Original source · versioned page text
Appendix D - Soil Test and Site Classification Report
$XVWUDOLDQ6RLO,QYHVWLJDWLRQV $SSHQGL[3DJHRI $SSHQGLFHV
[OCR of page images]
RECTION OF
ROUND FALL [7
|
Y
CUT-OFF DRAM AT HIGH
‘SOE OF EMBANKMENT CUT
Guidelines for Site Drainage
1, The site must be prepared prior to construction works that enables the site to drain
throughout construction and nol allow’ flooding of Foundation works, temporary pumping,
systems could be required existing drainage paths are trapped, Temporary down pipes must
e installed following roof construction and drained away from the construction area.
Dramage trenches should be clay capped to stop mxsture entering feundations,
2. Upon completion the ground! surrounding the chvelling should be graded away from the.
duvalling as Indleated. Paving and terrace stabs adjacent the dwelling Improve thls deairiage,
Perimeter drainage should be provided around the dwelling as mdcaced and must be
dramed 10 approved drainage faclihes dovmsloge fiom the dwelling.
3. Rear of wrll drainage beyond constructed retaining walls must be drained to approved
drainage facilities downslope from the dwelling, These drains should be provided with flush
‘out facilities at the upstream end of the drainage line and regularly maintained
SITE DRAINAGE RECOMENDATIONS
CUT-OFF ORAM ALONG
HCH SIE OF RETAINING
RETNWNG WALL WL
%
‘\
GROUND SUAFACE FALL =
1:20 MA FOR Saw NI
of
——s NS
eS
pe REAR OF MALL DRAMAGE,
OF RETANNG WALL
DRECTED AROUND IE
Dre MOND ie PERMETER OF THE
BRMETER DELS
DHELLHG
ALL SITES
Australian Soil Investigations Appendix Page 6 of 6
Appendices.1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original