172102 L500 Managment Plan Issue A

of 1

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 

 

 

 

       
 

     

&
4 a
ay A
&
UG
_ A OPERTY souNoge
5 i x %
< B
° 2 %
° \ % .
= s\ .
_ 10m wide firebreak along edge of development
PRECING T 5 PRECINCT to adjacent Residential properties
8 7
3
j PRECINCOT 8
a 5 5 -
rg +
a 2 “ tae
g 4 eS
)
BEES 4 j Se .
PRECINCT
4

PRECINCT
1

  

PRECINCT
2

 

rawing title

Consulting Civil &
Landscape Management

 

SCALE 1:1000 (A1)

LANDSCAPE MANAGEMENT PLAN
SITE MANAGEMENT STRATEGIES TO CURRENT SITE CONDITIONS
ON-GOING MANAGEMENT OF REVEGETATION WITHIN THE WOOROI CREEK BUFFER ZONE

1 Area of revegetation planting - approx. 1.500m?
~ requires bi-monthly spraying/weed removal

2 Area of rehabilitation works - approx. 3950m?
= requires bi-monthly spraying/weed removal

3 Area to remain unmanaged - approx. 5,400m?
= to be monitored only during above maintenance visits

(inform if weed management is required)

ON-GOING MANAGEMENT OF CENTRAL DRAINAGE CORRIDOR

Area of weed control within Open Space Area - approx. 19,665m?
= requires slashing twice yearly and/or monthly spraying/weed removal

5 Area of weed control within Drainage Corridor - approx. 7,725m?
= requires monthly spraying/weed removal

ON-GOING MANAGEMENT OF EDGE OF DEVELOPMENT
Area of weed control within existing vegetation - Nom.Sm wide/approx. 2,950?

wie Wann = requires monthly spraying/weed removal

Area of weed management to development frontage - Nom.10m wide/approx. 2,620m?

7
= requires monthly spraying/stashing

10m WIDE FIREBREAK
Area of managed firebreak ~ Nom.10m wide/approx. 1,150?
- requires half-yearly monitoring/vegetation removal

Weed Management Overview
In general for the purpose of the Rehabilitation and Edge of Development Weed Control areas, weeds are plants

which are not endemic to the Sunshine Coast region and recognised as an invasive species in scientific literature
Noted weed species within the proposed area of works include (but not limited to) dense infestations of Singapore
Daisy (Sphagneticola frilobata), Mile-a-Minute (Ipomoea cairical, Pepper Tree (Schinus terebinthifolius), Cocos Palm
(Syragrus romanzoffiana) and Umbrella Tree (Schefflera actinophylla). All identified weed species are to be

controlled using appropriate control methods
The designated areas are to be managed to control all weeds species listed in the following standards and

legislation
(a) Management of weeds in accordance with the provisions of the Biosecurity Act 2014
(b) Control of weeds as listed within the Sunshine Coast Local Government Area Pest Management Plan

2012-2016
Herbicide application is to be undertaken in accordance with the South East Queensland Restoration Framework
(Chenoweth EPLA and Bushland Restoration Services, 2012). Treatment is to target introduced species only and be
carried out in a manner that minimises disturbance to native plants. When undertaking herbicide application for
weed control, particular care will be taken to ensure that no off-target damage occurs to native vegetation. To
prevent any unnecessary and excessive use of herbicides during weed control activities, a vegetable based dye will
be mixed with all herbicides to be used for spray application. Avoid weed control along drainage corridors during
amphibian breeding season (typically late spring to early autumn). Avoid using surfactants, as many of these are

more toxic to wetland fauna than actual herbicide,
Note: Where Glyphosate is indicated for use in chemical treatments, Glyphosate Biactive or an equivalent ‘Frog

Friendly’ herbicide must be used.

PROPOSED REVEGETATION/REHABILITATION WORKS

Area of proposed vegetation management - approx. 6,000m?

~ requires initial weed removal followed by monthly spraying/weed removal program

= requires tubestock in-fill planting consistent with the revegetation species
implemented in previous works under OPW 19/0138

The proposed landscape works are to be generally consistent with the Landscape Concept Plan LA03

 

prepared by Covey Associates Jan 2013

4 commencement

treck all dimensions bet
Check Site boundary dimension
F Builling Sourdary clearances by
the information supplied or

 

ESPONSISILITY OF THE CONTRACTO
ONTACT THE 2ELEVANT AUTHORITIES TO
THE LOCATION OF ALL EXISTING SE
TO THE © ENCEMENT OF EXCAVATIC

stant
rion, depth and extert
9 he contirried and protect

& web tcroun

  

inmencerient

 

prior

roect 172102

 

 

te Tite lar
out.
this dhavin

 

tk

1

thea

 

 

“ - SUNDALE TEWANTIN

 

 

 

MCKINNON DRIVE
TEWANTIN

opyticht and shall 1
approval, ror shall i b

 

 

for the Development and th

 

ters — SUNDALE

 

 

 

rN Structural Engineers

Strategies - Whole of Site

 

 

 

 

 

COVEY Project Management c

 

 

 

 

 

 

 

x [PoE FOR ORAL ASSOCIATES PTY LTD g pignning
Issue Date Description By : “

 

 

 

 

 

 

 

 

 

 
Log in to download the original file

172102 L500 Managment Plan Issue A.pdf · 1.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.