL33.3, which will significantly reduce the risk of slope instability and provide massive horizontal restraint to retaining walls. The loose surface sands are very prone to erosion and slippage, particularly where vegetation is disturbed or removed, or stormwater becomes concentrated. Construction Management Plan The site is located at the northern end of a sealed access driveway off Seaview Tce, with no off-site parking and set down areas for construction equipment. The size of vehicles accessing the site is limited by the width and layout of the common driveway. The Contractor will face various challenges on this project due to the limited access, however it is clear that local Builders have had sufficient experience with these types of sites eg, at the adjacent homes in Seaview Tce; the recent construction of Mr Pat Rafter’s house at 48 Seaview Tce; and current construction along Park Rd, Noosa. We suggest that the site is sufficiently large to accommodate all construction vehicles and equipment/materials storage, providing the Contractor plans his work carefully, and builds staged temporary access ramp/platforms similar to our layout on Tod Consulting drawing 14517-P4. During the initial piling stage of the project there will be very few subcontractors (Piling Contractor and part-time Surveyor) on site and therefore “Stage 1 Temporary Access Area” of about 700m? indicated on Drawing 14517-P4 should be adequate for all access, 6
Page 7
parking and storage. Total number of cars on site would be less than five. Once the contiguous piling is completed, screw piling will be completed over the site and again there would be few other Subcontractors involved in the works that time. (Piling Contractor and Part-time Surveyor) By this stage the Contractor should have extended his temporary access/parking/storage platform across to the northern area of the building, “Stage 2 Temporary Access Area” indicated on 14517 — P4, greatly increasing parking, access and storage for materials. Total number of cars on site would not exceed 10. During this time there would still only be about 4-5 different subcontractors on site:- Concretor/formworker Reinforcing fixing Plumber / Electrician ( both part-time) Surveyor (part-time) By the time the builder is constructing the floor slabs, we would expect the number of subcontractors will increase up to approximately 10 occasionally, but the accessible area for parking and storage will be greatly increased, to include some areas of the permanent structural driveway slab, probably exceeding 1500m?. The successful Contractor will be required to provide, as a contractural condition of the building approval, a detailed Construction Management Plan appropriate for this site and the extent of piling, excavation and concreting work. The Plan shall cover the following issues:- e Pre-construction Submit a programme, construction method statements, traffic & parking management plan, environmental and erosion protection measures, nominated tree protection measures, etc as per specifications, for approval. Complete Existing Condition Dilapidation Inspection reports on all surrounding buildings, structures, and access driveway. Establish all slope stability survey monitoring points. e Initial Site Access and Parking Construct temporary benching and turn-around areas on site and establish site office, temporary utilities connections, and recheck survey monitoring. Build sediment & erosion control measures, temporary stormwater collection and disposal. It may be economical to lease additional vacant land in the area to provide temporary parking of construction vehicles, and storage of equipment and materials. A vacant lot exists on McAnally Drive. 7
Page 8
3.5 Parking would be prohibited in the access driveway running from Seaview Tce to the site, and in the Council Beach Carpark. e Contiguous Piling Complete ground injection grouting (to ensure there is absolutely minimal disturbance to surface sands,) temporary access tracks and/or platforms, and install reinforced CFA contiguous pile walls. The grout piling rig can be off-loaded in Seaview Tce and driven on rubber tracks to the site, as discussed with a Piling contractor, cement grout and reinforcing is to be delivered progressively as the piling proceeds. Temporary parking and materials storage will be at the south west corner of the site. e Excavation Works A small excavator will be sufficient to remove and load sand into normal-sized tip trucks for removal from site, perhaps with a small hoist, Conveyor or crane from lower terraced areas. Stockpiling of material on site will be limited by Geotechnical approval to avoid localised surface slips. Subject to more detailed analysis it may be possible to stockpile some materials in areas where the stiff clays and/or weathered sandstone are closer to the surface. Temporary access ramps & terraces can then be constructed below the contiguous piled walls to create additional temporary parking and storage areas across the site. Refer to our drawing 14517 - P4. e Foundations and Screw Piling Once the main bulk excavation levels have been achieved, stable terracing can be prepared to expand access, parking and material storage on-site. The Screw Piling Rig can be brought in on rubber mats from Seaview Terrace, and piles delivered in short lengths and welded together on-site as lengths of pile are installed. e Structural Works The foundation beams, pile caps, floor beams, slabs, columns, and load-bearing walls etc, can be constructed by traditional methods with materials being delivered readily via the access driveway as required. The length of construction materials will be limited by the size of delivery vehicles which can safely access the bitumen driveway. Construction of Retaining Walls and Excavations The majority of the site is sloping at approximately 26° towards the north-east while the south-east and north-west areas of the block slope much more steeply at around 32° towards the east.
Page 9
Any material above a 27° line projected from the base of the hill of slope is considered unstable and totally unsuitable for supporting any permanent foundations or landscape structures. The area along the western boundary slopes at approximately 26° and up to 30° at the north-west corner. The area west and uphill of the site slopes at a more gentle slope, and is occupied by light- weight timber residential structures, and a reinforced concrete pool supported on deep piled foundations. Our design and suggested construction procedure has taken into account the critical staged nature of the proposed excavations, close proximity of adjacent properties (especially the piled pool structure), the additional soil loadings due to the uphill gradient, the loose and unstable nature of the upper sand layers (particularly when vegetation is removed or disturbed) and the limitations of piling machine size which can access the site. The key features of our design and construction proposed are:- e Stabilise surface sands to a depth of approximately 3m, along BOTH western and south-western boundaries using URETEK (or similar) ground injection e Establish survey markers across site and on adjacent properties for continual regular monitoring during construction e Install extensive “Sediment/Erosion Control” fences e Install temporary stormwater collection and disposal system; install permanent spoon drain and gully pits along west boundary. e Avoid ground vibrations by avoiding percussion piling and/ or compaction. e Prepare engineered truck turn-around area(s) and access tracks/ramps e Construct piled temporary access or engineer-designed cut-fill access for 50T CFA pile rig and complete the western contiguous piled walls e Progressively remove sand east of the new western CFA piled wall, and construct permanent driveway slab in sections between the western piled wall and the piled wall on the seaward side of the driveway. e Extend temporary access/storage/ramp areas towards north and back to south-east e Complete the third CFA piled wall which forms the lower level platform, and gradually remove the sand to form the lower level bulk excavation platform e At all times the retaining walls are fully connected back to the uphill adjacent wall, drainage is in place, and the CFA piling rig is operating on stable flat platforms without any risk of slip or toppling
Page 10
e Floor slabs laterally restrained by raking piles will provide additional permanent horizontal strutting to the base of retaining walls. e Excavated sand can be removed by small hoist, conveyor belt, or crane to dump trucks and used as excellent clean fill at another project e Piling contractors have advised it is quite feasible to move the CFA piling machine on rubber matting or use rubber tyres on the tracks from the Seaview Terrace cul-d-sac to the site e Once the contiguous piled retaining systems, piling, screw piles and raking piles are in place (gradually progressing downslope), the remaining work will be typical load-bearing walls and formed in-situ reinforced concrete construction e Sub-floor drainage will be connected through all contiguous piled walls into vertical “wick” drains at approx. 6m centres e Separate subfloor drains will be provided to relieve any localised ground water build-up. e Grout piled walls will be patched and grouted where necessary e A “dry” internal masonry wall and drained cavity will be provided at all contiguous piled retaining walls e Back-fill over URETEK grouting with topsoil and re-vegetate for perimeter planting as per Landscape Details 4.0 Design Loading Criteria 4.1 4.2 General The following outlines the design loading criteria for the project. Notwithstanding this outline, the structure will allow for all imposed loads as outlined by the relevant Australian codes, and any loads imposed from the selected construction methodology for the project works. The loads during construction of the contiguous piled wall must be analysed at every incremental stage of excavation and strutting. Construction loads, especially loaded trucks and stored materials will be agreed and confirmed with Contractor prior to commencement of construction. This is particularly important for the first stage construction of the driveway slab. Codes and Specifications The structural design of the project will be carried out in accordance with the relevant Australian Standard Codes of Practice including but not limited to the following: AS/NZS 1170 Part 1 Loading Code Dead and Live AS/NZS 1170 Part 2 Loading Code Wind AS/NZS 1170 Part 4 Loading Code Earthquakes AS 3600 Concrete Structures * *& & & 10
Page 11
4.3 * AS 3700 Masonry Code * AS 4100 Steel Structures * Building Code of Australia Loading Criteria Refer to the architectural documents for the extent of different floor use areas and hence different live and super-imposed dead loadings, unless noted otherwise:- Dead Load Floor slabs and beams self weight as calculated Floor finishing — lobby and terraces Internal 2.0 kPa (tile and bed) External 3.0 kPa Air con and plumbing services, and light weight ceiling 0.75 kPa + point loads Other 0.5 kPa Masonry partitions (where required) self weight as calculated Soil, waterproofing, insulation self weight as calculated Live Load* Balconies and stairs 4.0kPa Residential areas 3.0 kPa (Point Load 1.8 kN) Internal garages 5.0 kPa (Point Load 9 kN) Driveway, Service Vehicle Delivery/Loading Area 15.0 kPa (Point Load 31 kN) (or construction loading) Mechanical and electrical plant rooms 8.0 kPa (min) (Point Load 4.5 kN) External Terrace Areas 5.0 kPa (min) «x Design Live Load must never be less than construction loading Earthquake Load The building will be designed for seismic load in accordance with the relevant Australian Standard being AS/NZS 1170.4. e Importance Level 2 e Soil Factor: Class Ce (most of loose sand layer to be removed from building platform) 11
Page 12
4.4 e Earthquake Design Category | Wind Load The building will be designed for wind loads in accordance with the relevant Australian Standards (being AS/NZS 1170.2) for the following parameters: Basic Wind Velocity VF - 57m/s (Ult Strength Limit State) Region - B Terrain Category - 2.0 Multiplier factors Mz, cat = 0.96, Ms = 1.0, Mh = 1.3 Design Wind Speed - 72 m/s Ult limit state - 60 m/s Permissible Stress Design Soil Retaining Structures: Refer also to final Geotechnical Report Soil Density = 19 kN/m® Horizontal Pressure - sloping backfill Ko = 0.75; horizontal backfill Ko = 0.5 Surcharge: adjacent blocks — allow 10 kPa L.L. surcharge. Provide vertical wick drainage behind all contiguous piled retaining structures at 6m centres Provide continuous sub-soil drains behind all conventional retaining walls Factor of safety against sliding:- temporary 1.2, permanent 2.0 Deflection Criteria a) Horizontal (Lateral) movement (wind and seismic) Total not greater than Height/500 (at permissible stress loads) Inter-storey not greater than Floor to Floor Height/500 (at permissible stress loads) b) Vertical movement (dead plus live load) Slabs and beams are to be designed to achieve the following maximum deflection criteria: Incremental Deflection General Span/500 or 15mm (whichever is less) Long Term Deflection Slabs Span/500 or 15mm (whichever is less) Beams Span/500 or 15mm (whichever is less) Spandrel Beams = Span/500 or 15mm (whichever is less) Total allowable 20mm to end spans (Slab + Beam) 20mm to internal spans Cantilever Span/250 or 10mm (whichever is less) Pre camber As required 12
Page 13
5.0 Materials Specification 5.1 drawings) 5.2 5.3 5.4 Concrete Concrete Strengths (generally, unless noted otherwise on It is envisaged the following concrete strengths will be used for various elements across the design, taking special care with respect to the highly corrosive marine environment. Floor slabs and beams 32 MPa min internal, 40 MPa external Load bearing walls and columns 32 MPa min internal, (typical) 40 MPa external Foundations 25 MPa min/40 MPa max Pool 40 MPa External structural concrete elements of the building will have a design durability classification B2, which complies with Table 4.3 AS 3600. (40 MPa concrete with 50mm external cover). Reinforcing Steel High strength Ductile Grade 500 MPa reinforcing steel will be used in the design. Formwork Formwork class is to be in accordance with the architectural specifications and the relevant Australian Standards. Tolerances are to be suitable for the purpose to which they are to be used, but shall not exceed a maximum deviation of 6mm measured over a 3 meter straight edge. Permanent steel formwork (Condek or similar) may only be used in internal areas to support suspended concrete slabs, and must be rigidly propped in accordance with the supplier's written specification. Structural Steel Structural steel elements of the building will be designed in accordance with the relevant codes. These elements will have a design durability which complies with AS/NZS 4100. All external steel and exposed internal steel shall be hot dipped galvanised and painted with coat of an approved high-build zinc-rich epoxy paint, followed by a top coat of Polysiloxane, or Polyurethane. 13
Page 14
5.5 Screw Piling All screw piling is to be hot dipped galvanised and epoxy painted for the upper 2m, as well as filled with concrete grout. 6.0 Structural Framing System 6.1 General Structural System: The proposed building is a three-storey reinforced concrete structure with a reinforced concrete contiguous piled retaining wall system to support excavations of up to about 3.5m. A mixture of grout replacement piles and concrete-filled galvanised screw piles are proposed to support vertical loads, and a range of raking painted and galvanised screw pile are intended to provide additional horizontal stability to the foundation by acting in either tension or compression. Structural System Summary: e 450mm diameter contiguous CFA piled retaining walls, founded sufficiently below excavation level to provide vertical capacity and passive resistance to horizontal soil pressures Screw piles ranging from 50-80T to support column loads Raking screw piles to provide additional horizontal resistance to soil loads, wind and earthquake loads e Reinforced concrete ground beams and slabs will be used to provide adequate permanent horizontal “strutting” of retaining walls and rotational stability to pile/slab/upper column connections, and to resist bending moments caused by pile eccentricity e Sub-floor areas will be drained to relieve any potential build-up of ground water pressure e Areas behind contiguous piled walls will be fully drained by using drilled-in steel “wick” drains, connected through the base of the wall and discharged appropriately e Upper structure comprises reinforced concrete columns, walls and beam/slab system e Roof slabs will need a high grade trafficable waterproof membrane or a trafficable slab may be considered over an insulated waterproofing layer on the structural slabs. e Garden terrace and mounded soil areas will be generally constructed on suspended slabs over voids to avoid imposing additional soil loads to the steep sandy slopes e The elevated timber walkway running east-west from R.L.34 to R.L.26.2 will be supported on 7-8m deep piles, designed to withstand lateral drag of the loose surface sands. 14
Page 15
6.2 Lateral Resistance The lateral resistance to wind, earthquake and lateral soil forces will be provided by a combination of reinforced concrete and blockwork bracing walls, contiguous piled walls, column/beam framing action. Raking tension and compression piles will be designed and RPEQ certified by others based on their own design-installation methods and shall have the capacity to safely resist horizontal loads from wind, earthquake and lateral soil pressures, with a permanent factor of safety against sliding exceeding 2.0. It is clear that the construction of the fully strutted and braced deep contiguous piled walls will add significantly to the general stability of the slope and of the areas uphill from all sections of new work, including the adjacent properties. 6.3 Drainage The areas behind the contiguous piled retaining walls will be drained by the use of vertical perforated “wick” drains at approximately 6m centres, connected through the piled wall just at the underside of the floor slab level. The design will include 100mm sleeved agricultural drain lines in gravel and geotextile at the bottom of all retaining walls and under all floor slabs in cut areas throughout the building. Properly designed temporary and permanent drainage and silt collection must be installed to avoid the risk of surface sands washing off site, during and after construction of the project. BARRY GEORGE - MIE(Aust). CPEng. NPER3, RPEQ 1924 TOD CONSULTING ENGINEERS 15