Council archive · source document
07/2174 - Response to Information Request [As Published] · 132007.2174
Councifs Reference: Our Reference: martoo 22™ January 2008 consultinga pty Itd Chief Executive O Noosa Shire Coun Po Box 141 TEWANTIN Q 4565 ATTENTION: PLANNING AND DEVELOPMENT DEPARTMENT - DANIEL SMITH Dear Sir RE: APPLICATION FOR DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE OF PREMISES FOR MULTIPLE HOUSING —- TYPE 2 CONVENTIONAL (5 UNITS) AT 43 TO 45 ELANDA STREET, SUNSHINE BEACH DESCRIBED AS LOTS 399 AND 400 ON RP48112 | refer to the above application and in particular to the request for additional information issued by your Council and dated 5" December 2007. This request listed three (3) items that your Council considers is necessary in order to complete its assessment of the above application. The applicants have decided to respond to these items as below: item 1: Revised plans that indicate compliance with gross floor area. Applicant’s Response to Item 1: The applicants building designer has prepared amended plans that indicate the proposals compliance with gross floor area provisions. In this regard the plans have been amended with external building dimensions reduced across the entire building and entry doors further recessed into the building. Item 2: Submission of a preliminary design showing the profile of the proposed access driveway giving consideration to the drainage collection of the stormwater at the rear of the property. Applicant’s Response to Item 2: The applicants engaged Contour Consulting Engineers to prepare a response to the information request. Drawing 5083-MCU1 specifically addresses the above item and shows the proposed driveway plan and profile in accordance with Australian standards. Further Contours have nominated perimeter kerbing and a stormwater catch pit to the driveway and outdoor visitor car park to minimise potential concentrated stormwater discharge to downstream properties. item 3: Drainage assessment by a suitably qualified person to demonstrate that there will be no net increase in run off discharging from the site and no additional stormwater ponding of adverse impact on adjoining properties. Applicant’s Response to Item 3: Duke Environmental has prepared a response to item 3 of the information request. This Stormwater Quality Management Plan addresses the information request and demonstrates methods to achieve non worsening stormwater discharge effects to downstream properties. The applicant company considers that it has now responded to Council's request for information. Woutd you please issue a list of adjoining owners so we can commence public notification of the application? Please contact our Sunshine Coast office if you require any further information and/or clarification. SUNSHINE COAST OFFICE 1/199 GYMPIE TERRACE NOOSAVILLE - PO BOX 1684 NOOSA HEADS Q 4567 TELEPHONE 07 54555425 - FACSIMILE 07 54555725 [email protected] GYMPIE OFFICE 1/28 REEF STREET GYMPIE - PO BOX 391 GYMPIE Q 4570 TELEPHONE 07 54827440 - FACSIMILE 07 54824952 [email protected] town planners + urban designers
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 38 pages
Page 2
- @ Page 2 Yours faithfully a J ae 4 OAK? ~ Nadine Gorton Senior Planner Martoo Consulting Pty Ltd [Enclosure :12] [cc:] emait lan Gorton Design Andrew Duthie
Page 3
oy
ASO
Pra SO me
LEVEL 1 PLAN (SHOWING GFA)
GROSS FLOOR AREA CALCULATIONS
Gross floor area permitted max pop. density x 40 = 939.52m?
(23.488 x 40)
Gross floor area proposed 938.13m?
Denotes 'Gross Floor Area’
aA Tt 6 saris a Reports o 1s Propet Gient Sede Date raw By
oe Sone we BeBe aE rate Gera mctonionecannreh om Santa Eases 5 APARTMENT DEVELOPMENT OAK INVESTMENT HOLDING P/L 1:200@A3 AUG 2007 IAG lan Gorton
rs ct 1975 & Stancerd Busing F 1960 (as amended)
Quesnstand "4567 \aty a rororsan ae wcrweresetay wc Tene OWS a a= sale we roar teh pla a
ETN GST [Se eae eee 43- 45 ELANDA STREET SUNSHINE BEACH TOWN PLANNING CALCS - GFA 0710SD.09 B
Page 4
* STORMWATER QUANTITY MANAGEMENT PLAN * Duke PROPOSED APARTMENT DEVELOPMENT AT LOT 399 & 400 ON RP48112 ELANDA ST, SUNSHINE BEACH For OAK INVESTMENT HOLDINGS PTY LTD AA07731SMP January 2008 ATijs [email protected] PO Box 78 Wurtutla 4575 07 5493 3322 07 5493 3422 P, F E * AVIFONS — —_ ental N) Environmental Management Consultants —— T/A Duke Environmental Powerful Owl Qld Pty Ltd ABN 53 111 348 944
Page 5
P 07 5493 3322 F 07 5493 3422 E [email protected] PO Box 78 Wurtulla 4575 Powerful Owl Qld Pty Ltd T/A Duke Environmental ABN 53111 369 946 * Duke Environmental Environmental Management Consultants Document Control Parenthood Authorised for Issue Date Author Reviewer Name Document Status 08/01/08 Alister Trendell | Brett Thomson | Paula Duke A A - Approval B - Building Approval C- Construction T—For Tender | X- Information R — Revision The content of this document is provided in strict commercial confidence. The content of this document shall not be disclosed to any third party, without the express written authority of Duke Environmental. Copyright © Duke Environmental 2008. AA07731SMP January 2008 ATijs
Page 6
-3- 1.0 INTRODUCTION 5 1.1 Preamble wed 1.2 Site Location. 5 1.3 Description of the Proposal 5 1.4 Site Characteristics.............. ed 1.5 Site Constraints & Opportunities wed 1.6 Flooding 6 2.0 RAINWATER REUSE... ccc cee creeeeeceeeneeeeerenesevnenesetsesesseceasnsusveveneaenateeeetenasaeaenee 6 B.0 HYDROLOGY... ccc cccceresctecseneesseeceseeseseeseesseeseeseceseseecessenesseseeeeseseseesesteneseseaeae 6 3.1 Methodology 16 3.2 Mitigation Infrastructure Details... 7 3.3 Discussion of Results 8 4.0 CONCLUSIONS / RECOMMENDATIONS .....00...0.. ccc eceneersesenseeeseestsessnenasneeereeeereees 8 5.0 LIMITATIONS OF THIS STUDY o.oo... eee cceeeceseceteteeeececeececeereeeeteeneseeseseeeecesteetseeea 8 6.0 CLOSURE 0.0... ccc cccccccccccscscscssssnecscscesesesesesecaesscaesenaeeesausessesecaesecseecnesesneneteesesseseseetesetaeeea 9 7.0 REFERENCES ooo... ccccceccnesececeeecreeeeeneneneesesnenenenieagienseeeesasaecieiseeeesenineeatientinensanens 10 AA07731SMP January 2008 ATs
Page 7
APPENDIX A APPENDIX B -4- APPENDICES FIGURES AND DIAGRAMS Figure 1.0 — Locality Figure 2.0 — Aerial Duke Environmental Drawing No. DE07731/01 Duke Environmental Drawing No. DE07731/02 lan Gorton Design Drawing No. 0710SD.06 Noosa Council Natural Hazard: Landslide and Flood Overlay HYDROLOGIC CALCULATIONS 4A07731SMP January 2008 ATijs
Page 8
- 5 - 1.0 INTRODUCTION 1.1 Preamble Duke Environmental have been commissioned by Oak Investment Holdings Pty Ltd (via Contour Consulting Engineers) to undertake this Stormwater Management Plan. This report has been compiled generally in accordance with Noosa Shire Councils (NSC) Policy 5 - Engineering Design Standards Roads, Drainage and Earthworks (Section 4. Design and Approval — Drainage), and addresses Item 3 of Noosa Shire Council Information Request (Ref: 2007/2174), dated 5 December 2007. This report details proposed stormwater quantity management strategies to be incorporated into the construction and operation phases of the proposed development. 1.2 Site Location The subject site is located at 43-45 Elanda Street, Sunshine Beach, and is described as Lots 399 & 400 on RP 48112. The site has an area of approximately 0.15 ha. Refer Figure 1.0 in Appendix A for Site Locality Plan and Figure 2.0 in Appendix A for Aerial Photograph. 1.3 Description of the Proposal The applicant proposes to construct a development comprising of five (5) apartments, with associated driveways, swimming pools and car parking areas. Additionally, the development will contain a detention basin to aid in the provision of non-worsening of stormwater flows. Refer lan Gorton Design Drawing 0710SD.06 included in Appendix A. 1.4 Site Characteristics The site is accessed from Elanda Street and consists of two (2) lots. One (1) lot has a residential dwelling which is accessed by an unsealed driveway. Existing vegetation on the subject site is generally comprised of scattered trees and grassy areas. The topography of the site is mapped as steeply sloping generally from the southern boundary towards the north of the site. Refer Figure 2.0 - Aerial Photograph included in Appendix A. 1.5 Site Constraints & Opportunities Opportunity is provided to locate a Detention Basin within the site to treat stormwater runoff. Further, a closed tank system for every apartment is proposed to collect rainwater runoff from the roof areas. Roof rainwater runoff will be re-used to supply toilet flushing and landscape irigation. Runoff from carpark/driveway areas and overflow from rain water tanks will enter the Detention Basin before being released from the site. These are considered AA07731SMP January 2008 ATijs
Page 9
-6- effective measures to mitigate potential increases in flow tevels from the development. Refer Drawing DE07731/02 included in Appendix A for further details. 1.6 Flooding With reference to Noosa Council Natural Hazard: Landslide and Flooding Overlay Map (OM4.3), the subject site is not within the Q100 Flood Prone Area. Refer Appendix A for extract from overlay map. 2.0 RAINWATER REUSE With reference to Noosa Council Designated Rainwater Tank Area Map, the subject site is within an area that requires rainwater tanks. Schedule 8 of the Noosa Planning Scheme requires a minimum storage capacity of 3000 litres per dwelling unit. In addition, water from the rainwater tanks is to be used for: a) Flushing of toilets internal to the building; b) Extemal irrigation, topping up of swimming pools or water features and outside cleaning. All rainwater tanks are to be designed and installed as per the Queensland Development Code (QDC), Part 25 — Rainwater Tanks. Refer Duke Environmental Drawing DEO7731/02 in Appendix A for proposed location of rainwater tanks. 3.0 HYDROLOGY 3.1 Methodology It is proposed to mitigate the effects of the proposed development on stormwater discharge rate by way of incorporating a Detention Basin. This system is proposed to capture runoff from the site to maintain design discharges up to, and including, the 100 year ARI event, from pre to post development scenarios (non-worsening). Refer to Drawing DEO7731/02 included in Appendix A for details. Three different hydrological cases were investigated for the purpose of this study: Case 1: Pre-Development site (existing) Case 2: Post-Development of site (without mitigation) Case 3: Post Development with mitigation strategies implemented (Detention Basin) The XP-RAFTS Run-off Routing Software was used for hydrological analysis of the pre and post development catchments. Table 4.1 summarises adopted discharge rates for the design critical storm duration, and the corresponding rational method discharge. Refer Appendix B for internal site hydrologic calculations and variables. AA07731SMP January 2008 ATijs
Page 10
-7- The Rational Method was used to check adopted discharge rates. Parameters adopted were generally based on recommendations in Australian Rainfall & Runoff (iEAust 1997), and the Queensland Urban Drainage Manual (1994). The pre and post development catchments for the development site outlined in Drawing DE07731/01 in Appendix A. Detailed hydrologic calculations for the intemal pre and post catchment, listing ail variables adopted, have been included in Appendix B. Results indicating the effectiveness of the proposed mitigation methods for the ARI storms investigated are detailed in Table 3.1 below. Table 3.1 Model Results ARI Site Catchment Discharge (m*/sec) Detention Storm CASE 1 Pre-Development CASE 2 CASE 3 System Details Post- Post-Dev | Water Depth Development | with Basin (m) XP-RAFTS Rational XP-RAFTS | XP-RAFTS Method 2 year 0.057 0.035 0.084 0.057 0.29 5 year 0.075 0.049 0.080 0.069 0.39 10 year 0.084 0.057 0.089 0.080 0.44 20 year 0.097 0.068 0.101 0.097 0.48 50 year 0.103 0.086 0.108 0.102 0.49 100 year 0.115 0.100 0.120 0.114 0.51 Site specific intemal catchment mitigation infrastructure used to model discharges from the site is summarised below. Refer to Drawings DEO7731/02 in Appendix A for details. 3.2 Mitigation Infrastructure Details Details of the detention basin used to model discharges from the site is summarised below. Adopted Basin parameters are: e Low level pipe outlet: 0.0m (assumed detention) e Low level pipe outlet type: RCP e Low level pipe outlet specification: 1x225mm diameter e Weir height: 0.4m (above assumed detention) e Weir width: 0.6m e Depth over weir (Q1o0): 0.11m * Total storage volume required: 11.3m? e Detention depth in basin (Q100): 0.51m (above assumed detention) Refer to Drawing DE07731/02 in Appendix A for details. Refer Appendix B for RAFTS output results. AA07731SMP January 2008 ATs
Page 11
3.3 Discussion of Results With reference to the results detailed in Table 2.1, it can be seen that the proposed mitigation system (“Case 3”) provides effective non-worsening of discharges in comparison to the pre-development case (“Case 1”). This is achieved by the inclusion of Detention Basin storage. It is to be noted that the above analysis is considered to provide conservative results for the following reasons: « The effects of roof water collection systems proposed to be installed at the site have been ignored. 40 CONCLUSIONS / RECOMMENDATIONS We consider that the above accurately, and conservatively, models the stormwater runoff characteristics of the subject catchment. Catchment areas, and _ individual components of the proposed water quantity treatment systems, are detailed above. We consider that this report demonstrates no net increase in stormwater run-off discharging from the site in comparison to the pre development case. 5.0 LIMITATIONS OF THIS STUDY This study has been tailored to investigate issues in the context of the proposal, and at the area of interest, being Lots 399 & 400 Elanda Street, Sunshine Beach. Individual sub-catchments situated above, and below the area of interest, may have different hydrological / hydraulic influences. Hence, the information contained in this report is not to be used outside of the subject area. We consider that the study accurately reflects the conditions for the area of interest, at the time the study was undertaken. The results of this study should be reviewed if catchment / proposal conditions change in the future. Where applicable, and due to their latent nature, subsurface conditions and/or water quality monitoring results may vary significantly across the site and/or temporally in comparison to those described herein. Notwithstanding the above, this report has been undertaken for the specific purposes of Oak Investment Holdings Pty Ltd (via Contour Consulting Engineers), as detailed in our correspondence to them, and is solely for the use of Oak Investment Holdings Pty Ltd (via Contour Consulting Engineers Pty Ltd). This report is only to be used in full, and may not be used to support objectives other than those set out herein, except where written approval, with comments, are provided by Duke Environmental. Duke Environmental accept no responsibility for the accuracy of information supplied to them by second and third parties. 4A07731SMP January 2008 ATjs
Page 12
6.0 CLOSURE This report has been undertaken in general accordance with the Queensland Urban Drainage Manual, other industry standard guidelines, and under the direction of a Registered Professional Engineer of Queensland. Should further information be required please contact: Yours faithfully Alister Trendell g/Paula Duke BE Hons MEngSc BAppSc(Chem) PGDipEd CEnvP MEIANZ Environmental Engineer Principal Environmental Scientist For Duke Environmental For Duke Environmental PO Box 78 Wurtulla QLD 4575 P: 07 5493 3322 F: 07 5493 3422 AA07731SMP January 2008 ATfs
Page 13
-10- 7.0 REFERENCES Department of Natural Resources & Mines 2005, Planning Guidelines for Water Supply & Sewerage Chapter 5 - Demand / Flow and Projections. 2. Engineers Australia 2006, Australian Runoff Quality, A Guide to Water Sensitive Urban Design. 3. Engineers Australia 2006, Australian Runoff Quality, A Guide to Water Sensitive Urban Design. 4. Main Roads Department — Urban Drainage Manual — Volume 2. 5. Neville Jones & Associates & Australian Water Engineering, Queensland Urban Drainage Manual Volume 1 — Text (1994). 6. Noosa Shire Council - Planning Scheme. AAO7731SMP January 2008 ATs
Page 14
APPENDIX A FIGURES & DIAGRAMS 731 January 2008
Page 15
SUNSHINE
\ SO 7S 9
mY ce
s\ \ Es
2 x OO
5 Cn
B85 JINI5)
38:
National
Ru
Unio:
Club)
|
Park
GIRRAWEE
CT
S
EN) / BE®
ational \
h
DUKE ENVIRONMENTAL
DE 07731
LOCALITY - FIGURE 1.0
SITE =%
Page 16
DE 07731 AERIAL - FIGURE 2.0 a _ Zz Lu = Zz O oe => =z Lu Lu x< = Q
Page 17
ELANDA STREET ELANDA STREET
a -
\
|
TOTAL } TOTAL
CATCHMENT 2 7 CATCHMENT
AREA 1468m? AREA 1468m’
1 — — ee r ae — +
1 —_
| EXISTING \ i |
DWELLING :
| Nie |
5) | 0
| | omeecpemed at Tee es ; |
\
\ | !
| iPERvious - | | i Lay
SX 420m? 1 |
50 = l i |
i
L i
--------------- 1 po--------4-----+4
A | | eee | |
1
| ii
| { IMPERVIOUS AREA |
4 | | 1035m’
ee ee
| aa! I f
APPROXIMATE i
DIRECTION OF | | it
fad STORMWATER i
FLOW !
l !
il
malt
| | MS US ee oe re al
I i
=e t =
| aol I eg
| _ | te
°
A
; , | 3
~ = YI APPROXIMATE
h ran 2) ~ DIRECTION OF |
| 4 ° Ke ~ STORMWATER
p | = “ FLOW
| AA > Ad
44 |
{oo ee | | = -
— — —_ a = = — nee — |
aaa face eS APPROVED DOCUMENT STATUS mc . cuen CONTOUR CONSULTING ENGINEERS
Deen FOR APPROVAL E pRoys-’ PROPOSED APARTMENT DEVELOPMENT
pate (Not for Construction) PO 2 ig 43 - 45 ELANDA STREET can ae
Checke BAT Survey By; Definumn SUNSHINE BEACH DRAWING No
jecked Daum AHO | sie AS UKE ENVIRONMENTA tre | CATCHMENT PLAN DE07731/01
Page 18
a NOT FOR CONSTRUCTION me Ae APPROXIMATE EXTENT OF ROOF AREA > } 2 : ¢ : 3 ‘Z Q ' é € , APPROXIMATE EXTENT OF UNCOVERED ENTERTAINING AREA STORMWATER INLET PIT aay GRADED TO ENSURE RUNOFF TO STORMWATER PITS yO UNDERGROUND CAR PARKING UNDERGROUND CAR PARKING ELANDA STREET sence el __— LEVEL SPREADER NOTE: 1. PROPOSED STORMWATER INFRASTRUCTURE SHOWN IS INDICATIVE ONLY AND IS SUBJECT TO CHANGE AT DETAILED DESIGN PHASE. 2 HYDRAULIC DESIGN OF STORMWATER INFRASTRUCTURE BY PROJECT CONSULTING ENGINEER. INLET PIT DRAINAGE UNE ~ ROOF AREA OVERFLOW FROM ma Hessehidla 50001 RAINWATER ae Tani VOLUME 1 RAINWATER TANKS TANKS (OR EQUIVALENT) (APPROX. AREA Som") 0.5m OVERFLOW WEIR Q100 FLOOD LEVEL TO LEVEL SPREADER el — ee eee 3 | Ss LEVEL SPREADER a ms ye | & . INLETS FROM RAINWATER 7 7 = Reames eer ozevoobteve , cpa sca : = GRAVEL eas BIO-RETENTION BASIN >| Dat = - = Design AT DOCUMENT STATUS *§ = cuens _CONTOUR CONSULTING ENGINEERS Orawn M.B. FOR APPROVAL 5 prRoje>? PROPOSED APARTMENT DEVELOPMENT Date 07-01-08 (Not for Construction) * xe 43-45 ELANDA STREET Sheet 2 of 2 Checked: BAT. ey / SUNSHINE BEACH DRAWING No i SS | en | eee ee fp dau ano [sz AS pf xx $ ouan is Commany enorecren sy Ouxé envinonwenrat || Tru, _ STORMWATER MANAGEMENT PLAN DE07731/02
Page 19
sectlon of pop up rool cokorbond metal roof
ce
‘uminium sun contol awrings
t
is
feature enbry doors
WEST ELEVATION...{from Elanda Street)
expressed grooves to rendered block
batien Keatment to bil shat = powdercoated aluminium framed windows,
Ae
glass balusvade
EAST ELEVATION...
dass baksstedng
tendered block planters
SOUTH ELEVATION...
rendered block walts
powdercoated aluminium windows ‘Sompressed FC awnings batten screening to iit ehaft
rendered block walls ‘colorbond roafing
'
\
1
|
‘
conc. the pool
fading screen baesvede
NORTH ELEVATION...
‘ i CONSULTANTS Prokact _ Ghent Seas Osis Drawn By , a,
Soe sunsine geaci reeo Catattpeargy ei alent Sainte neasio® hate a | Santee 5 APARTMENT DEVELOPMENT OAK INVESTMENT HOLDING P/L 4:200@A3 AUG 2007 AG ENGEREN
1, zs & the: , —_——$$—_—_—_ a — "= : beg *
QuesAElans 4587 (hij al creratnsan opto cence ta yo ee an cages ae of DYShS} i. Nn
Fr S400 2 3 Se cmau | piambiauet trea Copter en deer tara aS-ASELANDA STREET SUNSHINE BEACH ~FLEVATIONssweeTt = O740SD.06 =) LE
Page 20
Noosa Council Eastern Beaches Natural Hazard: Landslide & Flooding Overla Map OM4.3 25p . REE Eastern Beaches North Inset Scale 1cm = 220m , VERS > Seer Siri fs NN SS ROSS PEN ES \ SS Natural Hazard: Landslide & Eastern Beaches Flooding Overlay ra! Zz x 3S $ ao 2 oovwe Zse Z2£as n S ses 32° Zzas = 1 1 3 3 psPzEe £sts eSRke 3038 2ee2 | = Oy = Q = = Streams, Rivers and Drainage Lines Inset Landslide Hazard Area Extent of a td Flood Mapping Flood Hazard Area t Subject Site Page 1 of 1 AA07731SMP January 2008 ATijs
Page 21
APPENDIX B HYDROLOGIC CALCULATIONS 731 January 2008
Page 22
‘DUKE ENVIRONMENTAL DESIGN UTATIONS PRINCIPAL: “CONTOUR CONSULTING ENGINEERS JOB: "BLANDA STREET, SUNSHINE BEACH JOB No.: Deo7731 BY: AT TIME OF CONCENTRATION CALCULATIONS : PRE DEVELOPMENT T=(107nLA0.333)/S°O.2 Time of concentration (min) 10.24 Total Distance 50.00] Length in Gradient % [Time (Minutes) ‘Sheet Flow 50 9.045 15.5) 10.24 Copy of 0E07731 - Time of concentration calculations.x1s 7101/2008 14:02 AM
Page 23
DUKE ENVIRONMENTAL _
DESIGN COMPUTATIONS
PRINCIPAL: CONTOUR CONSULTING ENGINEERS
JOB; ELANDA STREET, SUNSHINE BEACH
408 No.: DEO7731
BY: aT
NY He ROI RMINATION F I
ARL EBACT, [MP INTENSITY RUNOFF ADOPTED RUNOFF COMMENTS
tyeare) (6. QUDM GOFF (110) COEFF (C19) COEFF
q ¢S0mip. 210) TABLE 5.04.2 TAGLE 5.04.3
SUB-CATCH TYPE 1| SUB-CATCH TYPE 1 | SUB-CATCH TYPE 1|_SUB-CATCH TYPE 4 | SUB-CATCH TYPE 1|
028 oa 2 0.82 0.82
4 08 2 0.82 0.95
2 oo n 0.82 0.70 URBANSED
& o8 re 0.82 0.78 CATCHMENT
1g 08 2 082 0.82
2a 08 m2 0.82 0.86
50 06 n 0.82 0.04
100 26 2 0.82 0.99
ARI FRACT [MP INTENSITY BUN-OFF AROPTEO RUN-OFE COMMENTS:
Groara) (GLOupM COEFE 1110) GOEFF (ctoy COEFF
TABLE 5.04.1 TABLE 5.04.2 TABLE £.04,3
IB-CATCH TYPE 2| SUB-CATCH TYPE 2 | SUB-CATCH TYPE 2| SUB-CATCH TYPE 2 | SUB-CATCH TYPE 2
28 0.0 72 0? 0.83
1 oo R 07 0.5¢
2 00 7 a7 9,80 RURAL
& 0.0 R or 0.07 CATCHMENT
19 ao a O7 0.70
zo 00 is 07 074
ao 0.0 nm 07 om
100 0.0. 72 7 0.84
ARI EBACT IMP IWDENSIrY RUNOFF ADOPTED RUN-OFF COMMENTS:
(wears) {f. QUDM CORFE (HNO) COEFF (C101 COEFF
TARLE 5.04.1 (60min, 010) TABLE 5.04.2 TABLE 5.04.3
UB-CATCH TYPE 3| SUB-CATCH TYPE3 | SUB-CATCH TYPE 3| SUB-CATCH TYPE 3 | SUB-CATCH TYPE 3
225 02 72 om 0.53
L 02 2 ov” 0.87
2 oz 72 a7 RURAL RESIDENTIAL
a 02 m%@ 07 CATCHMENT
10 02 re ars
29 02 72 on
6Q 02 a O71
100 02 72 ont
AB) FRACTIMP INTENSITY ‘BUN-OFF ADOPTED RUNOFE COMMENTS
(yeara) dhauom COEFF (110) GOBFE C10) GOEFF
TABLE 6.04.3
SUB-CATCH TYPE 4| SUB-CATCH TYPE 4 | SUB-CATCH TYPE 4/ SYB-CATCH TYPE 4 | SU8-CATCH TYPE 4
2.25 10 7 09 0.68
1 10 2 oa ore
2 10 72 09 O77 COMMERCIAL
8 10 nm 09 0.86
1 1.0 2 9 0.00
za 10 72 09 095
sa 10 7 09 1.00
190 10 72 29 4.00
‘AR! | LOCFOR SUB-CATCH1| NEXTSUB-CATCH NEXT SUB-CATCH TOTAL INTENSITY FOR TOG
(years)! (OVERLAND FLOW} (CHANNEL FLOW) nin) roc {oumibr}
nin} cu) ° (miny ?
2 2
‘225 74.0 ae ae
1 149 00 00 14.0 97.0
2 140 0.0 oo wo 123.8
5 14.0 0.0 0.0 40 153.6
10 140 oo 90 140 170.3
29 140 00 90 140 193.3
50 140 0.0 00 14.0 223.6
102 140 0.0 0.0 140 240.8,
AR} AREA AREA AREA AREA ADOPTED ELOW
(years) ae OF. QF QE r (mdisec)
5 A QUB-CATCH TYPE 2 SUB-CATCH TYPE 3 ‘SUB.CATCH TYPE 4
sha) hay ba. {hal
25 0.147 9.00 0.00 0.00 0.012.
1 0.147 0.00 0.00 0.00 0.026
2 0.147 0.00 0.00 0.00 0.035
8 ona? 0.00 aan 0.00 0.049
1g 0447 0.00 0.00 9,00 0.057 \
20 ona 0.00 9.00 4.00 0.068
50. 0.147 0.00 0.00 0.00 0.986
13 0.147 0.00 2.00 0.00 Q.099
Cachinent SUBCATCH TYPE ‘SUB-CATCH TYPE SUB-CATCH TPES ‘SUB-CATCH TYPE 4 Total
ces 008s
ness ° ° e oss
‘Copy of GEO7731 Rabonal Mend - SMP Flow Cab se
TO1T008
1102 ata
0
125
158
m
08
20
mT
“9
108
188
ae
* 9.2
9704
1238
163 68
170,38
193.92
223,84
208,34
PRE DEV
Page 24
DEO7731 POST DEV MIT.out Run started at: 2ist December 2007 9:00:59 BARA AEE AEA TE TETRA EAE AEE TE AEE EEA EA EAE EA AEA EAE AE EE EEE EE EEE AE AEE EAE EAE EEE AE EE HHeHE RUNTIME RESULTS ARAB AEE AEE AP AEA TEA AEE AE AE AR AE EAE EE EEA EAE AEA A AE EAE AE EE EE EE EEE ER RHHH Max. no. of links allowed = 2000 Max. no. of routng increments allowed = 25000 Max. no. of rating curve points = 25000 Max. no. of storm temporal points = 25000 Max. no. of channel subreaches = 25 Max link stack level = 25 Input Version number = 650 LINK POST DEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.4141E-01 ESTIMATED PEAK FLOW (CUMECS) = 0.06 ESTIMATED TIME TO PEAK (MINS) = 14.50 HEA HH ET EE EEE AE AE EAE AEH AEA AEA AHA EEE EER EAHA ABA EAA EEE HARE HeHHH Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 HHHHAHHARBER AAA AHEE HATHA EAR ERAAHEAAHA AHA AARHA EA AHEHHAEH AEH ER EPH R EER #ettt ROUTING INCREMENT (MINS) = 0.50 STORM DURATION (MINS) = 25. RETURN PERIOD (YRS) = 2. BX = 1.0000 TOTAL OF FIRST SUB-AREAS (ha) = 0.04 TOTAL OF SECOND SUB-AREAS (ha) = 0.10 TOTAL OF ALL SUB-AREAS (ha) = 0.15 SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. (ha) (%) (%) POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Page 1
Page 25
DEO7731 POST DEV MIT.out Label Intensity #1 #2 #1 #2 a #2 Inflow to Lag Cmm/h) C mm ) (mm/h) mm ) (mA3/s) Peak mins POST DEV 82.549 12.50 1.500 17.50 0.000 16. So 32.895 0.0635 14.50 0.000 SUMMARY OF BASIN RESULTS Link Time Peak Time Peak Total = --------- Basin --------- Label to Inflow to outflow Inflow Vol. vol. Stage Peak (mA3/s)} Peak (mA3/s) (mA3) Avail Used used POST DEV 14.50 .0635 15.00 0574 41.411 0.0000 3.8851 0.2926 SUMMARY OF BASIN OUTLET RESULTS Link No. s/D Dia width Pipe Pipe Label of Factor Length Slope (m) (m) (m) (m) (%) POST DEV 1.0 +2250 0.000 5.000 3.000 LINK POST DEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.5388E-01 ESTIMATED PEAK FLOW (CUMECS) = 0.08 ESTIMATED TIME TO PEAK (MINS) = 15.00 Fete ag TERE EEE TEER EEE EEA EER EEA EEE EEE EE HH Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 EAE EAE AEE EAE AEE EA EE EEE AE EES HHHHH ROUTING INCREMENT (MINS) STORM DURATION (MINS) RETURN PERIOD (YRS) Bx TOTAL OF FIRST SUB-AREAS (ha) TOTAL OF SECOND SUB-AREAS (ha) TOTAL OF ALL SUB-AREAS (ha) bru N- “ SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 «#2 No. cha) (%) (%) POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag (mm/h) C mm ) (mm/h) C mm) (mA3/s) Peak mins POST DEV 103.19 12.50 1.500 17.50 0.000 25. 247" 41.497 0.0799 15.00 0.000 SUMMARY OF BASIN RESULTS Link Time Peak Time Peak Total --------- Basin ~--------
Page 26
DEO7731 POST DEV MIT.out Label to Inflow to outflow Inflow vol. vol. Stage Peak (mA3/s) Peak (mA3/s) (mA3) Avail used Used POST DEV 15.00 .0799 15.00 .0693 53.879 0.0000 6.6569 0.3926 SUMMARY OF BASIN OUTLET RESULTS Link No. s/D Dia width Pipe Pipe Label of Factor Length Slope (m) (m) (m) (m) (%) POST DEV 1.0 .2250 0.000 5.000 3.000 LINK POST DEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.6053E-01 ESTIMATED PEAK FLOW (CUMECS) = 0.09 ESTIMATED TIME TO PEAK (MINS) = 15.00 HAE AE AE AEE AE AEE AEA A AEH A AEE ABER EAE AE AEE AEA AE EE EE EE EAE EEE AE AEE EAE AE A EE EEE HHEHH Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 HHHHHHEAAHHHA AAA AHAAHHEE HARARE AA HEH AAHHAAAH HHH HAHAHA RBH BER HAR RARER RR HHHHH ROUTING INCREMENT (MINS) = 0.50 STORM DURATION (MINS) = 25. RETURN PERIOD (YRS) = 10. BX = 1.0000 TOTAL OF FIRST SUB-AREAS (ha) = 0.04 TOTAL OF SECOND SUB-AREAS (ha) = 0.10 TOTAL OF ALL SUB-AREAS (ha) = 0.15 SUMMARY OF CATCHMENT AND RAINFALL DATA Link catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. (ha) (%) %) POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag (mm/h) C mm +) (mm/h) C mm ) (mA3/s) Peak mins PosT DEV 114.19 12.50 1.500 17.50 0.000 29. 685 "46. 081 0.0887 15.00 0.000 SUMMARY OF BASIN RESULTS Link Time Peak Time Peak Total = --------- Basin --------- Label to Inflow to outflow Inflow vol. vol. Stage Peak (mA3/s)} Peak (mA3/s) (mA3) Avail used Used POST DEV 15.00 .0887 15.00 - 0800 60.527 0.0000 8.1551 0.4368 SUMMARY OF BASIN OUTLET RESULTS Link No. s/D Dia width Pipe Pipe Label of Factor Length Slope Page 3
Page 27
DEO7731 POST DEV MIT. out (m) (m) (m) (m) (%) POST DEV 1.0 -2250 0.000 5.000 3.000 LINK POST DEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.7023E-01 ESTIMATED PEAK FLOW CCUMECS) = 0.10 ESTIMATED TIME TO PEAK (MINS) = 15.00 TEE AEE EA AEE EA a AAA a HHHEH Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 HEAR A AA AA AA AER EAE TEE AAAS EEA HeHHH ROUTING INCREMENT (MINS) = 0.50 STORM DURATION (MINS) = 25. RETURN PERIOD (YRS) = 20. Bx = 1.0000 TOTAL OF FIRST SUB-AREAS (ha) = 0.04 TOTAL OF SECOND SUB-AREAS (ha) = 0.10 TOTAL OF ALi SUB-AREAS (ha) = 0.15 SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. Cha) : (%) (%) POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag (mm/h) C mm ) Cmm/h) C mm ) (mA3/s) Peak mins POST DEV 130.11 12.50 1.500 17.50 0.000 36.171 52.713 0.1014 15.00 0.000 SUMMARY OF BASIN RESULTS Link Time Peak Time Peak Total = --------- Basin -~-------- Label to Inflow to outflow Inflow vol. Vol. Stage Peak (mA3/s) Peak (mA3/s) (mA3) Avail Used Used POST DEV 15.00 .1014 15.00 - 0967 70.225 0.0000 9.7043 0.4782 SUMMARY OF BASIN OUTLET RESULTS Link No. s/D Dia width Pipe Pipe Label of Factor Length Slope (m) (m) (m) (m) (%) POST DEV 1.0 -2250 0.000 5.000 3.000 LINK POST DEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.8288E-01 ESTIMATED PEAK FLOW (CUMECS) = 0.11 Page 4
Page 28
DEO7731 POST DEV MIT.out ESTIMATED TIME TO PEAK (MINS) = 15.00 BREA AA AE EERE AEE EEE EEA ERA AA EAA AEE EE HEE AAA EEE EEE EAE EEE EA HHAHH Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 HHHAHHAHHHHHAHAHAEAAAEAEHHAAAAAAHARAAEEE A AAAAARAAAAAAAaHARAAARAAAAEAAE EERE EAE HHHeHt ROUTING INCREMENT (MINS) = 0.50 STORM DURATION (MINS) = 25. RETURN PERIOD (YRS) = 50. BX = 1.0000 TOTAL OF FIRST SUB-AREAS (ha) = 0.04 TOTAL OF SECOND SUB-AREAS (ha) = 0.10 TOTAL OF ALL SUB-AREAS (ha) = 0.15 SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 «#2 #1 #2 #1 «#2 No. Cha) %) (%) POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 * #2 Inflow to Lag (mm/h) C mm ) (mm/h) m ) (mA3/s) Peak mins POST DEV 150.99 12.50 1.500 17.50 0.000 44. sai "64. 415 0.1057 15.00 0.000 SUMMARY OF BASIN RESULTS Link Time Peak Time Peak Total = --------- Basin --------- Label to Inflow to outflow Inflow vol. vol. stage Peak (mA3/s) Peak (mA3/s) = (m3) Avail Used Used POST DEV 15.00 .1057 15.00 -1021 82.884 0.0000 10.200 0.4897 SUMMARY OF BASIN OUTLET RESULTS Link No. s/D Dia width Pipe Pipe Label of Factor Length Slope (m) (m) (m) (m) (%) POST DEV 1.0 .2250 0.000 5.000 3.000 LINK POST DEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.9263E-01 ESTIMATED PEAK FLOW (CUMECS) = 0.12 ESTIMATED TIME TO PEAK (MINS) = 14.00 HEAHHAEAHERAAAHAAEERAAR AAA RAEAGA HABA EB BEEA BABA AEEAAA EH ARATE ABA EAAAEH PRA EH AD HAE HAEHH Elanda Street, Sunshine Beach Page 5
Page 29
DEO7731 POST DEV MIT.out Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 AEE EEE AEE EEE EEE EE HAEHH ROUTING INCREMENT (MINS) STORM DURATION (MINS) RETURN PERIOD (YRS) BX TOTAL OF FIRST SUB-AREAS (ha) TOTAL OF SECOND SUB-AREAS (ha) TOTAL OF ALL SUB-AREAS (ha) kona b uot al SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern Label th ) #2 #1 #2 #1 #2 #1 #2 a POST DEV 0.0433 0.1035 0.50 25. 100. 0000 0.04 0.10 0.15 B Link #1 = #2 No. (%) (%) 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag (mm/h) (mm ) (mm/h) C mm ) (mA3/s) Peak mins POST DEV 166.95 12.50 1.500 17.50 0.000 51.206 68.060 0.1173 14.00 0.000 SUMMARY OF BASIN RESULTS Link Time Peak Time Peak Total --------- Basin --------- Label to Inflow to outflow Inflow vol. vol Stage Peak (mA3/s) Peak (mA3/s) (mA3) Avail used used POST DEV 14.00 .1173 15.00 +1143 92.634 0.0000 11.266 0.5141 SUMMARY OF BASIN OUTLET RESULTS Link No. s/D Dia width Pipe Pipe Label of Factor Length Slope (m) (m) (m) (m (%) POST DEV 1.0 -2250 0.000 5.000 3.000 Run completed at: 21st December 2007 9:01:00 mik open 0 Page 6
Page 30
DEO7731 POST DEV.out Run started at: 20th December 2007 14:48:28 BRERA AE HATE EE AAA AEH HA AA AAA EEA ABH AAA AHHH AE AAA AAA HH AER #HttH RUNTIME RESULTS FEE AEB AEE AE AEE AEA EEE EAE AE AE EATER EE EAE EA AE EAE AE EAE AEA EA AEA EEE AE EE HEHEHE Max. no. of links allowed = 2000 Max. no. of routng increments allowed = 25000 Max. no. of rating curve points = 25000 Max. no. of storm temporal points = 25000 Max. no. of channel subreaches = 25 Max link stack level = 25 Input version number = 650 LINK POST DEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.4141E-01 ESTIMATED PEAK FLOW (CUMECS) = 0.06 ESTIMATED TIME TO PEAK (MINS) = 14.50 HAHAHAHAHAHA RAAEAAHEAHHAABHH EAA BEABHA AAA AAEAE EH HA ABHAHAAA BARA HARRAH HHH HHT Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 HHAEHRHEHAAHAEAEHE HE AAAHAEH EH EB AH EEE ABH AAA A AA AAAHAARAEE HAAH HARE AH HARES HatHE ROUTING INCREMENT (MINS) = 0.50 STORM DURATION (MINS) = 25. RETURN PERIOD (YRS) = 2. BX = 1.0000 TOTAL OF FIRST SUB-AREAS (ha) = 0.04 TOTAL OF SECOND SUB-AREAS (ha) = 0.10 TOTAL OF ALL SUB-AREAS (ha) = 0.15 SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. Cha) (%) @%) POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Page 1
Page 31
DEO7731 POST DEV.out Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag (mm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins POST DEV 82.549 12.50 1.500 17.50 0.000 16.994 32.895 0.0635 14.50 0.000 LINK POST DEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.5388E-01 ESTIMATED PEAK FLOW (CUMECS) = 0.08 ESTIMATED TIME TO PEAK (MINS) = 15.00 HAE AE EER EAHA HAA EAR EH RAE HEE EAE AAA AEE HeHHH Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 HAA AEA EAE AETHER AEE AEA EAE EAE AEE EAE EEA AEE AA HHHHH ROUTING INCREMENT (MINS) STORM DURATION (MINS) RETURN PERIOD (YRS) Bx 1 TOTAL OF FIRST SUB-AREAS (ha) = 0.04 TOTAL OF SECOND SUB-AREAS (ha) = TOTAL OF ALL SUB-AREAS (ha) = bueou i Ne wv SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. Cha) (%) (%) POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag (mm/h) C mm +) (mm/h) C mm ) (mA3/s) Peak mins POST DEV 103.19 12.50 1.500 17.50 0.000 25.247 41.497 0.0799 15.00 0.000 LINK POST DEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.6053E-01 ESTIMATED PEAK FLOW CCUMECS) = 0.09 ESTIMATED TIME TO PEAK (MINS) = 15.00 BAER AER ADR RE AERA HAA ARAB ABA EAA EPAAEH HAHAHAHAHA HEsHE Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 HHH ER ERE RARER AEEBEHATHE AAR AABAAAHAAAAAEHREEHAEEE ERY Ee a HEHE ROUTING INCREMENT (MINS) = 0.50 Page 2
Page 32
DEQ7731 POST DEV.out STORM DURATION (MINS) RETURN PERIOD (YRS) BX TOTAL OF FIRST SUB-AREAS (ha) TOTAL OF SECOND SUB-AREAS (ha) TOTAL OF ALL SUB-AREAS (ha) .0000 How te SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. Cha) (%) (%) POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag (mm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins POST DEV 114.19 12.50 1.500 17.50 0.000 29. 685 "46. 081 0.0887 15.00 0.000 LINK POST DEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.7023E-01 ESTIMATED PEAK FLOW CCUMECS) = 0.10 ESTIMATED TIME TO PEAK (MINS) = 15.00 FN TERE EEE TE I A TTT TT AT AI TE HHH Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 IE ER EERE EER I EEE A EE EEE ROUTING INCREMENT (MINS) STORM DURATION (MINS) RETURN PERIOD (YRS) Bx TOTAL OF FIRST SUB-AREAS (ha) TOTAL OF SECOND SUB-AREAS (ha) TOTAL OF ALL SUB-AREAS (ha) 0.50 25. 20. . 0000 0.04 0.10 0.15 Hide SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 (#2 #1 #2 #1 #2 No. Cha) (%) (%) POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inftow to Lag (mm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins POST DEV 130.11 12.50 1.500 17.50 0.000 36.171 52.713 0.1014 15.00 0.000 LINK POST DEv 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.6184E-01 Page 3
Page 33
DEO7731 POST DEV.out ESTIMATED PEAK FLOW (CUMECS) = 0.11 ESTIMATED TIME TO PEAK (MINS) = 10.00 HERHH AREA EAHA AAAAEEA HAAR AAE ERE AHH AAEAHHHARA ERE EAH AUB H #H##HH Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 HAA BA AAA ATA AEA AAA AEA AHA AEA AH HEA A EEE AEA AEE A HHHHH ROUTING INCREMENT (MINS) = 0.50 STORM DURATION (MINS) = 15. RETURN PERIOD (YRS) = 50. BX = 1.0000 TOTAL OF FIRST SUB-AREAS (ha) = 0.04 TOTAL OF SECOND SUB-AREAS (ha) = 0.10 TOTAL OF ALL SUB-AREAS (ha) = 0.15 SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. Cha) (%) (%) POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time = Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag Cmm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins PosT DEV 191.29 12.50 1.500 17.50 0.000 31.989 46.322 0.1079 10.00 0.000 LINK POST DEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.8198E-01 ESTIMATED PEAK FLOW CCUMECS) = 0.12 ESTIMATED TIME TO PEAK (MINS) = 10.00 HAA AEE EE AE EAE EEE AEE EEE EEE AEE EE EAE AEE EEE AH HHHHH Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 BEARER AE AEE HE EAE EAE EEE AEH AE EAE EH HHHHH ROUTING INCREMENT (MINS) = 0.50 STORM DURATION (MINS) = 20. RETURN PERIOD (YRS) = 100. Bx = 1.0000 TOTAL OF FIRST SUB-AREAS (ha) = 0.04 TOTAL OF SECOND SUB-AREAS (ha) = 0.10 TOTAL OF ALL SUB~AREAS (ha) = 0.15 SUMMARY OF CATCHMENT AND RAINFALL DATA Page 4
Page 34
DEO7731 POST DEV.out Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. (ha) (%) (%) POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag (mm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins POST DEV 185.57 12.50 1.500 17.50 0.000 44. 983 "60. 358 0.1199 10.00 0.000 Run completed at: 20th December 2007 14:48:30 mik open 0 Page 5
Page 35
DEO7731 PRE DEV.out Run started at: 20th December 2007 14:39:16 AEA EEE HAE TER AAA BARA AA AAA HA BABA EAHA A BH AER AEA AE A EAB AH HHEHH RUNTIME RESULTS BRE AEA AE AREA AE EAE AEE AE HE EAE AEA EAE AEA BA EAE AEE AE AEA AE EAE EEE AE EE EE EAE EAE EA EEA AE EE HEAEE Max. no. of links allowed = 2000 Max. no. of routng increments allowed = 25000 Max. no. of rating curve points = 25000 Max. no. of storm temporal points = 25000 Max. no. of channel subreaches = 25 Max link stack level = 25 Input Version number = 650 LINK PREDEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.2691E-01 ESTIMATED PEAK FLOW (CUMECS) = 0.06 ESTIMATED TIME TO PEAK (MINS) = 15.00 HARRAH HAHA A AHA AHHH AAA AEH HAE ARH HAA HH RAHA HBB HHH HH HHHAH Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 HEAEEHHEABAAEHE HAA AEH AAA AR ARBAARAAAAABHAAH HAAR HH HH HABA A HARARE HH HHHHE ROUTING INCREMENT (MINS) = 0.50 STORM DURATION (MINS) = 25. RETURN PERIOD (YRS) = 2. Bx = 1.0000 TOTAL OF FIRST SUB-AREAS (ha) = 0.13 TOTAL OF SECOND SUB-AREAS (ha) = 0.01 TOTAL OF ALL SUB-AREAS (ha) = 0.15 SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. Cha) (%) (%) PREDEV 0.1348 0.0120 15.50 15.50 0.000 100.0 .030 .010 .0026 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Page 1
Page 36
DEO7731 PRE DEV.out Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag Cmm/h) C mm ) Cmmn/h) C mm ) (mA3/s) Peak mins PREDEV 82.549 12.50 1.500 17.50 0.000 16.994 32.895 0.0572 15.00 0.000 LINK PREDEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.3907E-01 ESTIMATED PEAK FLOW C(CUMECS) = 0.07 ESTIMATED TIME TO PEAK (MINS) = 15.00 FEAR AE AE ETE AE AEE EEE AEE EAE EAE AE EAE AE AE EEE EE AEE EE EEE EA EAE EEE EAE EEE AERA HeHHH Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 HHBRAHHEAAEHAHAR EAE AHHEAHERAHAHABEHAAHAEHAAHHHEHABH HEBER RE HHH ROUTING INCREMENT (MINS) STORM DURATION (MINS) RETURN PERIOD (YRS) BX TOTAL OF FIRST SUB-AREAS (ha) TOTAL OF SECOND SUB-AREAS (ha) TOTAL OF ALL SUB-AREAS (ha) 0.50 25. 5. - 0000 Ho te o°0°0 ROP uMRw SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. Cha) (%) (%) PREDEV 0.1348 0.0120 15.50 15.50 0.000 100.0 .030 .010 .0026 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag (mm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins PREDEV 103.19 12.50 1.500 17.50 0.000 25.247 41.497 0.0748 15.00 0.000 LINK PREDEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.4557€-01 ESTIMATED PEAK FLOW (CUMECS) = 0.08 ESTIMATED TIME TO PEAK (MINS) = 15.00 BBA EH EAH TAHA AAA ATA AA EAE AA AAHAAEHAPHHHH AHHH HeHHE Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 HEEHHHHHEAAHHAHAHAAAAHAAA AREA AREES BEEBE RAR RAE a HHHHH ROUTING INCREMENT (MINS) = 0.50 Page 2
Page 37
DEO7731 PRE DEV.out STORM DURATION (MINS) RETURN PERIOD (YRS) BX TOTAL OF FIRST SUB-AREAS (ha) TOTAL OF SECOND SUB-AREAS (ha) TOTAL OF ALL SUB-AREAS (ha) 25. 10. . 0000 ou dt Hot Woe 0.01 0.15 SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #10 «#2 No. Cha) (%) (%) PREDEV 0.1348 0.0120 15.50 15.50 0.000 100.0 .030 .010 .0026 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag Cmm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins PREDEV 114.19 12.50 1.500 17.50 0.000 29.685 46.081 0.0839 15.00 0.000 LINK PREDEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.5506E-01 ESTIMATED PEAK FLOW (CUMECS) = 0.10 ESTIMATED TIME TO PEAK (MINS) = 15.00 BEHRAAEEEEEAEARAEBARERERAEAAEERAREEEH AEE EERE EEE BALE EDR EAE AER HEE AERA EEE HHEHH Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 HAEREHHABEABAEEREBAEERAEAEAEE TER HABERAEHEERAEEAE EH ABEEAR BAAR AE ADEE EAE AEE AAA #HHEH ROUTING INCREMENT (MINS) = 0.50 STORM DURATION (MINS) = 25. RETURN PERIOD (YRS) = 20. BX = 1.0000 TOTAL OF FIRST SUB-AREAS (ha) = 0.13 TOTAL OF SECOND SUB-AREAS (ha) = 0.01 TOTAL OF ALL SUB-AREAS (ha) = 0.15 SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern 8 Link Label #1 #2 #1 #2 #1 «#2 #1 #2 #10 «#2 No. % (ha) % (%) PREDEV 0.1348 0.0120 15.50 15.50 0.000 100.0 .030 .010 .0026 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag (mm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins PREDEV 130.11 12.50 1.500 17.50 0.000 36.171 52.713 0.0968 15.00 0.000 LINK PREDEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.4872E-01 Page 3
Page 38
DEO7731 PRE DEV.out ESTIMATED PEAK FLOW CCUMECS) = 0.10 ESTIMATED TIME TO PEAK (MINS) = 10.00 FER EH EAA EA AEA ET AEA AEA EEA AEE EA #HHHHH Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 HEAR AE AEE AE AE AE AE EAE EEE A AEE EEE AEA AEE EAE AEE EEA EEA a HHHHE ROUTING INCREMENT (MINS) = 0.50 STORM DURATION (MINS) = 15. RETURN PERIOD (YRS) = 50. Bx = 1.0000 TOTAL OF FIRST SUB-AREAS (ha) = 0.13 TOTAL OF SECOND SUB~AREAS (ha) = 0.01 TOTAL OF ALL SUB-AREAS (ha) = 0.15 SUMMARY OF CATCHMENT AND RAINFALL DATA tink Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. Cha) (%) (%) PREDEV 0.1348 0.0120 15.50 15.50 0.000 100.0 .030 .010 .0026 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time = Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag (mm/h) C mm ) Cmm/h) C mm ) (mA3/s) Peak mins PREDEV 191.29 12.50 1.500 17.50 0.000 31.989 46.322 0.1032 10.00 0.000 LINK PREDEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.5594E-01 ESTIMATED PEAK FLOW CCUMECS) = 0.11 ESTIMATED TIME TO PEAK (MINS) = 10.00 FRA AE AE AE HE AEA AEE EE EEE EAE A EE AEA AEE EEA HeHHH Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 AEE EAE AE AE AEE AAA EEE EEE AEE AAA EE AEE EEE HHHHH ROUTING INCREMENT (MINS) = 0.50 STORM DURATION (MINS) = 45. RETURN PERIOD CYRS) = 100. BX = 1.0000 TOTAL OF FIRST SUB-AREAS (ha) = 0.13 TOTAL OF SECOND SUB-AREAS (ha) = 0.01 TOTAL OF ALL SUB-AREAS (ha) = 0.15 SUMMARY OF CATCHMENT AND RAINFALL DATA Page 4
Page 39
ee a a ee ee ee ee ee ee ee ee ee DEO7731 PRE DEV.out Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. (ha) (%) (%) PREDEV 0.1348 0.0120 15.50 15.50 0.000 100.0 .030 .010 .0026 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time = Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag (mm/h) C mm ) Cmm/h) (mA3/s) Peak mins C mm_) PREDEV 211.27 12.50 1.500 17.50 0.000 36.962 51.317 0.1148 10.00 0.000 Run completed at: 20th December 2007 14:39:17 mik open 0 Page 5
Used in these records
07/2174 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.