Original source · versioned page text
2020-08-31 SM - Item 2 - Attachment 2 - Infrastructure Agreement
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
c. provision of a minimum of one ex-ground or advanced street tree within the
road reserve for every 8 metres of new road between proposed lot 3 and 7
within garden beds.
i. the garden beds must be a minimum of 6m2 and contain a mix of shrubs
and grasses.
d. Provision of sufficient volumes of structured soil media suitable for advance
root growth for street trees, in accordance with the written recommendations of
an industry accredited horticulturist or arborist.
e. 100mm deep mulching and landscaping to any batter within road reserves that
exceed 1 in 4 slope (25%)
f. planting works to the median strip and/or roundabout that do not interfere with
driver sight lines at any time.
g. Achieve the park-like settings as set out in the Shire Business Centre Zone
(Division 9) of the Noosaville Locality Plan in the Noosa Plan by ensuring
i. Retention of suitable vegetation within the road reserve through project
design and services location
ii. Limiting the disturbance to the root zones of retained vegetation
(*Refer Advisory Notes)
54. All landscape works must be established and maintained in accordance with horticultural
best practice with construction techniques that allow for healthy, sustained and vigorous
plant growth. All plant material must be allowed to grow to full form.
55. All entry statements, fences, batters, retaining walls and buffer/screen plantings must
be located entirely within private land and not within the public road reserve.
56. All third-party service provider infrastructure must be clearly shown on submitted
landscape plans and have landscaping provided to screen the bulk of the infrastructure.
57. All landscape works must be maintained generally in accordance with the approved
design for the life of the development.
Lot 24
58. The Applicant must, at no cost to the Council:
(i) Dedicate to Council proposed Lot 24 for public transport infrastructure as shown
on the subdivision plan; but
(ii) Notwithstanding condition 1, only after amendment to Council’s planning scheme
has taken effect which shows the provision for transit designated only in the
location consistent with Lot 24 on the subdivision plan.
Future Environmental Offset
59. For the purposes of calculating any environmental offset that might be required for the
ultimate development of Lot 3 on SP246584 for the Shire Business Centre, the plan
described as 10651 Rev C prepared by Norris Clark & O’Brien Pty Ltd and dated 24
August 2020 shows the maximum extent of clearing (i.e. 12.4943ha). For the avoidance
of doubt, while the plan shows the maximum extent of clearing for offset purposes, the
clearing ultimately undertaken will not necessarily be the maximum extent (noting that
the Shire Business Centre is to occur in a park like setting).
Infrastructure Agreement
60. The Applicant/Owner shall comply with the terms of any Infrastructure Agreement
applying to the land.
Page 106
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.