Appendix D - Soil Test and Site Classification Report
SOIL TEST REPORT
Address : Lot 1 on RP112348
20 Woongar Street
Boreen Point
Client : N. Cusack
Date : 15 December 2021
Report No : 210450 (S)
Phone: 07 5447 1304
Email: [email protected]
Address: PO Box 1661, Noosa Heads, Qld. 4567
Australian Soil Investigations Pty Ltd
ABN: 11147854439
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 14 pages
Page 2
1.0 INTRODUCTION:
Australian Soil Investigations has performed a limited site investigation and established a site classification in
accordance with AS 2870-2011 at the above address. This site classification report does not include an assessment
of Slope Stability or Landslide Risk.
This report must be read and considered as a whole. All of our recommendations and appendices
attached must be read, considered and followed by all people involved in this project including
the client to ensure adequate long term performance of a footing system constructed on this site.
If you are unsure of any of the requirements herein, you must seek clarification from this office.
2.0 SITE CLASSIFICATION:
After considering the results of our field investigation performed on 30/11/2021 we have classified this site as:
Class P
The classification has been calculated from test work performed on the soil profile encountered on the day of our
fieldwork and consideration of AS2870-2011. Any disturbance of the soil profile may result in a change to the
classification.
The ‘P’ classification relates to the poor bearing capacity, uncontrolled fill and abnormal moisture conditions
encountered during our testing on site. Please refer to our definitions list appended to this report for further
descriptions of these characteristics.
The abnormal moisture conditions are due to, the presence and proximity of trees to the allotment and existing trees
located on the proposed construction area that will be removed.
With respect to potential surface movements through seasonal moisture variations, the site could be considered
equivalent to a class H1 site.
Site Classification: The site classification is calculated in accordance with the “AS2870-2011 Residential Slabs and
Footings-Construction” and relates to the estimation of Ys, “The characteristic surface movement” within reactive soil
profiles. The limits used for this classification are as follows:
Predicted Surface Movement Classification
Ys = <=20mm S Slight
Ys = >20 – 40mm M Moderate
Ys = >40 – 60mm H1 High-1
Ys = 60 – 75mm H2 High-2
Ys = > 75mm E Extreme
Problem sites P Problem
3.0 SITE DESCRIPTION:
The construction area has a gradient in the order of 4 – 15% has been filled to form a level pad.
Vegetation on the construction area (and nearby surrounds) consists of grasses and scattered tall trees
The trees are located on and adjacent the proposed construction site.
The trees are of a height and proximity that could affect the moisture conditions within the proposed construction site.
Refer to the appendices to the rear of this report for guidance on Trees and Construction.
The existing surface drainage is fair and sub-surface drainage is fair.
Australian Soil Investigations 1 ASI Ref: 210450(S)
Page 3
4.0 FINDINGS:
The soil profiles encountered are shown on the attached borelog sections.
No water table was encountered during our testing program.
The sandy soils encountered are susceptible to collapse when unconfined. This may effect excavations and result
in additional earthworks and increased concrete volumes. Temporary shoring or Forma-Tube may be required to
retain the sands prior to concreting.
We have calculated the following Ys value for the soil profile:
Ys = 40-50 mm
Our field testing did not encounter any unexcavatable rock, but we do anticipate stable unexcavatable rock at
relatively shallow depths beneath the base of our test sites.
Fill, which we have described as uncontrolled was encountered to the following depths.
Test Site 1 -300 mm Test Site 2 -700 mm
At the time of writing this report we were unable to describe the fill as controlled. This can be revised if documentation
is available indicating that this fill has been compacted and certified in accordance with AS 3798-2007.
The following foundation material will provide a safe bearing capacity (100 kPa) for buildings within the scope of AS
2870-2011.
FOUNDATION MATERIAL - NATURAL STIFF SANDY CLAY
We strongly recommend that any footing design for this allotment be carried out by a suitably qualified
person in accordance with AS2870-2011.
Where site drainage and landscaping does not conform to the specifications of AS 2870-2011 and CSIRO
Information Service Sheet BTF-18 (2003) damage to the building can be expected. A single copy of this
document is issued with the original issue of this report. Please consult your builder or contact this office
to obtain a copy.
NOTE: The information contained herein has been compiled following our field and laboratory testing,
accepted engineering theory and discussions with and information supplied by our client, whom is
noted on the header page of this report. We offer no warranty for the use of this report by other
parties without prior written consent from this office.
The report must be read in conjunction with the attached appendices. If you do not have a copy of
these please contact our office and a copy can be issued to you.
WADE HOLMES – QBCC 1120066
for and on behalf of:
AUSTRALIAN SOIL INVESTIGATIONS – QBCC 15072110
Australian Soil Investigations 2 ASI Ref: 210450(S)
Page 4
$33(1',&(6
$ 6,7(3/$1
% %25(/2*6
& '(),1,7,216
' /,0,7$7,216
( 5(&200(1'$7,216
& %XLOGHUV
& 2ZQHUV
& %XLOGHU2ZQHU7UHHV
) '(7$,/6+((76
'3OXPELQJ5HTXLUHPHQWV&ODVV0++ (6LWHV
'6LWH'UDLQDJHUHFRPPHQGDWLRQV
[OCR of page images]
APPENDICES
SITE PLAN
A.
B. BORELOGS
Cc DEFINITIONS
D
LIMITATIONS
E. RECOMMENDATIONS
C.1- Builders
C.2 - Owners
C.3 - Builder/Owner - Trees
F. DETAIL SHEETS
D.1 - Plumbing Requirements Class M, H1, H2 & E Sites
D.2 - Site Drainage recommendations
Page 5
Revision Description Date
.
.
.
SITE PLAN
Site Drainage
Vegetation AUSTRALIAN
BH 2
SOIL INVESTIGATIONS
Borehole location.
Slope
Title SITE PLAN
measured as a percentage gradient from
high ground to low ground. Project
DO NOT DIMENSION OFF THIS DIAGRAM. Date: Drg No.
Rev.
Page 6
Australian Soil Investigations LOG SECTIONS Ref No. 210450
Client: Nick Cusack
Location: (Lot 1 on RP112348) 20 Woongar Street, Boreen Point
Date:30/11/2021
(House Site)
Depth TEST SITE No 1 P Depth TEST SITE No 2 P
100 Silty Sand (SM) 1 100 Fill Sand Clay (CH) 1
200 fine to coarse grained, dark 1 200 medium to high plast., orange 1
300 brown, roots, moist, loose 1 300 with fine to coarse grained sand 1
400 Gravelly Sand (SM) 1 400 moist, soft 1
500 fine to coarse grained, brown, 1 500 1
600 with fine to moderate gravel, 1 600 1
700 moist, loose 1 700 1
800 1 800 N.S.L. Silty Sand (SM) 1
900 1 900 fine to coarse grained, dark 1
1000 1 1000 brown, roots, moist, loose 2
1100 1 1100 Gravelly Sand (SM) 3
1200 1 1200 fine to coarse grained, brown, 3
1300 1 1300 with fine to moderate gravel, 3
1400 Sandy Clay (CL) 1 1400 moist, loose 7
1500 low to medium plast., orange 1 1500 12
1600 with fine to coarse gravel and 1 1600 Sandy Clay (CH) 13
1700 sand, moist, becoming stiff 1 1700 medium to high plast., orange 12
1800 1 1800 with fine to coarse gravel and 13
1900 1 1900 sand, stiff 16
2000 2 2000 8
2100 3 2100 8
2200 3 2200 Sandy Clay (CH) 20
2300 5 2300 medium to high plast., pale grey +
2400 Sandy Clay (CH) 8 2400 red, with fine grained gravel
2500 low to medium plast., pale grey 10 2500 and sand, moist, very stiff
2600 orange, with fine grained gravel 13 2600
2700 and sand, moist, stiff 16 2700
2800 20 2800
2900 + 2900
3000 End (approaching weathered 3000 End
3100 Sandstone) 3100
Depth = mm below ground level.
P = blows per 100mm penetration with an approved 9kg penetrometer.
Notation such as (SP) refers to the soil description to Table A1 AS1726 ‘Guide to the description
identification and classification of soils’.
Solid lines represent sharp interface between different soil types. Dotted lines represent
gradation form one soil type to another.
Abbreviations used
UTP - unable to penetrate, Bec. – becoming, N.S.L. – Natural Surface Level
Med. – medium, MW - Moderately weathered
EW - extremely weathered, Plast. - Plasticity
No recovery means unable to extract samples from the base of the bore hole because the soil
will not bind in the auger head.
The colour of the soil is often abbreviated, for example Gy = grey Or = orange.
Page 7
& '(),1,7,216
6DIH%HDULQJFDSDFLW\7KHVRLOQRPLQDWHGLQWKLVUHSRUWDVDVXLWDEOHIRXQGDWLRQPDWHULDOKDVDQDOORZDEOHEHDULQJFDSDFLW\RI.3D
DQGLVFRQVLGHUHGVDIHIRUWKHFRQVWUXFWLRQRIDGZHOOLQJWKDWLVLQDFFRUGDQFHZLWK$6
&RKHVLYH6RLOV &OD\VDQGVLOWVRLOVWKDWKDYHLQKHUHQWFRKHVLYH ELQGLQJ VWUHQJWK
*UDQXODU6RLOV *UDYHOVDQGVDQGVRLOVWKDWKDYHQRFRKHVLYHVWUHQJWK,QGLYLGXDOSDUWLFOHVFDQIORZXQGHUFHUWDLQFRQGLWLRQV
&RQWUROOHG)LOO0DQXDOO\SODFHGVRLOZKLFKKDVEHHQSODFHGDQGFRPSDFWHGWRDFKLHYHVXIILFLHQWEHDULQJFDSDFLW\WRVXSSRUWDVWUXFWXUH
DFFRUGLQJWR$6)LOOFHUWLILHGDW/HYHODFFRUGLQJWR$6DQG5HODWLYH)LHOG'HQVLW\LVFRQVLGHUHGFRQWUROOHGILOO
3DUWLDOO\&RQWUROOHG0DQXDOO\SODFHGVRLOZKLFKDSSHDUVWRKDYHEHHQFRPSDFWHGXQGHUFRQWUROOHGFRQGLWLRQVEXWDWWKHWLPHRISUHSDULQJ
WKLVUHSRUWQRFRPSDFWLRQFHUWLILFDWHVXLWDEOHIRUFRPSOLDQFHWR/HYHORI$6KDGEHHQSUHVHQWHG
8QFRQWUROOHG)LOO0DQXDOO\SODFHGVRLO RYHUO\LQJWKHQDWXUDOVRLOV ZKLFKLVQRWDGHTXDWHWRVXSSRUWDQRUPDOO\ORDGHGIRRWLQJRUIORRUVODE
RUVWUXFWXUDOORDG
8QH[FDYDWDEOH5RFN6WURQJPDWHULDOWKDWGRHVQRWVRIWHQLQZDWHURUFROODSVHXQGHUWKHFRPELQDWLRQRIORDGLQJDQGZHWWLQJ0DWHULDOWKDW
FDQQRWUHDGLO\EHH[FDYDWHGE\DEDFNKRH
([FDYDWDEOH5RFN$URFNOLNHPDWHULDOLQFOXGLQJVKDO\PDWHULDODQGVWURQJO\FHPHQWHGVDQGRUJUDYHOZKLFKGRHVQRWVKULQNRUVZHOOZLWK
FKDQJHVLQVRLOPRLVWXUHEXWLVUHDGLO\H[FDYDWDEOHZLWKDFRQYHQWLRQDOEDFNKRH
/RDG %HDULQJ :DOO ,Q RXU GHVLJQ ZRUN D ORDG EHDULQJ ZDOO LV GHILQHG DV DQ\ ZDOO LPSRVLQJ RQ WKH IRRWLQJ D VHUYLFH ORDG JUHDWHU WKDQ
N1P$ORDGEHDULQJZDOOZLOOQRUPDOO\EHVXSSRUWHGE\DVODEWKLFNHQLQJRUIRRWLQJLQRXUVODEGHVLJQV
1DWXUDO 6WUDWD 5HIHUVWRVRLOWKDWLVQHLWKHUILOORULPSRUWHGPDWHULDOEXWRQHWKDWLVLQLWVRULJLQDOXQGLVWXUEHGVWDWHDQGSRVLWLRQ
*UDYHO&RDUVHSDUWLFOHVODUJHUWKDQVDQGVL]HEXWOHVVWKDQPPLQGLDPHWHU
&REEOHV5RFNVJUHDWHUWKDQPPLQGLDPHWHUEXWOHVVWKDQPPLQGLDPHWHU
%RXOGHUV5RFNVODUJHUWKDQPPLQGLDPHWHU
62,/675(1*7+,1',&$7,216
121&2+(6,9( *5$18/$5 62,/6 &2+(6,9(62,/6
/RRVH $PPURGEDUFDQEHHDVLO\SXVKHGLQE\KDQG 6RIW &DQEHPRXOGHGE\OLJKWILQJHUSUHVVXUH
0HGLXP $PPURGEDUFDQEHSXVKHGLQPPZLWK )LUP &DQEHPRXOGHGE\VWURQJILQJHUSUHVVXUH
'HQVH GLIILFXOW\
'HQVH $PPURGHFDQQRWEHSXVKHGLQE\KDQG 6WLII &DQQRWEHPRXOGHGE\ILQJHUV&DQEHLQGHQWHGE\
WKXPEZLWKSUHVVXUH
9HU\6WLII &DQEHLQGHQWHGRQO\E\WKXPEQDLO
1% 7KHVHLQGLFDWLRQVVKRXOGEHXVHGIRUJXLGDQFHRQO\7KHVHLQGLFDWLRQVFDQYDU\JUHDWO\XQGHU$EQRUPDO0RLVWXUH&RQGLWLRQV
3OHDVHFRQWDFW$XVWUDOLDQ6RLO,QYHVWLJDWLRQVIRURQVLWHFODULILFDWLRQRIVRLOVWUHQJWKV
' /,0,7$7,216
$6 7KLV UHSRUW KDV EHHQ FRPSOHWHG LQ DFFRUGDQFH ZLWK $6WKH$XVWUDOLDQ6WDQGDUGIRU ³5HVLGHQWLDO6ODEV DQG
)RRWLQJV´GHVLJQDQGFRQVWUXFWLRQ7KHVWDQGDUGSURYLGHVSHUIRUPDQFHEDVHGFULWHULDIRULWVGHVLJQUHFRPPHQGDWLRQV7KLVFULWHULDLVQRW
EDVHGXSRQFUDFNRUPRYHPHQWIUHHSHUIRUPDQFH7KHFRGHVWDWHV³,WLVDFNQRZOHGJHGWKDWPLQRUIRXQGDWLRQPRYHPHQWVRFFXURQQHDUO\
DOOVLWHVDQGWKDWLWLVLPSUDFWLFDEOHWRGHVLJQDIRRWLQJV\VWHPWKDWZLOOSURWHFWWKHEXLOGLQJIURPPRYHPHQWXQGHUDOOFLUFXPVWDQFHV´7KH
FRGHSURYLGHVJXLGDQFHRQWKHDVVHVVPHQWRIFUDFNVL]HVLQZDOOVDQGIORRUVDQGVXJJHVWVDFFHSWDEOHOLPLWV6KRXOGWKHSRWHQWLDORZQHU
QRW EH VDWLVILHG ZLWK WKLV FULWHULD ZH VKRXOG EH QRWLILHG VXFK WKDW DQ\ UHFRPPHQGDWLRQV FDQ EH DPHQGHG WR VXLW WKHLU UHTXLUHPHQWV
+RZHYHULWVKRXOGEHQRWHGWKLVFRXOGGUDPDWLFDOO\LQFUHDVHWKHFRQVWUXFWLRQFRVWV
)LHOG 7HVWLQJ 2XU LQYHVWLJDWLRQ DQG WKH UHVXOWV DQG UHFRPPHQGDWLRQV FRQWDLQHG KHUHLQ KDYH EHHQ FRPSLOHG IROORZLQJ FDUHIXO
FRQVLGHUDWLRQ RI RXU FOLHQWV VXSSOLHG LQIRUPDWLRQ DQG LQVWUXFWLRQV $Q\ YDULDWLRQ WR WKLV LQIRUPDWLRQ PD\ UHQGHU WKLV UHSRUW LQFRUUHFW
)XUWKHUPRUHWKLVUHSRUWPXVWQRWEHXVHGE\DQ\SHUVRQRWKHUWKDQRXUFOLHQWQRWHGDWWKHKHDGRIWKHUHSRUW
&OLHQW6XSSOLHG,QIRUPDWLRQ,QZULWLQJWKLVUHSRUWZHKDYHFRQVLGHUHGDOOWKHLQIRUPDWLRQVXSSOLHGWRXVE\WKHFOLHQW6KRXOGWKHFOLHQWRU
KLV DJHQW KDYH RPLWWHG WR VXSSO\ XV ZLWK UHOHYDQW LQIRUPDWLRQ RXU UHSRUW PD\ EH LUUHOHYDQW DQG RU LQDSSURSULDWH :H GR QRW DFFHSW
UHVSRQVLELOLW\IRUWKHFRQVHTXHQFHVLQVXFKFDVHV
%RUHORJV7KHVRLOSURILOHVUHSRUWHGLQRXU%RUHORJV6HFWLRQUHSUHVHQWWKHVRLOFRQGLWLRQVDWRXUWHVWVLWHVDQGKDYHEHHQORFDWHGZHUHZH
EHOLHYH EHVW UHSUHVHQWV WKH VRLOV ZLWKLQ WKH SURSRVHG EXLOGLQJ HQYHORSH +RZHYHU VRLO FRQGLWLRQV FDQ FKDQJH GUDPDWLFDOO\ RYHU VKRUW
GLVWDQFHV WKHUHIRUH VXFK SRLQW W\SH H[SORUDWLRQ SURJUDPV PD\ QRW ORFDWH DOO YDULDWLRQV ,I VLWH SUHSDUDWLRQVH[FDYDWLRQV UHYHDO VRLO
FRQGLWLRQVWKDWDUHGLIIHUHQWIURPWKRVHVKRZQLQRXU%RUHORJVZHPXVWEHQRWLILHGLPPHGLDWHO\&KDQJHVWRWKHVLWHFODVVLILFDWLRQDQGRU
IRRWLQJGHVLJQPD\EHQHFHVVDU\
6LWH,QIRUPDWLRQ7KHVLWHLQIRUPDWLRQVKRZQRQWKHDWWDFKHGSODQVVXFKDVVXUIDFHJUDGHVDQGOHYHOVDUHHVWLPDWLRQVWDNHQGXULQJRXU
ILHOGWHVWLQJDQGDUHSURYLGHGIRUDURXJKJXLGH7KH\PXVWQRWEHXVHGIRUDQ\GHVLJQSXUSRVHV6LWHSODQGLPHQVLRQVDUHDVPHDVXUHG
IURPWKHQRWHGYLVLEOHVLWHIHDWXUHGXULQJRXUILHOGWHVWLQJ
3UHYLRXV)XWXUH([FDYDWLRQV7KHUHFRPPHQGDWLRQVFRQWDLQHGLQWKLVUHSRUWKDYHQRWFRQVLGHUHGWKHHIIHFWVRIDQ\SUHYLRXVFXUUHQWRU
IXWXUH H[FDYDWLRQV PLQHV RU VORSH LQVWDELOLW\ SUREOHPV WKDW DUH QRW KLJKOLJKWHG LQ WKH FOLHQWV VXSSOLHG LQIRUPDWLRQ RU WKDW ZDV QRW FOHDUO\
YLVLEOHGXULQJRXUILHOGWHVWLQJ,IVXFKIHDWXUHVH[LVWZHPXVWEHDGYLVHGVRWKDWRXUGHVLJQFDQEHDGMXVWHGWRDFFRPPRGDWHWKHP
$XVWUDOLDQ6RLO,QYHVWLJDWLRQV $SSHQGL[3DJHRI $SSHQGLFHV
[OCR of page images]
C. DEFINITIONS
Safe Bearing capacity: The soil nominated in this report as a suitable foundation material has an allowable bearing capacity of 100KPa
and is considered safe for the construction of a dwelling that is in accordance with AS2870-2011.
Cohesive Soils: Clays and silt soils that have inherent cohesive (binding) strength.
Granular Soils: Gravels and sand soils that have no cohesive strength. Individual particles can flow under certain conditions.
Controlled Fill: Manually placed soil which has been placed and compacted to achieve sufficient bearing capacity to support a structure
according to AS 2870-2011. Fill certified at Level 1 according to AS 3798 and 95% Relative Field Density is considered controlled fill.
Partially Controlled: Manually placed soil which appears to have been compacted under controlled conditions but, at the time of preparing
this report, no compaction certificate suitable for compliance to Level 1 of AS 3798-2007 had been presented.
Uncontrolled Fill: Manually placed soil (overlying the natural soils) which is not adequate to support a normally loaded footing or floor slab
or structural load.
Unexcavatable Rock: Strong material that does not soften in water or collapse under the combination of loading and wetting. Material that
cannot readily be excavated by a backhoe.
Excavatable Rock: A rock-like material including shaly material and strongly cemented sand or gravel which does not shrink or swell with
changes in soil moisture, but is readily excavatable with a conventional backhoe.
Load Bearing Wall: \n our design work a load bearing wall is defined as any wall imposing on the footing a service load greater than
10kN/m. A load bearing wall will normally be supported by a slab thickening or footing in our slab designs.
Natural (Strata): Refers to soil that is neither fill or imported material but one that is in its original undisturbed state and position.
Gravel: Coarse particles, larger than sand size, but less than 60mm in diameter.
Cobbles: Rocks greater than 60mm in diameter but less than 600mm in diameter.
Boulders: Rocks larger than 600mm in diameter.
SOIL STRENGTH INDICATIONS
NON-COHESIVE (GRANULAR) SOILS COHESIVE SOILS
Loose A 12mm rod/bar can be easily pushed in by hand Soft Can be moulded by light finger pressure.
Medium A 12 mm rod/bar can be pushed in 300mm with Firm Can be moulded by strong finger pressure.
Dense difficulty
Dense A 12mm rode cannot be pushed in by hand. Stiff Cannot be moulded by fingers. Can be indented by
thumb with pressure.
Very Stiff Can be indented only by thumb nail.
N.B. These indications should be used for guidance only. These indications can vary greatly under Abnormal Moisture Conditions.
Please contact Australian Soil Investigations for on-site clarification of soil strengths.
D. LIMITATIONS
AS2870-2011: This report has been completed in accordance with AS2870-2011 the Australian Standard for “Residential Slabs and
Footings” design and construction. The standard provides performance based criteria for its design recommendations. This criteria is not
based upon crack or movement free performance. The code states “It is acknowledged that minor foundation movements occur on nearly
all sites and that it is impracticable to design a footing system that will protect the building from movement under all circumstances”. The
code provides guidance on the assessment of crack sizes in walls and floors and suggests acceptable limits. Should the potential owner
not be satisfied with this criteria we should be notified such that any recommendations can be amended to suit their requirements.
However, it should be noted this could dramatically increase the construction costs.
Field Testing: Our investigation and the results and recommendations contained herein have been compiled following careful
consideration of our clients supplied information and instructions. Any variation to this information may render this report incorrect.
Furthermore this report must not be used by any person other than our client noted at the head of the report.
Client Supplied Information: |n writing this report we have considered all the information supplied to us by the client. Should the client or
his agent have omitted to supply us with relevant information our report may be irrelevant and / or inappropriate. We do not accept
responsibility for the consequences in such cases.
Borelogs: The soil profiles reported in our Borelogs Section represent the soil conditions at our test sites and have been located were we
believe best represents the soils within the proposed building envelope. However soil conditions can change dramatically over short
distances, therefore such point type exploration programs may not locate all variations. If site preparations/excavations reveal soil
conditions that are different from those shown in our Borelogs we must be notified immediately. Changes to the site classification and/or
footing design may be necessary.
Site Information: The site information shown on the attached plans such as surface grades and levels are estimations taken during our
field testing and are provided for a rough guide. They must not be used for any design purposes. Site plan dimensions are as measured
from the noted visible site feature during our field testing.
Previous/Future Excavations: The recommendations contained in this report have not considered the effects of any previous, current or
future excavations, mines or slope instability problems that are not highlighted in the clients supplied information or, that was not clearly
visible during our field testing. If such features exist we must be advised so that our design can be adjusted to accommodate them.
Australian Soil Investigations Appendix Page 2 of 6 Appendices.1
Page 8
7UHHV7UHHVFDQKDYHDFRQVLGHUDEOHLQIOXHQFHRYHUWKHRYHUWKHSHUIRUPDQFHRIDVWUXFWXUHVIRXQGDWLRQLQSDUWLFXODUWKRVHIRXQGHGRQ
UHDFWLYHVRLOV &ODVV60+ ( 7KHWUHHVGHPDQGIRUPRLVWXUHZLOOFKDQJHWKHPRLVWXUHFKDUDFWHULVWLFVRIWKHVXUURXQGLQJVRLOVOHDGLQJ
WRORFDOLVHGVKULQNLQJDQGVZHOOLQJZKLFKFDQH[FHHGWKHH[SHFWHGVRLOPRYHPHQW7KLVFDQLQFOXGHWUHHVWKDWKDYHEHHQUHPRYHGSULRUWR
FRQVWUXFWLRQ 'XULQJ RXU )LHOGWHVWLQJ ZH KDYH FRQVLGHUHG WUHHV WKDW H[LVWHG RQ RU DGMDFHQW WKH VLWH DQG DOORZHG IRU WKHP LQ RXU
UHFRPPHQGDWLRQV :H DUH XQDEOH WR DVVHVV IRU WKH SRWHQWLDO HIIHFWV RI WUHHV SODQWHG DIWHU RXU WHVWLQJ UHIHUHQFH VKRXOG EH PDGH WR
³5HFRPPHQGDWLRQVIRU%XLOGHUV2ZQHUV7UHHV´LQ$SSHQGL['WKDWIROORZV
0RLVWXUH &RQGLWLRQV 7KH PRLVWXUH FRQGLWLRQV QRWHG ZLWKLQ WKLV UHSRUW DUH DV UHFRUGHG DW WKH WLPH RI RXU ILHOG WHVWLQJ DQG KDYH EHHQ
LQFOXGHGLQRXUDVVHVVPHQWRIWKHVLWH&KDQJHVWRVLWHGUDLQDJHWKHSODQWLQJRIWUHHVRUDULVLQJZDWHUWDEOHFDQOHDGWRLQFUHDVHGOHYHOVRI
PRLVWXUH ZLWKLQ WKH VRLOV OHDGLQJ WR HLWKHU DQ LQFUHDVHG FODVVLILFDWLRQ RU GHVLJQ UHTXLUHPHQWV :H PXVW EH QRWLILHG RI DQ\ LQFUHDVH LQ
PRLVWXUHFRQGLWLRQV$OVRUHIHUWR³5HFRPPHQGDWLRQVIRU%XLOGHUV2ZQHUV±6LWH'UDLQDJHLQ$SSHQGL['WKDWIROORZV
$JJUHVVLYH&RQWDPLQDWHG6RLOV7KLVUHSRUWGRHVQRWFRQVLGHUWKHSUHVHQFHRIFRQWDPLQDQWVRUVXOSKDWHVZLWKLQWKHWHVWHGVRLOVDVWKLVLV
EH\RQGWKHVFRSHRIWKLVUHSRUWDQGRXUH[SHUWLVH(QJDJHPHQWRIDVSHFLDOLVWFRQVXOWDQWLVDGYLVHGLIWKLVIRUPRIDVVHVVPHQWLVUHTXLUHG
/DQGVOLS7KLVUHSRUWGRHVQRWDGGUHVVVORSHVWDELOLW\LVVXHV$VSHFLDOLVWUHSRUWPXVWEHREWDLQHGWRDVVHVVVXFKKD]DUGV
6KULQNDJH&UDFNLQJ 6KULQNDJH FUDFNLQJ RI FRQFUHWH RFFXUV DV WKH LQLWLDO PRLVWXUH LQ WKH FRQFUHWH HYDSRUDWHV IURP PL[ FDXVLQJ
VKULQNDJH WR RFFXU 7KH FUDFNLQJ DV D UHVXOW RI WKLV VKULQNDJH LV QRW D VLJQ RI VWUXFWXUDO IDLOXUH DQG LV WR EH H[SHFWHG LQ PRVW FRQFUHWH
HOHPHQWVSRXUHGRQVLWH$6VWDWHV³6KULQNDJHFUDFNLQJFDQEHH[SHFWHGLQFRQFUHWHIORRUV´
( 5(&200(1'$7,216
( 5HFRPPHQGDWLRQVIRU%XLOGHUVDQG)RXQGDWLRQ'HVLJQHUV
&RGHV RI 3UDFWLFH $OO FRQVWUXFWLRQ ZRUN DVVRFLDWHG ZLWK WKLV UHSRUW PXVW EH XQGHUWDNHQ LQ DFFRUGDQFH ZLWK WKH %&$ ³SDUW ± 6LWH
3UHSDUDWLRQ´DQG³SDUW±)RRWLQJV 6ODEV´DQG$6³5HVLGHQWLDO6ODEVDQG)RRWLQJV´
8QGHUJURXQG 6HUYLFHV3OXPELQJ :KHUH VWUXFWXUHV DUH EXLOW RYHU ILOOHG VRIW RU ORRVH VRLOV VHUYLFHV ZLOO QHHG WR EH VXSSRUWHG VR WKDW
SRWHQWLDOPRYHPHQWZLWKLQWKHVRLOVGRHVQRWFDXVHWKHPGDPDJHRUFDXVHLQFRUUHFWDOLJQPHQWZKLFKFRXOGFDXVHOHDNDJH6XFKPHDVXUHV
FDQ LQFOXGH EXW DUH QRW OLPLWHG WR WKH SURYLVLRQ RI H[SDQVLRQMRLQWV VOHHYHG RU IRDPODJJHG SLSH SHQHWUDWLRQV WKURXJKRXW WKH VWUXFWXUH RU
WUHDWPHQWRIWKHVRLOVSULRUWRFRQVWUXFWLRQ7KHDWWDFKHGLOOXVWUDWLRQVGHWDLOPLQLPXPUHTXLUHPHQWV
$UUDQJH SOXPELQJ IL[WXUHV VR WKDW WKH VODE DQG EHDP SHQHWUDWLRQV DUH NHSW WR D PLQLPXP DQG ZKHUH QHFHVVDU\ VOHHYHG WR DOORZ IRU
PRYHPHQW ZLWK PP WKLFN FORVHG FHOO SRO\WKHQH RU VLPLODU PDWHULDO :KHUH WKH SHQHWUDWLRQ LV ZLWKLQ PP RI WKH EDVH RI D EHDP RU
IRRWLQJWKH GHSWK RIWKLVIRRWLQJHOHPHQW VKRXOG EH GHHSHQHG E\DSSUR[LPDWHO\ WZLFHWKH GLDPHWHURI WKH SHQHWUDWLRQ $OO SOXPELQJDQG
GUDLQDJHPXVWFRPSO\ZLWKWKHUHTXLUHPHQWVRIWKH1DWLRQDO3OXPELQJDQG'UDLQDJH&RGH$6
)RU&ODVV+ (VLWHV$6UHTXLUHVWKDWSOXPELQJSLSHVVHUYLFLQJGZHOOLQJVLQFODVV+ (VLWHVEHILWWHGZLWKVOHHYHGH[SDQVLRQ
MRLQWVURWDWLRQDOVZLYHOMRLQWVDQGIRDPODJJHGSHQHWUDWLRQV
5HIHUWRWKHDWWDFKHGGHWDLOVKHHW³3OXPELQJ5HTXLUHPHQWV&ODVV0+DQG(VLWHV
6LWH'UDLQDJH&ODVV$6LWHV7KHJURXQGVXUURXQGLQJWKHGZHOOLQJDQGWKHEXLOGLQJVLWHPXVWEHJUDGHGDQGGUDLQHGVRWKDWVWRUPZDWHU
LV VKHG DZD\ IURP WKH KRXVH DUHD LQ DOO GLUHFWLRQV GXULQJ DQG DIWHU FRQVWUXFWLRQ 3DUWLFXODU DWWHQWLRQ VKRXOG EH JLYHQ WR DOO GUDLQDJH VR
VWRUPZDWHULVQRWLQWURGXFHGWRWKHIRXQGDWLRQVRLOVOHDGLQJWRSRWHQWLDOVFRXU5RRIZDWHUPXVWEHGLYHUWHGDZD\IURPWKHEXLOGLQJSULRUWR
DQGDIWHUWKHURRILVLQVWDOOHG&RUUHFWGUDLQDJHLVDQHVVHQWLDOSDUWRIRXUUHFRPPHQGDWLRQV,IWKHVLWHLVQRWSUHSDUHGFRUUHFWO\H[FHVVLYH
IRXQGDWLRQPRYHPHQWVPD\RFFXUOHDGLQJWRGDPDJHZLWKLQWKHVXSSRUWHGVWUXFWXUH
6LWH'UDLQDJH&ODVV60+ (6LWHV7KHJURXQGVXUURXQGLQJWKHGZHOOLQJDQGWKHEXLOGLQJVLWHPXVWEHJUDGHGDQGGUDLQHGVRWKDW
VWRUPZDWHU LV VKHG DZD\ IURP WKH KRXVH DUHD LQ DOO GLUHFWLRQV GXULQJ DQG DIWHU FRQVWUXFWLRQ $ PLQLPXP JUDGH RI YHUWLFDO
KRUL]RQWDO IRUPPXVWEHSURYLGHG+DUGODQGVFDSLQJVXFKDVWHUUDFHVODEVDGMDFHQWWKHGZHOOLQJFDQDVVLVWLQWKLV5RRIZDWHUPXVWEH
GLYHUWHG DZD\ IURP WKH EXLOGLQJ VLWH SULRU WR DQG DIWHU WKH URRI LV LQVWDOOHG :KHUH EXLOGLQJ GHOD\V RFFXU WHPSRUDU\ GRZQSLSHV PD\ EH
QHFHVVDU\&RQVWDQWPDLQWHQDQFHRIURRIGUDLQDJHLVHVVHQWLDO,IDUDLQZDWHUWDQN RUVLPLODU LVWREHVLWHGZLWKLQPHWHUVRIDVWUXFWXUDO
IRRWLQJ ZH VKRXOG EH FRQVXOWHG IRU IXUWKHU DGYLFH ([WHUQDO ZDWHU WDSV DLU FRQGLWLRQHU RYHUIORZV WDQN DQG KRW ZDWHU F\OLQGHU RYHUIORZV
VKRXOGEHRYHUJUDWHGSLWVFRQQHFWHGWRWKHGUDLQDJHV\VWHP7KHJURXQGVXUURXQGLQJWKHEXLOGLQJPXVWEHJUDGHGDQGGUDLQHGVRZDWHULV
VKHGDZD\IURPWKHKRXVHLQDOOGLUHFWLRQV
3DUWLFXODU FDUH VKRXOG EH WDNHQ ZLWK GUDLQDJH SOXPELQJ DQG HOHFWULFDO WUHQFKHV VR WKDW WKH\ GR QRW LQWURGXFH PRLVWXUH LQWR WKH VRLOV
VXSSRUWLQJWKHIRXQGDWLRQVRUGHVWDELOLVHWKHIRRWLQJVE\XQGHUPLQLQJWKHP7KHEDVHRIDQ\WUHQFKHVXQGHUWKHIORRURUZLWKLQPHWHUVRI
WKHEXLOGLQJVKRXOGEHVORSHGDZD\IURPWKHKRXVHDQGVKRXOGEHEDFNILOOHGZLWKFRPSDFWHGFOD\SOXJ
&RUUHFWGUDLQDJHLVDQHVVHQWLDOSDUWRIRXUUHFRPPHQGDWLRQVDQGLVGRFXPHQWHGLQWKH&6,52KDQGRXW%7)DWWDFKHGWRWKHFOLHQWVFRS\
RIWKLVUHSRUW $GGLWLRQDOFRSLHVDYDLODEOHXSRQUHTXHVW ,IWKHVLWHLVQRWSUHSDUHGFRUUHFWO\H[FHVVLYHVRLOPRLVWXUHPD\RFFXULQVRPH
DUHDVZKLFKFDQOHDGWRH[FHVVLYHIRXQGDWLRQPRYHPHQWVSRVVLEO\GDPDJLQJWKHVXSSRUWHGVWUXFWXUH
,QVSHFWLRQV:HUHTXLUHKRXUVQRWLFHLI\RXUHTXLUHHQJLQHHUVVLWHLQVSHFWLRQV,QVSHFWLRQVFDQEHERRNHGEHWZHHQDPDQGSP
0RQGD\WR)ULGD\E\WHOHSKRQLQJ
6LOW 5HWHQWLRQ 7KH EXLOGHU LV UHVSRQVLEOH IRU HQVXULQJ DSSURSULDWH VLOW UHWHQWLRQ PHDVXUHV DUH LQ SODFHG DQG PDLQWDLQHG WKURXJKRXW
FRQVWUXFWLRQ
6LWH &ODVVLILFDWLRQ 7KH VLWH FODVVLILFDWLRQ LV FDOFXODWHG LQ DFFRUGDQFH ZLWK WKH ³$6 5HVLGHQWLDO 6ODEV DQG )RRWLQJV
&RQVWUXFWLRQ´DQGUHODWHVWRWKHHVWLPDWLRQRI<V³7KHFKDUDFWHULVWLFVXUIDFHPRYHPHQW´ZLWKLQUHDFWLYHVRLOSURILOHV7KHOLPLWVXVHGIRUWKLV
FODVVLILFDWLRQDUHDVIROORZV
3UHGLFWHG6XUIDFH0RYHPHQW &ODVVLILFDWLRQ
<V PP 6 6OLJKW
<V !±PP 0 0RGHUDWH
<V !±PP + +LJK
<V ±PP ++LJK
<V !PP ( ([WUHPH
3UREOHPVLWHV 3 3UREOHP
$XVWUDOLDQ6RLO,QYHVWLJDWLRQV $SSHQGL[3DJHRI $SSHQGLFHV
[OCR of page images]
Trees: Trees can have a considerable influence over the over the performance of a structures foundation, in particular those founded on
reactive soils (Class S, M, H & E). The trees demand for moisture will change the moisture characteristics of the surrounding soils leading
to localised shrinking and swelling which can exceed the expected soil movement. This can include trees that have been removed prior to
construction. During our Field-testing we have considered trees that existed on or adjacent the site and allowed for them in our
recommendations. We are unable to assess for the potential effects of trees planted after our testing, reference should be made to
“Recommendations for Builders/Owners-Trees” in Appendix D that follows.
Moisture Conditions: The moisture conditions noted within this report are as recorded at the time of our field testing and have been
included in our assessment of the site. Changes to site drainage, the planting of trees or a rising water table can lead to increased levels of
moisture within the soils leading to either an increased classification or design requirements. We must be notified of any increase in
moisture conditions. Also refer to “Recommendations for Builders/Owners — Site Drainage in Appendix D that follows.
Aggressive/Contaminated Soils: This report does not consider the presence of contaminants or sulphates within the tested soils as this is
beyond the scope of this report and our expertise. Engagement of a specialist consultant is advised if this form of assessment is required.
Landslip: This report does not address slope stability issues. A specialist report must be obtained to assess such hazards.
Shrinkage Cracking: Shrinkage cracking of concrete occurs as the initial moisture in the concrete evaporates from mix causing
shrinkage to occur. The cracking as a result of this shrinkage is not a sign of structural failure and is to be expected in most concrete
elements poured on-site. AS2870-2011 states “Shrinkage cracking can be expected in concrete floors”.
E RECOMMENDATIONS
E.1. Recommendations for Builders and Foundation Designers
Codes of Practice: All construction work associated with this report must be undertaken in accordance with the BCA “part 3.1 — Site
Preparation” and “part 3.2 — Footings & Slabs” and AS2870-2011 “Residential Slabs and Footings”.
Underground Services/Plumbing: Where structures are built over filled, soft or loose soils, services will need to be supported so that
potential movement within the soils does not cause them damage or cause incorrect alignment which could cause leakage. Such measures
can include but are not limited to the provision of expansion joints, sleeved or foam lagged pipe penetrations throughout the structure or
treatment of the soils prior to construction. The attached illustrations detail minimum requirements.
Arrange plumbing fixtures so that the slab and beam penetrations are kept to a minimum and where necessary sleeved to allow for
movement with 40mm thick closed cell polythene or similar material. Where the penetration is within 150mm of the base of a beam or
footing, the depth of this footing element should be deepened by approximately twice the diameter of the penetration. All plumbing and
drainage must comply with the requirements of the National Plumbing and Drainage Code AS3500.
For Class H & E sites, AS2870 - 2011 requires that plumbing pipes servicing dwellings in class H & E sites be fitted with sleeved expansion
joints, rotational swivel joints and foam lagged penetrations.
Refer to the attached detail sheet “Plumbing Requirements Class M, H and E sites.
Site Drainage - Class A Sites: The ground surrounding the dwelling and the building site must be graded and drained so that stormwater
is shed away from the house area in all directions during and after construction. Particular attention should be given to all drainage so
stormwater is not introduced to the foundation soils leading to potential scour. Roof water must be diverted away from the building prior to
and after the roof is installed. Correct drainage is an essential part of our recommendations. If the site is not prepared correctly, excessive
foundation movements may occur leading to damage within the supported structure.
Site Drainage - Class S, M, H & E Sites: The ground surrounding the dwelling and the building site must be graded and drained so that
stormwater is shed away from the house area in all directions, during and after construction. A minimum grade of 1 : 20 (vertical :
horizontal) for 1.5m must be provided. Hard landscaping such as terrace slabs adjacent the dwelling can assist in this. Roof water must be
diverted away from the building site prior to and after the roof is installed. Where building delays occur, temporary downpipes may be
necessary. Constant maintenance of roof drainage is essential. If a rainwater tank (or similar) is to be sited within 6 meters of a structural
footing, we should be consulted for further advice. External water taps, air conditioner overflows, tank and hot water cylinder overflows
should be over grated pits connected to the drainage system. The ground surrounding the building must be graded and drained so water is
shed away from the house in all directions.
Particular care should be taken with drainage, plumbing and electrical trenches so that they do not introduce moisture into the soils
supporting the foundations or destabilise the footings by undermining them. The base of any trenches under the floor or within 1.5 meters of
the building should be sloped away from the house and should be backfilled with compacted clay plug.
Correct drainage is an essential part of our recommendations and is documented in the CSIRO handout BTF-18 attached to the clients copy
of this report. (Additional copies available upon request.) If the site is not prepared correctly, excessive soil moisture may occur in some
areas, which can lead to excessive foundation movements possibly damaging the supported structure.
Inspections: We require 24 hours notice if you require engineers site inspections. Inspections can be booked between 8.30am and 4.30pm
Monday to Friday by telephoning 07 5455 5604.
Silt Retention: The builder is responsible for ensuring appropriate silt retention measures are in placed and maintained throughout
construction.
Site Classification: The site classification is calculated in accordance with the “AS2870-2011 - Residential Slabs and Footings-
Construction” and relates to the estimation of Ys, “The characteristic surface movement” within reactive soil profiles. The limits used for this
classification are as follows:
Australian Soil Investigations
Predicted Surface Movement Classification
Ys = <=20mm Ss Slight
Ys = >20—40mm M Moderate
Ys = >40 - 60mm H1 High-1
Ys = 60— 75mm H2 High-2
Ys => 75mm E Extreme
Problem sites P Problem
Appendix Page 3 of 6
Appendices.1
Page 9
( 5HFRPPHQGDWLRQVIRU2ZQHUV
)RXQGDWLRQ0DLQWHQDQFHDQG2ZQHUV5HVSRQVLELOLWLHV7KHVRLOVVXUURXQGLQJDQGXQGHUWKHIRXQGDWLRQVPXVWEHSURWHFWHGIURPVFRXU
RUZDVKRXWIURPVWRUPZDWHUE\HQVXULQJDGHTXDWHGUDLQDJHDVQRWHGDERYH
/RFDOLVHG FRQFHQWUDWLRQV RI PRLVWXUH VXFK DV RYHUIORZV IURP KRW ZDWHU F\OLQGHUV RU DLU FRQGLWLRQHUV FDQ OHDG WR H[FHVVLYH ORFDOLVHG
IRXQGDWLRQPRYHPHQWVDQGPXVWDOVREHDGHTXDWHO\GUDLQHGDZD\IURPWKHIRXQGDWLRQVDVQRWHGDERYH
,QDOOW\SHVRIVRLOFRQGLWLRQVLIDQDXWRPDWLFZDWHULQJV\VWHPLUULJDWHVZLWKLQPHWHUVRIDIRXQGDWLRQVLQVWDELOLW\SUREOHPVDQGH[FHVVLYH
IRXQGDWLRQPRYHPHQWVDUHOLNHO\WRRFFXU$OVRVLWHGUDLQDJHDVGLVFXVVHGDERYHPXVWEHPDLQWDLQHG
2QJRLQJ IRXQGDWLRQ PDLQWHQDQFH LV GRFXPHQWHG LQ WKH &6,52 KDQGRXW %7) DWWDFKHG WR WKH FOLHQW¶V FRS\ RI WKLV UHSRUW $GGLWLRQDO
FRSLHVDYDLODEOHXSRQUHTXHVW
5HIHUWRWKHDWWDFKHGGHWDLOVKHHW³*HQHUDO5HTXLUHPHQWVIRU6LWH'UDLQDJH´
$GGLWLRQDO5HTXLUHPHQWV&ODVV$ 66LWHV7UHHVDQGGHQVHVKUXEVPXVWEHNHSWZHOODZD\IURPWKHEXLOGLQJIRXQGDWLRQV5HIHUWR
WKHIROORZLQJVHFWLRQ³5HFRPPHQGDWLRQV±%XLOGHUV2ZQHUV±7UHHV´,QDOOW\SHVRIVRLOFRQGLWLRQVLIDQDXWRPDWLFZDWHULQJV\VWHPLUULJDWHV
ZLWKLQ PHWHUV RI D IRRWLQJ LQVWDELOLW\ SUREOHPV PD\ RFFXU :DWHU VKRXOG QRW EH DOORZHG WR SRQG RQ WKH JURXQG QHDU WKH EXLOGLQJ
)LQLVKHGVXUIDFHJUDGHVDURXQGWKHEXLOGLQJVKRXOGDOVRHQVXUHVFRXURIVRLOVFDQQRWRFFXU$GGLWLRQDOILHOGJXOOLHVDQGGUDLQDJHPLJKWEH
UHTXLUHG,QDOOLQVWDQFHVWKHJURXQGVKRXOGEHVORSHGDZD\IURPWKHIRXQGDWLRQVDWDJUDGHRIQROHVVWKDQLQ YHUWLFDOWRKRUL]RQWDO
IRUDWOHDVWP
$GGLWLRQDO5HTXLUHPHQWV&ODVV0+ (6LWHV7UHHVDQGGHQVHVKUXEVPXVWEHNHSWZHOODZD\IURPWKHEXLOGLQJIRXQGDWLRQV5HIHU
WRWKHIROORZLQJVHFWLRQ³5HFRPPHQGDWLRQV±%XLOGHUV2ZQHUV±7UHHV´
7KH VRLO QHDU WKH EXLOGLQJ VKRXOG EH SURWHFWHG DJDLQVW WKH LQFUHDVHG PRLVWXUH WKDW RFFXUV LQ JDUGHQV RU SHUPHDEOH ODQGVFDSLQJ EXLOW
DGMDFHQW WKH IRXQGDWLRQV $XWRPDWLF LUULJDWLRQ V\VWHPV PXVW QRW EH XVHG DGMDFHQW VWUXFWXUDO IRXQGDWLRQV ,I UHTXLUHG WKHVH IRUPV RI
ODQGVFDSLQJPXVWEHFRQVWUXFWHGRYHULPSHUPHDEOHPHPEUDQHVWKDWGUDLQWKHH[FHVVLYHPRLVWXUHDZD\IURPWKHIRXQGDWLRQVLQWRFRUUHFWO\
LQVWDOOHGILHOGJXOOLHVDQGGUDLQV
:HVWURQJO\UHFRPPHQGWKHFRQVWUXFWLRQRIKDUGODQGVFDSHGSDWKVRUWHUUDFHVODEVDGMDFHQWEXLOGLQJIRXQGDWLRQVIRUDWOHDVWDGLVWDQFHRI
PWRSURWHFWWKHIRXQGDWLRQVIURPH[FHVVLYHPRLVWXUH
( 5HFRPPHQGDWLRQV±%XLOGHUV2ZQHUV7UHHV
7UHHVDQGODQGVFDSHGJDUGHQVFDQKDYHDGUDPDWLFLQIOXHQFHRYHUWKHPRLVWXUHFRQWHQWRIWKHVRLOVWKH\DUHJURZQLQ7KLVFDQOHDGWR
LQFUHDVHGVRLOPRYHPHQWWKURXJKVKULQNLQJDQGVZHOOLQJ:KHUHWKHVHWUHHVRUJDUGHQVDUHZLWKLQFORVHSUR[LPLW\RIVWUXFWXUDOIRXQGDWLRQV
WKHVRLOPRYHPHQWVFDQDIIHFWWKHVWUXFWXUDOLQWHJULW\RIWKHIRXQGDWLRQV
)RU&ODVV0+DQG(VLWHVWKHIROORZLQJUHFRPPHQGDWLRQVIRUWKHPLQLPXPGLVWDQFHEHWZHHQWUHHVDQGIRRWLQJVVKRXOGEHIROORZHG
6LWH&ODVV 2IIVHWWR7UHH
&ODVV0 [K
&ODVV+ [K
&ODVV( [K
:KHUHµK¶LVWKHPDWXUHKHLJKWRIWKHWUHHIXUWKHUUHILQHPHQWRIWKLVUHFRPPHQGDWLRQFDQEHSXUVXHGZKHUHWUHHVSHFLHVFDQEHFRQVLGHUHG
:KHUHDURZRUJURXSRIWUHHVH[LVWVWKHDERYHUHFRPPHQGDWLRQVKRXOGEHGRXEOHG
,QVRPHLQVWDQFHVWKHLQVWDOODWLRQRIURRWEDUULHUVFDQOHVVHQWKHHIIHFWRIWUHHVRQIRXQGDWLRQSHUIRUPDQFH3OHDVHFRQWDFW$XVWUDOLDQ6RLO
,QYHVWLJDWLRQVIRURSWLRQV
7KHIROORZLQJWDEOHSURYLGHVVRPHJXLGDQFHRQPDWXUHWUHHKHLJKWV
$3352;,0$7(75((+(,*+76
WRP+HLJKW±$FDFLDV$VK$WKHO7UHH&DQGOHEDUN0DQQD*XP3HSSHU7UHH:LOORZV<DWH<HOORZ*XP
WRP+HLJKW±%XW%XW&HGDUV(QJOLVK2DN/HPRQ*XP3DOPV3ODQHV6KHRDNV6LON\2DN6SRWWHG*XP&DVXDULQD
WRP+HLJKW±%OXH*XP&\SUHVV(QJOLVK(OP)LJV.DUUL3LQHV5LYHU*XP6XJDU*XP
7KHUHPRYDORIWUHHVIURPWKHSURSRVHGFRQVWUXFWLRQFDQDOVRJUHDWO\DIIHFWWKHPRLVWXUHFRQGLWLRQVRIWKHVRLO:HUHFRPPHQGDOORZLQJWKH
VRLOWLPHWRUHDFKPRLVWXUHHTXLOLEULXPSULRUWRFRQVWUXFWLRQFRPPHQFLQJ3OHDVHFRQWDFWRXURIILFHIRUIXUWKHUJXLGDQFHRQWKLVPDWWHU
) '(7$,/6+((76
) 3OXPELQJ5HTXLUHPHQWV&ODVV0++ (6LWHV
$XVWUDOLDQ6RLO,QYHVWLJDWLRQV $SSHQGL[3DJHRI $SSHQGLFHV
[OCR of page images]
E.2 Recommendations for Owners
Foundation Maintenance and Owners Responsibilities: The soils surrounding and under the foundations must be protected from scour
or washout from stormwater by ensuring adequate drainage as noted above.
Localised concentrations of moisture such as overflows from hot water cylinders or air conditioners can lead to excessive localised
foundation movements and must also be adequately drained away from the foundations as noted above.
In all types of soil conditions, if an automatic watering system irrigates within 2.5 meters of a foundations, instability problems and excessive
foundation movements are likely to occur. Also site drainage as discussed above must be maintained.
Ongoing foundation maintenance is documented in the CSIRO handout BTF-18, attached to the client’s copy of this report. (Additional
copies available upon request.)
Refer to the attached detail sheet “General Requirements for Site Drainage”
Additional Requirements - Class A & S Sites: Trees and dense shrubs must be kept well away from the building foundations. Refer to
the following section “Recommendations — Builders/Owners — Trees”. In all types of soil conditions, if an automatic watering system irrigates
within 2.5 meters of a footing, instability problems may occur. Water should not be allowed to pond on the ground near the building.
Finished surface grades around the building should also ensure scour of soils cannot occur. Additional field gullies and drainage might be
required. In all instances the ground should be sloped away from the foundations at a grade of no less than 1 in 20 (vertical to horizontal)
for at least 1.5m.
Additional Requirements - Class M, H & E Sites: Trees and dense shrubs must be kept well away from the building foundations. Refer
to the following section “Recommendations — Builders/Owners — Trees”.
The soil near the building should be protected against the increased moisture that occurs in gardens or permeable landscaping built
adjacent the foundations. Automatic irrigation systems must not be used adjacent structural foundations. If required, these forms of
landscaping must be constructed over impermeable membranes that drain the excessive moisture away from the foundations into correctly
installed field gullies and drains.
We strongly recommend the construction of hard landscaped paths or terrace slabs adjacent building foundations for at least a distance of
1.5m to protect the foundations from excessive moisture.
E.3. Recommendations — Builders/Owners - Trees
Trees and landscaped gardens can have a dramatic influence over the moisture content of the soils they are grown in. This can lead to
increased soil movement through shrinking and swelling. Where these trees or gardens are within close proximity of structural foundations
the soil movements can affect the structural integrity of the foundations.
For Class M, H and E sites the following recommendations for the minimum distance between trees and footings should be followed:-
Site Class Offset to Tree
Class M : 0.75 xh
Class H : 1.0 xh
Class E : 1.5 xh
Where ‘h’ is the mature height of the tree, further refinement of this recommendation can be pursued where tree species can be considered.
Where a row or group of trees exists the above recommendation should be doubled.
In some instances the installation of root barriers can lessen the effect of trees on foundation performance. Please contact Australian Soil
Investigations for options.
The following table provides some guidance on mature tree heights:-
APPROXIMATE TREE HEIGHTS
10 to 20m Height — Acacias, Ash, Athel Tree, Candlebark, Manna Gum, Pepper Tree, Willows, Yate, Yellow Gum
20 to 30m Height — But-But, Cedars, English Oak, Lemon Gum, Palms, Planes, Sheoaks, Silky Oak, Spotted Gum, Casuarina
30 to 60m Height — Blue Gum, Cypress, English Elm, Figs, Karri, Pines, River Gum, Sugar Gum
The removal of trees from the proposed construction can also greatly affect the moisture conditions of the soil. We recommend allowing the
soil time to reach moisture equilibrium prior to construction commencing. Please contact our office for further guidance on this matter.
F DETAIL SHEETS
F.1 Plumbing Requirements Class M, H1, H2 & E Sites
Australian Soil Investigations Appendix Page 4 of 6 Appendices.1
Page 10
) 6LWH'UDLQDJHUHFRPPHQGDWLRQV
$XVWUDOLDQ6RLO,QYHVWLJDWLRQV $SSHQGL[3DJHRI $SSHQGLFHV
[OCR of page images]
ans,
‘SRORMUATER DOREPE
SEED oft EPA ST
ALON PIPE WORE, TO NONE
TERTCALLY MOEPEMENT
OF BULDMG FOOTHGS
FOOTING 4
SLA SHADED
L/S PENEIRAMOeS J TO SATE
7 TERME PROTECTION REQUEUEATS
FOOTING PEMETHANON It
LEceND.
(EPS) © SELECTED WN-UWe “DR IMOA” WONT STALLED TO
AUNUFACTIRES <PEEACABONS. STORMPUSTES OA
3] (eruys To ured arc EQUALLY APPRHED
SOMECNOSH FY ASS H&E (Sti) SELECIED BH-LME SAVE. JOT WASTED 10
sts WHLEACIURERS SPECFICATONS. STORUPLASTICS OR
r EQUALLY APRON
(CTP) commecren exay puma Tove PLUG 1 STOP
MOSTURE Ono UNDE a HOU SLA
(SL) Sue Wan unt
10. WNSPECROM CPBSNG 10 SURFACE
LAGGHG — MPOMLINL LAGKING THICKNESS, ‘vie FOR OLAGS W
‘TES Av] elem FOR CLASS H de E SITES
Guidelines for Drainage Installations
Notes: The following nates and details provided are a guide only for articulation for sanitary
pluming, drainage and should be read in conjunction uath AS/N23500, ASP87O and any
other relevant standard and other requirements of che 8.0.4.
1. all drains installed in ground that is filled, unstable, expansiua @.g. M.H, E and P it
‘water charged and where soil movement may affect the performance of any drain, ace
plan and specification should be provided by an apprtaprlately qualified person. ‘hen a
compliance permil and assesetnent is required by the local authority, a soil report and all
calculations showing proposed method to protect the drainage fram potential ground
movements may be required,
2. all sewer and stormwater te be constructed in accordance with AS/NZ 3500 and the
Taquirements of ASZ870 clauses: 5.2, 5.6 & 6.6: Articulation and expansion joints are to be
provided to accommodate movernen In all pipe work within | metre af the dwelling and
comply AST 260.
3. Plumbing and drainage under the slab should be avoided where practical (refer
AG/NZ53500 clause 4.10).
4, Grades In pipe work on M, Hand & sites should have a minimum gtade of 1:50 within 1.5
metres of the building and |:60 elsewhere. Grades in flexible fittings to be set at the
tainimum grade,
5. All expansion and articulation joints to be installed in accordance svith manulacturer's
racommendalions, aAlljeints to be set mid paint $0 as to allow for maximum in either
direction
6, Stonmplasties Ab Pry Lte ‘swuvel Joints" should not be used asa bend to achieve correct,
falls, The joints should be sét in a straight line of the drain to alle maximum (+) or ()
Trovament. A minimum 15° bend co be installed before swivel joints to achieve minimum
grades fram the face of the footings.
7. Detail and support of traps at the O.R,G to be considered on site to allow for patential
Movements including isolation and articulation associated with paths and pavertienits. The
ORG should be cast in concrete manolithically with che footing system on class H and E
sites.
a, The use of corrugated flexible PwC pipe products is not peamitted
14. Termite protection is to be in accordance AS3660 and is nat showm on these drawings as
there are varinus options refer t che Building Designer *archicect.
4, All derails are Indicative only,
10. Provisions should be made fer ihe connection of overflow or water discharge from
fistures such as HLS and A.C. to approved drains as required by the relevant local
authoricy.
) or
ied!
PLUMBING REQUIREMENTS — CLASS M_H1 H2 & E SITES
F.2
Australian Soil Investigations
Site Drainage recommendations
Appendix Page 5 of 6
Appendices.1
Page 11
$XVWUDOLDQ6RLO,QYHVWLJDWLRQV $SSHQGL[3DJHRI $SSHQGLFHV
[OCR of page images]
RECTION OF
ROUND FALL [7
|
Y
CUT-OFF DRAM AT HIGH
‘SOE OF EMBANKMENT CUT
Guidelines for Site Drainage
1, The site must be prepared prior to construction works that enables the site to drain
throughout construction and nol allow’ flooding of Foundation works, temporary pumping,
systems could be required existing drainage paths are trapped, Temporary down pipes must
e installed following roof construction and drained away from the construction area.
Dramage trenches should be clay capped to stop mxsture entering feundations,
2. Upon completion the ground! surrounding the chvelling should be graded away from the.
duvalling as Indleated. Paving and terrace stabs adjacent the dwelling Improve thls deairiage,
Perimeter drainage should be provided around the dwelling as mdcaced and must be
dramed 10 approved drainage faclihes dovmsloge fiom the dwelling.
3. Rear of wrll drainage beyond constructed retaining walls must be drained to approved
drainage facilities downslope from the dwelling, These drains should be provided with flush
‘out facilities at the upstream end of the drainage line and regularly maintained
SITE DRAINAGE RECOMENDATIONS
CUT-OFF ORAM ALONG
HCH SIE OF RETAINING
RETNWNG WALL WL
%
‘\
GROUND SUAFACE FALL =
1:20 MA FOR Saw NI
of
——s NS
eS
pe REAR OF MALL DRAMAGE,
OF RETANNG WALL
DRECTED AROUND IE
Dre MOND ie PERMETER OF THE
BRMETER DELS
DHELLHG
ALL SITES
Australian Soil Investigations Appendix Page 6 of 6
Appendices.1
Page 12
Foundation Maintenance and Footing Performance: *,.; A Homeowner's Guide were Buildings can and often do move. This movement can be up, down, lateral or rotational. The fundamental cause of movement in buildings can usually be related to one or more problems in the foundation soil. It is important for the homeowner to identify the soil type in order to ascertain the measures that should be put in place in order to ensure that problems in the foundation soil can be prevented, thus protecting against building movement. This Building Technology File is designed to identify causes of soil-related building movement, and to suggest methods of prevention of resultant cracking in buildings. i The types of soils usually present under the topsoil in land zoned for residential buildings can be split into two approximate groups ~ granular and clay. Quite often, foundation soil is a mixture of both types. The general problems associated with soils having granular content are usually caused by erosion. Clay soils are subject to saturation and swell/shrink problems. Classifications for a given area can generally be obtained by application to the local authority, but these are sometimes unreliable and if there is doubt, a geotechnical report should be commissioned. As most buildings suffering movement problems are founded on clay soils, there is an emphasis on classification of soils according to the amount of swell and shrinkage they experience with variations of water content. The table below is Table 2.1 from AS 2870, the Residential Slab and Footing Code. Settlement due to construction There are two types of settlement that occur as a result of construction: * Immediate settlement occurs when a building is first placed on its foundation soil, as a result of compaction of the soil under the weight of the structure. The cohesive quality of clay soil mitigates against this, but granular (particularly sandy) soil is susceptible. Consolidation settlement is a feature of clay soil and may take place because of the expulsion of moisture from the soil or because of the soil’s lack of resistance to local compressive or shear stresses. This will usually take place during the first few months after construction, but has been known to take many years in exceptional cases. These problems are the province of the builder and should be taken into consideration as part of the preparation of the site for construc- tion. Building Technology File 19 (BTF 19) deals with these problems. Erosion All soils are prone to erosion, but sandy soil is particularly susceptible to being washed away. Even clay with a sand component of say 10% or more can suffer from erosion. Saturation This is particularly a problem in clay soils. Saturation creates a bog- like suspension of the soil that causes it to lose virtually all of its bearing capacity. To a lesser degree, sand is affected by saturation because saturated sand may undergo a reduction in volume — particularly imported sand fill for bedding and blinding layers. However, this usually occurs as immediate settlement and should normally be the province of the builder. Seasonal swelling and shrinkage of soil All clays react to the presence of water by slowly absorbing it, making the soil increase in volume (see table below). The degree of increase varies considerably between different clays, as does the degree of decrease during the subsequent drying out caused by fair weather periods. Because of the low absorption and expulsion rate, this phenomenon will not usually be noticeable unless there are prolonged rainy or dry periods, usually of weeks or months, depending on the land and soil characteristics. The swelling of soil creates an upward force on the footings of the building, and shrinkage creates subsidence that takes away the support needed by the footing to retain equilibrium, Shear failure This phenomenon occurs when the foundation soil does not have sufficient strength to support the weight of the footing. There are two major post-construction causes: * Significant load increase. * Reduction of lateral support of the soil under the footing due to erosion or excavation. * In clay soil, shear failure can be caused by saturation of the soil adjacent to or under the footing. GENERAL DEFINITIONS OF SITE CLASSES Clas Foundation °° A Most sand and rock sites with little or no ground movement from moisture changes Ss Slightly. reactive clay sites with only slight ground movement from moisture changes M ‘Moderately reactive ‘clay or silt sites, which can experience moderate ground movement from ‘moisture changes H Highly reactive clay sites, which can experiénce high ground movement from moisture changes By Extremely reactive sites, which can experience extreme ground movement from moisture changes AtoP Filled sites 4 ie Sites which include soft soils, such as soft clay or silt or loose sands; landslip; mine subsidence; collapsing soils; soils subject to erosion: reactive sites subject to abnormal moisture conditions or sites which cannot be classified otherwise
Page 13
Tree root growth
Trees and shrubs that are allowed to grow in the vicinity of footings
can cause foundation soil movement in two ways:
* Roots that grow under footings may increase in cross-sectional
size, exerting upward pressure on footings.
* Roots in the vicinity of footings will absorb much of the moisture
in the foundation soil, causing shrinkage or subsidence.
The types of ground movement described above usually occur
unevenly throughout the building's foundation soil. Settlement due
to construction tends to be uneven because of:
¢ Differing compaction of foundation soil prior to construction.
+ Differing moisture content of foundation soil prior to construction.
Movement due to non-construction causes is usually more uneven
still, Erosion can undermine a footing that traverses the flow or can
create the conditions for shear failure by eroding soil adjacent to a
footing that runs in the same direction as the flow.
Saturation of clay foundation soil may occur where subfloor walls
create a dam that makes water pond. It can also occur wherever there
is a source of water near footings in clay soil. This leads to a severe
reduction in the strength of the soil which may create local shear
failure.
Seasonal swelling and shrinkage of clay soil affects the perimeter of
the building first, then gradually spreads to the interior. The swelling
process will usually begin at the uphill extreme of the building, or on
the weather side where the land is flat, Swelling gradually reaches the
interior soil as absorption continues. Shrinkage usually begins where
the sun's heat is greatest.
‘Effects of Uneven Soil Movement on Structures
Erosion and saturation
Erosion removes the support from under footings, tending to create
subsidence of the part of the structure under which it occurs.
Brickwork walls will resist the stress created by this removal of
support by bridging the gap or cantilevering until the bricks or the
mortar bedding fail. Older masonry has little resistance. Evidence of
failure varies according to circumstances and symptoms may include:
* Step cracking in the mortar beds in the body of the wall or
above/below openings such as doors or windows,
* Vertical cracking in the bricks (usually but not necessarily in line
with the vertical beds or perpends).
Isolated piers affected by erosion or saturation of foundations will
eventually lose contact with the bearers they support and may tilt or
fall over. The floors that have lost this support will become bouncy,
sometimes rattling ornaments etc.
Seasonal swelling/shrinkage in clay
Swelling foundation soil due to rainy periods first lifts the most
exposed extremities of the footing system, then the remainder of the
perimeter footings while gradually permeating inside the building
footprint to lift internal footings. This swelling first tends to create a
dish effect, because the external footings are pushed higher than the
internal ones.
The first noticeable symptom may be that the floor appears slightly
dished. This is often accompanied by some doors binding on the
floor or the door head, together with some cracking of cornice
mitres. In buildings with timber flooring supported by bearers and
joists, the floor can be bouncy. Externally there may be visible
dishing of the hip or ridge lines.
As the moisture absorption process completes its journey to the
innermost areas of the building, the internal footings will rise. Tf the
spread of moisture is roughly even, it may be that the symptoms will
temporarily disappear, but it is more likely that swelling will be
uneven, creating a difference rather than a disappearance in
symptoms. In buildings with timber flooring supported by bearers
and joists, the isolated piers will rise more easily than the strip
footings or piers under walls, creating noticeable doming of flooring.
eee ee ei
j
(Wail cracxing
hdue to uneven
jlocung setiement
As the weather pattern changes and the soil begins to dry out, the
external footings will be first affected, beginning with the locations
where the sun's effect is strongest. This has the effect of lowering the
external footings. The doming is accentuated and cracking reduces
or disappears where it occurred because of dishing, but other cracks
open up. The roof lines may become convex.
Doming and dishing are also affected by weather in other ways. In
areas where warm, wet summers and cooler dry winters prevail,
water migration tends to be toward the interior and doming will be
accentuated, whereas where summers are dry and winters are cold
and wet, migration tends to be toward the exterior and the
underlying propensity is toward dishing.
Movement caused by tree roots
In general, growing roots will exert an upward pressure on footings,
whereas soil subject to drying because of tree or shrub roots will tend
to remove support from under footings by inducing shrinkage.
Complications caused by the structure itself
Most forces that the soil causes to be exerted on structures are
vertical ~ i.e, either up or down. However, because these forces are
seldom spread evenly around the footings, and because the building
resists uneven movement because of its rigidity, forces are exerted
from one part of the building to another. The net result of all these
forces is usually rotational. This resultant force often complicates the
diagnosis because the visible symptoms do not simply reflect the
original cause. A common symptom is binding of doors on the
vertical member of the frame.
Effects on full masonry structures
Brickwork will resist cracking where it can. It will attempt to span
areas that lose support because of subsided foundations or raised
points. It is therefore usual to see cracking at weak points, such as
openings for windows or doors.
In the event of construction settlement, cracking will usually remain
unchanged after the process of settlement has ceased.
With local shear or erosion, cracking will usually continue to develop
until the original cause has been remedied, or until the subsidence
has completely neutralised the affected portion of footing and the
structure has stabilised on other footings that remain effective.
Tn the case of swell/shrink effects, the brickwork will in some cases
return to its original position after completion of a cycle, however it
is more likely that the rotational effect will not be exactly reversed,
and it is also usual that brickwork will settle in its new position and
will resist the forces trying to return it to its original position. This
means that in a case where swelling takes place after construction
and cracking occurs, the cracking is likely to at least partly remain
after the shrink segment of the cycle is complete. Thus, each time
the cycle is repeated, the likelihood is that the cracking will become
wider until the sections of brickwork become virtually independent.
With repeated cycles, once the cracking is established, if there is no
other complication, it is normal for the incidence of cracking to
stabilise, as the building has the articulation it needs to cope with
the problem. This is by no means always the case, however, and
monitoring of cracks in walls and floors should always be treated
seriously.
Upheaval caused by growth of tree roots under footings is not a
simple vertical shear stress. There is a tendency for the root to also
exert lateral forces that attempt to separate sections of brickwork
after initial cracking has occurred.
Page 14
The normal structural arrangement is that the inner leaf of brick-
work in the external walls and at least some of the internal walls
(depending on the roof type) comprise the load-bearing structure on
which any upper floors, ceilings and the roof ate supported. Tn these
cases, it is internally visible cracking that should be the main focus
of attention, however there are a few examples of dwellings whose
external leaf of masonry plays some supporting role, so this should
be checked if there is any doubt. In any case, externally visible
cracking is important as a guide to stresses on the structure generally,
and it should also be remembered that the external walls must be
capable of supporting themselves.
Effects on framed structures
‘Timber or steel framed buildings are less likely to exhibit cracking
due to swell/shrink than masonry buildings because of their
flexibility. Also, the doming/dishing effects tend to be lower because
of the lighter weight of walls, The main risks to framed buildings are
encountered because of the isolated pier footings used under walls.
Where erosion or saturation cause a footing to fall away, this can
double the span which a wall must bridge. This additional stress can
create cracking in wall linings, particularly where there {s a weak
point in the structure caused by a door or window opening. leis,
however, unlikely that framed structures will be so stressed as to suffer
serious damage without first exhibiting some or all of the above
symptoms for a considerable period. The same warning period should
apply in the case of upheaval..It should be noted, however, that where
framed buildings are supported by strip footings there is only one leaf
of brickwork and therefore the externally visible walls are the
supporting structure for the building. In this case, the subfloor
masonry walls can be expected to behave as full brickwork walls.
Effects on brick veneer structures S
Because the load-bearing structure of a brick veneer building is the
frame that makes up the interior leaf of the external walls plus
perhaps the internal walls, depending on the type of roof, the
building can be expected to behave as a framed structure, except that
the external masonry will behave in a similar way to the external leaf
of a full masonry structure.
Water Service and
Where a water service pipe, a sewer or stormwater drainage pipe is in
the vicinity of a building, a water leak can cause erosion, swelling or
saturation of susceptible soil. Even a minuscule leak can be enough
to saturate a clay foundation. A leaking tap near a building can have
the same effect. In addition, trenches containing pipes can become
watercourses even though backfilled, particularly where broken
rubble Is used as fill. Water that runs along these trenches can be
responsible for serious erosion, interstrata seepage into subfloor areas
and saturation.
Pipe leakage and trench water flows also encourage tree and shrub
roots to the source of water, complicating and exacerbating the
problem.
Poor roof plumbing can result In large volumes of rainwater being
concentrated in a small area of soil:
* Incorrect falls in roof guttering may result in overflows, as may
gutters blocked with leaves etc,
* Corroded guttering or downpipes can spill water to ground.
* Downpipes not positively connected to a proper stormwater
collection system will direct a concentration of water to soil that is
directly adjacent to footings, sometimes causing large-scale
problems such as erosion, saturation and migration of water under
the building.
of Cracking
In general, most cracking found in masonry walls is a cosmetic
nuisance only and can be kept in repair or even ignored, The table
below is a reproduction of Table C1 of AS 2870.
AS 2870 also publishes figures relating to cracking In concrete floors,
however because wall cracking will usually reach the critical point
significantly earlier than cracking in slabs, this table is not
reproduced here.
Plumbing
Where building movement is caused by water service, roof plumbing,
sewer or stormwater failure, the remedy Is to repair the problem.
It Js prudent, however, to consider also rerouting pipes away from
the building where possible, and relocating taps to positions where
any leakage will not direct water to the building vicinity. Even where
gully traps are present, there is sometimes sufficient spill to create
erosion or saturation, particularly in modern Installations using
" sthaller diameter PVC fixtures. Indeed, some gully traps are not
situated directly under the taps that are Installed to charge them,
with the result that water from the tap may enter the backfilled
trench that houses the sewer piping. If the trench has been poorly
backfilled, the water will either pond or flow along the bottom of
the trench. As these trenches usually run alongside the footings and
can be at a similar depth, it is not hard to see how any water that is
thus directed into a trench can easily affect the foundation's ability to
support footings or even gain entry to the subfloor area,
Ground drainage
In all soils there Js the capacity for water to travel on the surface and
below it. Surface water flows can be established by inspection during
and after heavy or prolonged rain. If necessary, a grated drain system
connected to the stormwater collection system {s usually an easy
solution.
Tt 4s, however, sometimes necessary when attempting to prevent
water migration that testing be carried out to establish watertable
height and subsoil water flows. This subject is referred to in BF 19
and may properly be regarded as an area for an expert consultant.
Protection of the building perimeter ‘
It is essential to remember that the soil that affects footings extends
well beyond the actual building line. Watering of garden plants,
shrubs and trees causes some of the most serious water problerns.
For this reason, particularly where problems exist or are likely to
occur, it Is recommended that an apron of paving be installed
around as much of the building perimeter as necessary. This paving
Page 15
height selected
for distance
<4. Orained
Carport pathway
Path——£
shee ya Garden bed
Driveway ie) 2 bp 5 1 covered wilh
Aye Ghent van
mulch
should extend outwards a minimum of 900 mm (more in highly
reactive soil) and should have a minimum fall away from the
building of 1:60. The finished paving should be no less than 100
mm below brick vent bases.
It is prudent to relocate drainage pipes away from this paving, if
possible, to avoid complications from future leakage. Tf this is not
practical, earthenware pipes should be replaced by PVC and
backfilling should be of the same soil type as the surrounding soil
and compacted to the same density.
Except in areas where freezing of water is an issue, it is wise to
remove taps in the building area and relocate them well away from
the building — preferably not uphill from it (see BTF 19).
Tt may be desirable to install a grated drain at the outside edge of the
paving on the uphill side of the building. If subsoil drainage is
needed this can be installed under the surface drain.
Condensation
Tn buildings with a subfloor void such as where bearers and joists
support flooring, insufficient ventilation creates ideal conditions for
condensation, particularly where there is little clearance between the
floor and the ground. Condensation adds to the moisture already
present in the subfloor and significantly slows the process of drying
out. Installation of an adequate subfloor ventilation system, either
natural or mechanical, is desirable.
Warning: Although this Building Technology File deals with
cracking in buildings, it should be said that subfloor moisture can
result in the development of other problems, notably:
+ Water that is transmitted into masonry, metal or timber building
elements causes damage and/or decay to those elements.
High subfloor humidity and moisture content create an ideal
environment for various pests, including termites and spiders.
* Where high moisture levels are transmitted to the flooring and
walls, an increase in the dust mite count can ensue within the
living areas. Dust mites, as well as dampness in general, can be a
health hazard to inhabitants, particularly those who are
abnormally susceptible to respiratory ailments.
The garden
The ideal vegetation layout is to have lawn or plants that require
only light watering immediately adjacent to the drainage or paving
edge, then more demanding plants, shrubs and trees spread out in
that order.
Overwatering due to misuse of automatic watering systems is a
common cause of saturation and water migration under footings. If
it is necessary to use these systems, it is important to rernove garden
beds to a completely safe distance from buildings.
Existing trees
Where a tree is causing a problem of soil drying or there is the
existence or threat of upheaval of footings, if the offending roots are
subsidiary and their removal will not significantly darnage the tree,
they should be severed and a concrete or metal barrier placed
vertically in the soil to prevent future root growth in the direction of
the building. If it is not possible to remove the relevant roots
without damage to the tree, an application to remove the tree should
be made to the local authority. A prudent plan is to transplant likely
offenders before they become a problem.
Information on trees, plants and shrubs
State departments overseeing agriculture can give information
regarding root patterns, volume of water needed and safe distance
from buildings of most species. Botanic gardens are also sources of
information. For information on plant roots and drains, see Building
Technology File 17.
Excavation
Excavation around footings must be properly engineered. Soil
supporting footings can only be safely excavated at an angle that
allows the soil under the footing to remain stable. This angle is
called the angle of repose (or friction) and varies significantly
between soil types and conditions. Removal of soil within the angle
of repose will cause subsidence.
Remediation
Where erosion has occurred that has washed away soil adjacent to
footings, soil of the same classification should be introduced and
compacted to the same density. Where footings have been
undermined, augmentation or other specialist work may be required.
Remediation of footings and foundations is generally the realm of a
specialist consultant.
Where isolated footings rise and fall because of swell/shrink effect,
the homeowner may be tempted to alleviate floor bounce by filling
the gap that has appeared between the bearer and the pier with
blocking. The danger here is that when the next swell segment of the
cycle occurs, the extra blocking will push the floor up into an
accentuated dome and may also cause local shear failure in the soil.
If it is necessary to use blocking, it should be by a pair of fine
wedges and monitoring should be carried out fortnightly.
This BTF was prepared by John Lewer FAIB, MIAMIA, Partner,
Construction Diagnosis.
‘The information in this and other issues in the series was derived from various sources and was believed to be correct when pul hed.
The information is advisory. It is provided in good faith and not claimed to be an exhaustive treatment of the relevant subject.
Further professional advice needs to be obtained before taking
any action based on the information provided.
Distributed by
CSIRO PUBLISHING PO Box 1139, Collingwood 3066, Australia
Freecall 1800 645 051
Tel (03) 9662 7666
Fax (03) 9662 7555 www.publish.csiro.au
Email; [email protected]
© CSIRO 2003. Unauthorised copying of this Building Technology file is prohibited