07/2174 - Response to Information Request [As Published] · 132007.2174

of 39

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Councifs Reference:

  

Our Reference:
martoo
22™ January 2008 consultinga
pty Itd

 
  
 

Chief Executive O
Noosa Shire Coun
Po Box 141
TEWANTIN Q 4565

 

ATTENTION: PLANNING AND DEVELOPMENT DEPARTMENT - DANIEL SMITH
Dear Sir
RE: APPLICATION FOR DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE OF

PREMISES FOR MULTIPLE HOUSING —- TYPE 2 CONVENTIONAL (5 UNITS) AT 43 TO 45
ELANDA STREET, SUNSHINE BEACH DESCRIBED AS LOTS 399 AND 400 ON RP48112

| refer to the above application and in particular to the request for additional information issued by your
Council and dated 5" December 2007.

This request listed three (3) items that your Council considers is necessary in order to complete its
assessment of the above application. The applicants have decided to respond to these items as below:

item 1: Revised plans that indicate compliance with gross floor area.

Applicant’s Response to Item 1: The applicants building designer has prepared amended plans that
indicate the proposals compliance with gross floor area provisions. In this regard the plans have been
amended with external building dimensions reduced across the entire building and entry doors further
recessed into the building.

Item 2: Submission of a preliminary design showing the profile of the proposed access driveway
giving consideration to the drainage collection of the stormwater at the rear of the property.

Applicant’s Response to Item 2: The applicants engaged Contour Consulting Engineers to prepare a
response to the information request. Drawing 5083-MCU1 specifically addresses the above item and shows
the proposed driveway plan and profile in accordance with Australian standards. Further Contours have
nominated perimeter kerbing and a stormwater catch pit to the driveway and outdoor visitor car park to

minimise potential concentrated stormwater discharge to downstream properties.

item 3: Drainage assessment by a suitably qualified person to demonstrate that there will be no net
increase in run off discharging from the site and no additional stormwater ponding of adverse
impact on adjoining properties.

Applicant’s Response to Item 3: Duke Environmental has prepared a response to item 3 of the
information request. This Stormwater Quality Management Plan addresses the information request and

demonstrates methods to achieve non worsening stormwater discharge effects to downstream properties.

The applicant company considers that it has now responded to Council's request for information. Woutd you
please issue a list of adjoining owners so we can commence public notification of the application? Please
contact our Sunshine Coast office if you require any further information and/or clarification.

SUNSHINE COAST OFFICE

1/199 GYMPIE TERRACE NOOSAVILLE - PO BOX 1684 NOOSA HEADS Q 4567

TELEPHONE 07 54555425 - FACSIMILE 07 54555725
[email protected]

GYMPIE OFFICE
1/28 REEF STREET GYMPIE - PO BOX 391 GYMPIE Q 4570
TELEPHONE 07 54827440 - FACSIMILE 07 54824952

[email protected]

town planners +
urban designers
Full text of the other 38 pages

Page 2

-

@ Page 2

Yours faithfully
a J
ae 4 OAK? ~
Nadine Gorton
Senior Planner
Martoo Consulting Pty Ltd

[Enclosure :12]

[cc:] emait lan Gorton Design
Andrew Duthie

Page 3

 

   

      

 

oy

 

ASO
Pra SO me

 

 

 

 

LEVEL 1 PLAN (SHOWING GFA)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

GROSS FLOOR AREA CALCULATIONS
Gross floor area permitted max pop. density x 40 = 939.52m?
(23.488 x 40)
Gross floor area proposed 938.13m?
Denotes 'Gross Floor Area’
aA Tt 6 saris a Reports o 1s Propet Gient Sede Date raw By
oe Sone we BeBe aE rate Gera mctonionecannreh om Santa Eases 5 APARTMENT DEVELOPMENT OAK INVESTMENT HOLDING P/L 1:200@A3 AUG 2007 IAG lan Gorton
rs ct 1975 & Stancerd Busing F 1960 (as amended)

Quesnstand "4567 \aty a rororsan ae wcrweresetay wc Tene OWS a a= sale we roar teh pla a
ETN GST [Se eae eee 43- 45 ELANDA STREET SUNSHINE BEACH TOWN PLANNING CALCS - GFA 0710SD.09 B

Page 4

*

 

 

STORMWATER QUANTITY
MANAGEMENT PLAN

*

Duke

 

 

PROPOSED APARTMENT
DEVELOPMENT AT
LOT 399 & 400 ON RP48112
ELANDA ST, SUNSHINE BEACH

For

OAK INVESTMENT HOLDINGS PTY LTD

AA07731SMP
January 2008

ATijs

[email protected]
PO Box 78 Wurtutla 4575

07 5493 3322
07 5493 3422

P,
F
E

*

AVIFONS

 

—
—_

ental

N)

Environmental Management Consultants

——

T/A Duke Environmental

Powerful Owl Qld Pty Ltd
ABN 53 111 348 944

Page 5

P 07 5493 3322
F 07 5493 3422
E [email protected]
PO Box 78 Wurtulla 4575

Powerful Owl Qld Pty Ltd
T/A Duke Environmental
ABN 53111 369 946

*

Duke
Environmental

Environmental Management Consultants

 

 

 

 

 

 

 

 

Document Control
Parenthood Authorised for Issue
Date Author Reviewer Name Document Status
08/01/08 Alister Trendell | Brett Thomson | Paula Duke A
A - Approval B - Building Approval C- Construction
T—For Tender | X- Information R — Revision

 

 

 

 

 

The content of this document is provided in strict commercial confidence. The content of
this document shall not be disclosed to any third party, without the express written
authority of Duke Environmental. Copyright © Duke Environmental 2008.

 

AA07731SMP
January 2008

ATijs

Page 6

 

  
  

 

   

 

-3-

1.0 INTRODUCTION 5
1.1 Preamble wed
1.2 Site Location. 5
1.3 Description of the Proposal 5
1.4 Site Characteristics.............. ed
1.5 Site Constraints & Opportunities wed
1.6 Flooding 6

2.0 RAINWATER REUSE... ccc cee creeeeeceeeneeeeerenesevnenesetsesesseceasnsusveveneaenateeeetenasaeaenee 6

B.0 HYDROLOGY... ccc cccceresctecseneesseeceseeseseeseesseeseeseceseseecessenesseseeeeseseseesesteneseseaeae 6
3.1 Methodology 16
3.2 Mitigation Infrastructure Details... 7
3.3 Discussion of Results 8

4.0 CONCLUSIONS / RECOMMENDATIONS .....00...0.. ccc eceneersesenseeeseestsessnenasneeereeeereees 8

5.0 LIMITATIONS OF THIS STUDY o.oo... eee cceeeceseceteteeeececeececeereeeeteeneseeseseeeecesteetseeea 8

6.0 CLOSURE 0.0... ccc cccccccccccscscscssssnecscscesesesesesecaesscaesenaeeesausessesecaesecseecnesesneneteesesseseseetesetaeeea 9

7.0 REFERENCES ooo... ccccceccnesececeeecreeeeeneneneesesnenenenieagienseeeesasaecieiseeeesenineeatientinensanens 10

AA07731SMP

January 2008

ATs

Page 7

APPENDIX A

APPENDIX B

-4-

APPENDICES

FIGURES AND DIAGRAMS

Figure 1.0 — Locality

Figure 2.0 — Aerial

Duke Environmental Drawing No. DE07731/01

Duke Environmental Drawing No. DE07731/02

lan Gorton Design Drawing No. 0710SD.06

Noosa Council Natural Hazard: Landslide and Flood Overlay

HYDROLOGIC CALCULATIONS

 

4A07731SMP
January 2008
ATijs

Page 8

 

- 5 -

1.0 INTRODUCTION
1.1 Preamble
Duke Environmental have been commissioned by Oak Investment Holdings Pty
Ltd (via Contour Consulting Engineers) to undertake this Stormwater
Management Plan.
This report has been compiled generally in accordance with Noosa Shire
Councils (NSC) Policy 5 - Engineering Design Standards Roads, Drainage and
Earthworks (Section 4. Design and Approval — Drainage), and addresses Item 3
of Noosa Shire Council Information Request (Ref: 2007/2174), dated 5
December 2007. This report details proposed stormwater quantity management
strategies to be incorporated into the construction and operation phases of the
proposed development.
1.2 Site Location
The subject site is located at 43-45 Elanda Street, Sunshine Beach, and is
described as Lots 399 & 400 on RP 48112. The site has an area of
approximately 0.15 ha.
Refer Figure 1.0 in Appendix A for Site Locality Plan and Figure 2.0 in Appendix
A for Aerial Photograph.
1.3 Description of the Proposal
The applicant proposes to construct a development comprising of five (5)
apartments, with associated driveways, swimming pools and car parking areas.
Additionally, the development will contain a detention basin to aid in the provision
of non-worsening of stormwater flows. Refer lan Gorton Design Drawing
0710SD.06 included in Appendix A.
1.4 Site Characteristics
The site is accessed from Elanda Street and consists of two (2) lots. One (1) lot
has a residential dwelling which is accessed by an unsealed driveway.
Existing vegetation on the subject site is generally comprised of scattered trees
and grassy areas.
The topography of the site is mapped as steeply sloping generally from the
southern boundary towards the north of the site.
Refer Figure 2.0 - Aerial Photograph included in Appendix A.
1.5 Site Constraints & Opportunities
Opportunity is provided to locate a Detention Basin within the site to treat
stormwater runoff. Further, a closed tank system for every apartment is
proposed to collect rainwater runoff from the roof areas. Roof rainwater runoff will
be re-used to supply toilet flushing and landscape irigation. Runoff from
carpark/driveway areas and overflow from rain water tanks will enter the
Detention Basin before being released from the site. These are considered

AA07731SMP

January 2008

ATijs

Page 9

-6-
effective measures to mitigate potential increases in flow tevels from the
development.

Refer Drawing DE07731/02 included in Appendix A for further details.

1.6 Flooding

With reference to Noosa Council Natural Hazard: Landslide and Flooding
Overlay Map (OM4.3), the subject site is not within the Q100 Flood Prone Area.

Refer Appendix A for extract from overlay map.

2.0 RAINWATER REUSE

With reference to Noosa Council Designated Rainwater Tank Area Map, the subject site
is within an area that requires rainwater tanks. Schedule 8 of the Noosa Planning
Scheme requires a minimum storage capacity of 3000 litres per dwelling unit. In addition,
water from the rainwater tanks is to be used for:

a) Flushing of toilets internal to the building;

b) Extemal irrigation, topping up of swimming pools or water features and outside
cleaning.

All rainwater tanks are to be designed and installed as per the Queensland Development
Code (QDC), Part 25 — Rainwater Tanks.

Refer Duke Environmental Drawing DEO7731/02 in Appendix A for proposed location of
rainwater tanks.

3.0 HYDROLOGY

3.1 Methodology

It is proposed to mitigate the effects of the proposed development on stormwater
discharge rate by way of incorporating a Detention Basin.

This system is proposed to capture runoff from the site to maintain design
discharges up to, and including, the 100 year ARI event, from pre to post
development scenarios (non-worsening). Refer to Drawing DEO7731/02 included
in Appendix A for details.

Three different hydrological cases were investigated for the purpose of this study:

Case 1: Pre-Development site (existing)
Case 2: Post-Development of site (without mitigation)
Case 3: Post Development with mitigation strategies implemented

(Detention Basin)

The XP-RAFTS Run-off Routing Software was used for hydrological analysis of
the pre and post development catchments. Table 4.1 summarises adopted
discharge rates for the design critical storm duration, and the corresponding
rational method discharge. Refer Appendix B for internal site hydrologic
calculations and variables.

 

AA07731SMP
January 2008
ATijs

Page 10

-7-
The Rational Method was used to check adopted discharge rates. Parameters
adopted were generally based on recommendations in Australian Rainfall &
Runoff (iEAust 1997), and the Queensland Urban Drainage Manual (1994).

The pre and post development catchments for the development site outlined in
Drawing DE07731/01 in Appendix A. Detailed hydrologic calculations for the
intemal pre and post catchment, listing ail variables adopted, have been included
in Appendix B.

Results indicating the effectiveness of the proposed mitigation methods for the

ARI storms investigated are detailed in Table 3.1 below.

Table 3.1

Model Results

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ARI Site Catchment Discharge (m*/sec) Detention
Storm CASE 1 Pre-Development CASE 2 CASE 3 System
Details Post- Post-Dev | Water Depth

Development | with Basin (m)

XP-RAFTS Rational XP-RAFTS | XP-RAFTS
Method

2 year 0.057 0.035 0.084 0.057 0.29
5 year 0.075 0.049 0.080 0.069 0.39
10 year 0.084 0.057 0.089 0.080 0.44
20 year 0.097 0.068 0.101 0.097 0.48
50 year 0.103 0.086 0.108 0.102 0.49
100 year 0.115 0.100 0.120 0.114 0.51

 

 

Site specific intemal catchment mitigation infrastructure used to model discharges
from the site is summarised below. Refer to Drawings DEO7731/02 in Appendix A
for details.

3.2 Mitigation Infrastructure Details

Details of the detention basin used to model discharges from the site is
summarised below.

Adopted Basin parameters are:

e Low level pipe outlet: 0.0m (assumed detention)

e Low level pipe outlet type: RCP

e Low level pipe outlet specification: 1x225mm diameter

e Weir height: 0.4m (above assumed detention)

e Weir width: 0.6m

e Depth over weir (Q1o0): 0.11m

* Total storage volume required: 11.3m?

e Detention depth in basin (Q100): 0.51m (above assumed detention)

Refer to Drawing DE07731/02 in Appendix A for details. Refer Appendix B for
RAFTS output results.

 

AA07731SMP
January 2008
ATs

Page 11

3.3 Discussion of Results

With reference to the results detailed in Table 2.1, it can be seen that the proposed
mitigation system (“Case 3”) provides effective non-worsening of discharges in
comparison to the pre-development case (“Case 1”).

This is achieved by the inclusion of Detention Basin storage. It is to be noted that
the above analysis is considered to provide conservative results for the following
reasons:

« The effects of roof water collection systems proposed to be installed at the
site have been ignored.

40 CONCLUSIONS / RECOMMENDATIONS

We consider that the above accurately, and conservatively, models the stormwater
runoff characteristics of the subject catchment. Catchment areas, and _ individual
components of the proposed water quantity treatment systems, are detailed above.

We consider that this report demonstrates no net increase in stormwater run-off
discharging from the site in comparison to the pre development case.

5.0 LIMITATIONS OF THIS STUDY

This study has been tailored to investigate issues in the context of the proposal, and at
the area of interest, being Lots 399 & 400 Elanda Street, Sunshine Beach.

Individual sub-catchments situated above, and below the area of interest, may have
different hydrological / hydraulic influences. Hence, the information contained in this
report is not to be used outside of the subject area.

We consider that the study accurately reflects the conditions for the area of interest, at
the time the study was undertaken. The results of this study should be reviewed if
catchment / proposal conditions change in the future. Where applicable, and due to their
latent nature, subsurface conditions and/or water quality monitoring results may vary
significantly across the site and/or temporally in comparison to those described herein.

Notwithstanding the above, this report has been undertaken for the specific purposes of
Oak Investment Holdings Pty Ltd (via Contour Consulting Engineers), as detailed in our
correspondence to them, and is solely for the use of Oak Investment Holdings Pty Ltd
(via Contour Consulting Engineers Pty Ltd).

This report is only to be used in full, and may not be used to support objectives other
than those set out herein, except where written approval, with comments, are provided
by Duke Environmental.

Duke Environmental accept no responsibility for the accuracy of information supplied to
them by second and third parties.

 

4A07731SMP
January 2008
ATjs

Page 12

6.0 CLOSURE
This report has been undertaken in general accordance with the Queensland Urban

Drainage Manual, other industry standard guidelines, and under the direction of a
Registered Professional Engineer of Queensland.

Should further information be required please contact:

Yours faithfully

Alister Trendell g/Paula Duke

BE Hons MEngSc BAppSc(Chem) PGDipEd CEnvP MEIANZ
Environmental Engineer Principal Environmental Scientist

For Duke Environmental For Duke Environmental

PO Box 78

Wurtulla QLD 4575
P: 07 5493 3322
F: 07 5493 3422

 

AA07731SMP
January 2008
ATfs

Page 13

-10-

7.0 REFERENCES

Department of Natural Resources & Mines 2005, Planning Guidelines for
Water Supply & Sewerage Chapter 5 - Demand / Flow and Projections.

 

2. Engineers Australia 2006, Australian Runoff Quality, A Guide to Water
Sensitive Urban Design.
3. Engineers Australia 2006, Australian Runoff Quality, A Guide to Water
Sensitive Urban Design.
4. Main Roads Department — Urban Drainage Manual — Volume 2.
5. Neville Jones & Associates & Australian Water Engineering, Queensland
Urban Drainage Manual Volume 1 — Text (1994).
6. Noosa Shire Council - Planning Scheme.
AAO7731SMP
January 2008
ATs

Page 14

 

 

APPENDIX

A

 

FIGURES & DIAGRAMS

 

731
January 2008

 

Page 15

    

SUNSHINE

     

  
  

\ SO 7S 9
mY ce
s\ \ Es
2 x OO
5 Cn
B85 JINI5)
38:

National

Ru

Unio:

Club)
|

Park

 
 

GIRRAWEE

CT

S
EN) / BE®

   
     
     

ational \

h

DUKE ENVIRONMENTAL

DE 07731

LOCALITY - FIGURE 1.0

SITE =%

Page 16

DE 07731

AERIAL - FIGURE 2.0

a
_
Zz
Lu
=
Zz
O
oe
=>
=z
Lu
Lu
x<
=
Q

 

Page 17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ELANDA STREET ELANDA STREET
a -
\
|
TOTAL } TOTAL
CATCHMENT 2 7 CATCHMENT
AREA 1468m? AREA 1468m’
1 — — ee r ae — +
1 —_
| EXISTING \ i |
DWELLING :
| Nie |
5) | 0
| |  omeecpemed at Tee es ; |
\
\ | !
| iPERvious - | | i Lay
SX 420m? 1 |
50 = l i |
i
L i
--------------- 1 po--------4-----+4
A | | eee | |
1
| ii
| { IMPERVIOUS AREA |
4 | | 1035m’
ee ee
| aa! I f
APPROXIMATE i
DIRECTION OF | | it
fad STORMWATER i
FLOW !
l !
il
malt
| | MS US ee oe re al
I i
=e t =
| aol I eg
| _ | te
°
A
; , | 3
~ = YI APPROXIMATE
h ran 2) ~ DIRECTION OF |
| 4 ° Ke ~ STORMWATER
p | = “ FLOW
| AA > Ad
44 |
{oo ee | | = -
— — —_ a = = — nee — |
aaa face eS APPROVED DOCUMENT STATUS mc . cuen CONTOUR CONSULTING ENGINEERS
Deen FOR APPROVAL E pRoys-’ PROPOSED APARTMENT DEVELOPMENT
pate (Not for Construction) PO 2 ig 43 - 45 ELANDA STREET can ae
Checke BAT Survey By; Definumn SUNSHINE BEACH DRAWING No
jecked Daum AHO | sie AS UKE ENVIRONMENTA tre | CATCHMENT PLAN DE07731/01

 

 

 

 

 

Page 18

a NOT FOR CONSTRUCTION me

 

 

Ae APPROXIMATE EXTENT
OF ROOF AREA

> } 2 : ¢ : 3 ‘Z
Q ' é € , APPROXIMATE EXTENT OF

UNCOVERED ENTERTAINING
AREA

 

 

 

 

 

 

 

 

 

STORMWATER INLET PIT

aay

 

GRADED TO ENSURE
RUNOFF TO
STORMWATER PITS

 

yO

 

 

 

 

 

 

UNDERGROUND CAR PARKING

 

UNDERGROUND CAR PARKING

ELANDA STREET
sence el

__— LEVEL SPREADER

NOTE:

1. PROPOSED STORMWATER INFRASTRUCTURE
SHOWN IS INDICATIVE ONLY AND IS SUBJECT
TO CHANGE AT DETAILED DESIGN PHASE.

2 HYDRAULIC DESIGN OF STORMWATER
INFRASTRUCTURE BY PROJECT CONSULTING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ENGINEER.
INLET PIT DRAINAGE UNE ~ ROOF AREA OVERFLOW FROM
ma Hessehidla 50001 RAINWATER ae Tani VOLUME 1
RAINWATER TANKS TANKS (OR EQUIVALENT) (APPROX. AREA Som")
0.5m
OVERFLOW WEIR
Q100 FLOOD LEVEL TO LEVEL SPREADER
el — ee eee
3 | Ss LEVEL SPREADER
a ms ye | & .
INLETS FROM RAINWATER 7 7 =
Reames eer ozevoobteve , cpa sca :
= GRAVEL eas
BIO-RETENTION BASIN
>| Dat =
- = Design AT DOCUMENT STATUS *§ = cuens _CONTOUR CONSULTING ENGINEERS

Orawn M.B. FOR APPROVAL 5 prRoje>? PROPOSED APARTMENT DEVELOPMENT

Date 07-01-08 (Not for Construction) * xe 43-45 ELANDA STREET Sheet 2 of 2

Checked: BAT. ey / SUNSHINE BEACH DRAWING No

i SS | en | eee ee fp dau ano [sz AS pf xx $ ouan is Commany enorecren sy Ouxé envinonwenrat || Tru, _ STORMWATER MANAGEMENT PLAN DE07731/02

 

 

 

 

 

 

 

 

 

 

 

Page 19

sectlon of pop up rool cokorbond metal roof

           

         

ce

‘uminium sun contol awrings
t
is

   

 
    

feature enbry doors

WEST ELEVATION...{from Elanda Street)

expressed grooves to rendered block

batien Keatment to bil shat = powdercoated aluminium framed windows,

   

 

 

 

 

Ae

glass balusvade

 

 

 

 

 

 

 

 

EAST ELEVATION...
dass baksstedng
tendered block planters
SOUTH ELEVATION...
rendered block walts
powdercoated aluminium windows ‘Sompressed FC awnings batten screening to iit ehaft
rendered block walls ‘colorbond roafing
'
\
1
|
‘
conc. the pool
fading screen baesvede
NORTH ELEVATION...
‘ i CONSULTANTS Prokact _ Ghent Seas Osis Drawn By , a,
Soe sunsine geaci reeo Catattpeargy ei alent Sainte neasio® hate a | Santee 5 APARTMENT DEVELOPMENT OAK INVESTMENT HOLDING P/L 4:200@A3 AUG 2007 AG ENGEREN
1, zs & the: , —_——$$—_—_—_ a — "= : beg *
QuesAElans 4587 (hij al creratnsan opto cence ta yo ee an cages ae of DYShS} i. Nn
Fr S400 2 3 Se cmau | piambiauet trea Copter en deer tara aS-ASELANDA STREET SUNSHINE BEACH ~FLEVATIONssweeTt = O740SD.06 =) LE

 

 

 

 

Page 20

Noosa Council
Eastern Beaches Natural Hazard:

Landslide & Flooding Overla

Map OM4.3

25p
. REE

Eastern Beaches North

Inset Scale 1cm = 220m

 

,
VERS

>

Seer

Siri fs NN

SS
ROSS
PEN

 

  

 

ES
\

SS

Natural Hazard: Landslide &

Eastern Beaches
Flooding Overlay

 

 

ra!

Zz x
3S $

ao 2
oovwe

Zse

Z2£as

n S
ses
32°

Zzas
=
1

1

3 3

psPzEe

£sts

eSRke
3038

2ee2
|

=

Oy

=

Q

=

=

 

Streams, Rivers and

Drainage Lines

Inset

Landslide

Hazard Area
Extent of

a

td

 

Flood Mapping
Flood Hazard Area

 

 

 

 

t Subject Site

Page 1 of 1

AA07731SMP

 

January 2008

ATijs

Page 21

 

APPENDIX

B

 

 

 

HYDROLOGIC
CALCULATIONS

 

731
January 2008

Page 22

‘DUKE ENVIRONMENTAL

DESIGN UTATIONS

PRINCIPAL: “CONTOUR CONSULTING ENGINEERS
JOB: "BLANDA STREET, SUNSHINE BEACH
JOB No.: Deo7731

BY: AT

TIME OF CONCENTRATION CALCULATIONS :

PRE DEVELOPMENT

 

 

 

 

 

 

 

T=(107nLA0.333)/S°O.2

 

Time of concentration (min) 10.24

Total Distance 50.00]
Length in Gradient % [Time (Minutes)

‘Sheet Flow 50 9.045 15.5) 10.24

 

Copy of 0E07731 - Time of concentration calculations.x1s
7101/2008
14:02 AM

 

Page 23

DUKE ENVIRONMENTAL _

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DESIGN COMPUTATIONS
PRINCIPAL: CONTOUR CONSULTING ENGINEERS
JOB; ELANDA STREET, SUNSHINE BEACH
408 No.: DEO7731
BY: aT
NY He ROI RMINATION F I
ARL EBACT, [MP INTENSITY RUNOFF ADOPTED RUNOFF COMMENTS
tyeare) (6. QUDM GOFF (110) COEFF (C19) COEFF
q ¢S0mip. 210) TABLE 5.04.2 TAGLE 5.04.3
SUB-CATCH TYPE 1| SUB-CATCH TYPE 1 | SUB-CATCH TYPE 1|_SUB-CATCH TYPE 4 | SUB-CATCH TYPE 1|
028 oa 2 0.82 0.82
4 08 2 0.82 0.95
2 oo n 0.82 0.70 URBANSED
& o8 re 0.82 0.78 CATCHMENT
1g 08 2 082 0.82
2a 08 m2 0.82 0.86
50 06 n 0.82 0.04
100 26 2 0.82 0.99
ARI FRACT [MP INTENSITY BUN-OFF AROPTEO RUN-OFE COMMENTS:
Groara) (GLOupM COEFE 1110) GOEFF (ctoy COEFF
TABLE 5.04.1 TABLE 5.04.2 TABLE £.04,3
IB-CATCH TYPE 2| SUB-CATCH TYPE 2 | SUB-CATCH TYPE 2| SUB-CATCH TYPE 2 | SUB-CATCH TYPE 2
28 0.0 72 0? 0.83
1 oo R 07 0.5¢
2 00 7 a7 9,80 RURAL
& 0.0 R or 0.07 CATCHMENT
19 ao a O7 0.70
zo 00 is 07 074
ao 0.0 nm 07 om
100 0.0. 72 7 0.84
ARI EBACT IMP IWDENSIrY RUNOFF ADOPTED RUN-OFF COMMENTS:
(wears) {f. QUDM CORFE (HNO) COEFF (C101 COEFF
TARLE 5.04.1 (60min, 010) TABLE 5.04.2 TABLE 5.04.3
UB-CATCH TYPE 3| SUB-CATCH TYPE3 | SUB-CATCH TYPE 3| SUB-CATCH TYPE 3 | SUB-CATCH TYPE 3
225 02 72 om 0.53
L 02 2 ov” 0.87
2 oz 72 a7 RURAL RESIDENTIAL
a 02 m%@ 07 CATCHMENT
10 02 re ars
29 02 72 on
6Q 02 a O71
100 02 72 ont
AB) FRACTIMP INTENSITY ‘BUN-OFF ADOPTED RUNOFE COMMENTS
(yeara) dhauom COEFF (110) GOBFE C10) GOEFF
TABLE 6.04.3
SUB-CATCH TYPE 4| SUB-CATCH TYPE 4 | SUB-CATCH TYPE 4/ SYB-CATCH TYPE 4 | SU8-CATCH TYPE 4
2.25 10 7 09 0.68
1 10 2 oa ore
2 10 72 09 O77 COMMERCIAL
8 10 nm 09 0.86
1 1.0 2 9 0.00
za 10 72 09 095
sa 10 7 09 1.00
190 10 72 29 4.00
‘AR! | LOCFOR SUB-CATCH1|  NEXTSUB-CATCH NEXT SUB-CATCH TOTAL INTENSITY FOR TOG
(years)! (OVERLAND FLOW} (CHANNEL FLOW) nin) roc {oumibr}
nin} cu) ° (miny ?
2 2
‘225 74.0 ae ae
1 149 00 00 14.0 97.0
2 140 0.0 oo wo 123.8
5 14.0 0.0 0.0 40 153.6
10 140 oo 90 140 170.3
29 140 00 90 140 193.3
50 140 0.0 00 14.0 223.6
102 140 0.0 0.0 140 240.8,
AR} AREA AREA AREA AREA ADOPTED ELOW
(years) ae OF. QF QE r (mdisec)
5 A QUB-CATCH TYPE 2 SUB-CATCH TYPE 3 ‘SUB.CATCH TYPE 4
sha) hay ba. {hal
25 0.147 9.00 0.00 0.00 0.012.
1 0.147 0.00 0.00 0.00 0.026
2 0.147 0.00 0.00 0.00 0.035
8 ona? 0.00 aan 0.00 0.049
1g 0447 0.00 0.00 9,00 0.057 \
20 ona 0.00 9.00 4.00 0.068
50. 0.147 0.00 0.00 0.00 0.986
13 0.147 0.00 2.00 0.00 Q.099
Cachinent SUBCATCH TYPE ‘SUB-CATCH TYPE SUB-CATCH TPES ‘SUB-CATCH TYPE 4 Total
ces 008s
ness ° ° e oss

‘Copy of GEO7731 Rabonal Mend - SMP Flow Cab se
TO1T008
1102 ata

0

125
158
m
08

20

mT

“9
108
188
ae

* 9.2

9704

1238
163 68
170,38
193.92
223,84
208,34

PRE DEV

Page 24

DEO7731 POST DEV MIT.out
Run started at: 2ist December 2007 9:00:59

BARA AEE AEA TE TETRA EAE AEE TE AEE EEA EA EAE EA AEA EAE AE EE EEE EE EEE AE AEE EAE EAE EEE AE EE
HHeHE

RUNTIME RESULTS
ARAB AEE AEE AP AEA TEA AEE AE AE AR AE EAE EE EEA EAE AEA A AE EAE AE EE EE EE EEE ER
RHHH

Max. no. of links allowed = 2000
Max. no. of routng increments allowed = 25000
Max. no. of rating curve points = 25000

Max. no. of storm temporal points = 25000

Max. no. of channel subreaches = 25

Max link stack level = 25

Input Version number = 650

LINK POST DEV 1.000

ESTIMATED VOLUME (CU METRES*10**3) = 0.4141E-01
ESTIMATED PEAK FLOW (CUMECS) = 0.06
ESTIMATED TIME TO PEAK (MINS) = 14.50

HEA HH ET EE EEE AE AE EAE AEH AEA AEA AHA EEE EER EAHA ABA EAA EEE HARE
HeHHH
Elanda Street, Sunshine Beach

Results for period from 0: 0.0 1/ 1/1990

to 12: 0.0 2/ 1/1990
HHHHAHHARBER AAA AHEE HATHA EAR ERAAHEAAHA AHA AARHA EA AHEHHAEH AEH ER EPH R EER
#ettt

ROUTING INCREMENT (MINS) = 0.50
STORM DURATION (MINS) = 25.
RETURN PERIOD (YRS) = 2.
BX = 1.0000
TOTAL OF FIRST SUB-AREAS (ha) = 0.04
TOTAL OF SECOND SUB-AREAS (ha) = 0.10
TOTAL OF ALL SUB-AREAS (ha) = 0.15
SUMMARY OF CATCHMENT AND RAINFALL DATA
Link Catch. Area Slope % Impervious Pern B Link
Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No.

(ha) (%) (%)
POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link
Page 1

Page 25

DEO7731 POST DEV MIT.out
Label Intensity #1 #2 #1 #2 a #2 Inflow to Lag
Cmm/h) C mm ) (mm/h) mm ) (mA3/s) Peak mins
POST DEV 82.549 12.50 1.500 17.50 0.000 16. So 32.895 0.0635 14.50 0.000

SUMMARY OF BASIN RESULTS

Link Time Peak Time Peak Total = --------- Basin ---------
Label to Inflow to outflow Inflow Vol. vol. Stage
Peak (mA3/s)} Peak (mA3/s) (mA3) Avail Used used

POST DEV 14.50 .0635 15.00 0574 41.411 0.0000 3.8851 0.2926

SUMMARY OF BASIN OUTLET RESULTS

Link No. s/D Dia width Pipe Pipe
Label of Factor Length Slope
(m) (m) (m) (m) (%)
POST DEV 1.0 +2250 0.000 5.000 3.000
LINK POST DEV 1.000
ESTIMATED VOLUME (CU METRES*10**3) = 0.5388E-01
ESTIMATED PEAK FLOW (CUMECS) = 0.08
ESTIMATED TIME TO PEAK (MINS) = 15.00

Fete ag TERE EEE TEER EEE EEA EER EEA EEE EEE EE
HH
Elanda Street, Sunshine Beach

Results for period from 0: 0.0 1/ 1/1990

to 12: 0.0 2/ 1/1990
EAE EAE AEE EAE AEE EA EE EEE AE EES
HHHHH

ROUTING INCREMENT (MINS)
STORM DURATION (MINS)
RETURN PERIOD (YRS)

Bx

TOTAL OF FIRST SUB-AREAS (ha)
TOTAL OF SECOND SUB-AREAS (ha)
TOTAL OF ALL SUB-AREAS (ha)

bru
N-
“

SUMMARY OF CATCHMENT AND RAINFALL DATA
Link Catch. Area Slope % Impervious Pern B Link
Label #1 #2 #1 #2 #1 #2 #1 #2 #1 «#2 No.
cha) (%) (%)
POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link
Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag
(mm/h) C mm ) (mm/h) C mm) (mA3/s) Peak mins

POST DEV 103.19 12.50 1.500 17.50 0.000 25. 247" 41.497 0.0799 15.00 0.000

SUMMARY OF BASIN RESULTS

Link Time Peak Time Peak Total --------- Basin ~--------

Page 26

DEO7731 POST DEV MIT.out
Label to Inflow to outflow Inflow vol. vol. Stage
Peak (mA3/s) Peak (mA3/s) (mA3) Avail used Used
POST DEV 15.00 .0799 15.00 .0693 53.879 0.0000 6.6569 0.3926

SUMMARY OF BASIN OUTLET RESULTS

Link No. s/D Dia width Pipe Pipe
Label of Factor Length Slope
(m) (m) (m) (m) (%)
POST DEV 1.0 .2250 0.000 5.000 3.000
LINK POST DEV 1.000
ESTIMATED VOLUME (CU METRES*10**3) = 0.6053E-01
ESTIMATED PEAK FLOW (CUMECS) = 0.09
ESTIMATED TIME TO PEAK (MINS) = 15.00

HAE AE AE AEE AE AEE AEA A AEH A AEE ABER EAE AE AEE AEA AE EE EE EE EAE EEE AE AEE EAE AE A EE EEE
HHEHH

Elanda Street, Sunshine Beach

Results for period from 0: 0.0 1/ 1/1990

to 12: 0.0 2/ 1/1990
HHHHHHEAAHHHA AAA AHAAHHEE HARARE AA HEH AAHHAAAH HHH HAHAHA RBH BER HAR RARER RR
HHHHH

ROUTING INCREMENT (MINS) = 0.50
STORM DURATION (MINS) = 25.
RETURN PERIOD (YRS) = 10.
BX = 1.0000
TOTAL OF FIRST SUB-AREAS (ha) = 0.04
TOTAL OF SECOND SUB-AREAS (ha) = 0.10
TOTAL OF ALL SUB-AREAS (ha) = 0.15
SUMMARY OF CATCHMENT AND RAINFALL DATA
Link catch. Area Slope % Impervious Pern B Link
Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No.

(ha) (%) %)
POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link
Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag
(mm/h) C mm +) (mm/h) C mm ) (mA3/s) Peak mins

PosT DEV 114.19 12.50 1.500 17.50 0.000 29. 685 "46. 081 0.0887 15.00 0.000

SUMMARY OF BASIN RESULTS

Link Time Peak Time Peak Total = --------- Basin ---------
Label to Inflow to outflow Inflow vol. vol. Stage
Peak (mA3/s)} Peak (mA3/s) (mA3) Avail used Used

POST DEV 15.00 .0887 15.00 - 0800 60.527 0.0000 8.1551 0.4368

SUMMARY OF BASIN OUTLET RESULTS

Link No. s/D Dia width Pipe Pipe
Label of Factor Length Slope
Page 3

Page 27

DEO7731 POST DEV MIT. out

(m) (m) (m) (m) (%)
POST DEV 1.0 -2250 0.000 5.000 3.000
LINK POST DEV 1.000
ESTIMATED VOLUME (CU METRES*10**3) = 0.7023E-01
ESTIMATED PEAK FLOW CCUMECS) = 0.10
ESTIMATED TIME TO PEAK (MINS) = 15.00

TEE AEE EA AEE EA a AAA a
HHHEH
Elanda Street, Sunshine Beach

Results for period from 0: 0.0 1/ 1/1990

to 12: 0.0 2/ 1/1990
HEAR A AA AA AA AER EAE TEE AAAS EEA
HeHHH

ROUTING INCREMENT (MINS) = 0.50
STORM DURATION (MINS) = 25.
RETURN PERIOD (YRS) = 20.
Bx = 1.0000
TOTAL OF FIRST SUB-AREAS (ha) = 0.04
TOTAL OF SECOND SUB-AREAS (ha) = 0.10
TOTAL OF ALi SUB-AREAS (ha) = 0.15
SUMMARY OF CATCHMENT AND RAINFALL DATA
Link Catch. Area Slope % Impervious Pern B Link
Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No.

Cha) : (%) (%)
POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link
Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag
(mm/h) C mm ) Cmm/h) C mm ) (mA3/s) Peak mins

POST DEV 130.11 12.50 1.500 17.50 0.000 36.171 52.713 0.1014 15.00 0.000

SUMMARY OF BASIN RESULTS

Link Time Peak Time Peak Total = --------- Basin -~--------
Label to Inflow to outflow Inflow vol. Vol. Stage
Peak (mA3/s) Peak (mA3/s) (mA3) Avail Used Used

POST DEV 15.00 .1014 15.00 - 0967 70.225 0.0000 9.7043 0.4782

SUMMARY OF BASIN OUTLET RESULTS

Link No. s/D Dia width Pipe Pipe
Label of Factor Length Slope
(m) (m) (m) (m) (%)
POST DEV 1.0 -2250 0.000 5.000 3.000
LINK POST DEV 1.000
ESTIMATED VOLUME (CU METRES*10**3) = 0.8288E-01
ESTIMATED PEAK FLOW (CUMECS) = 0.11
Page 4

Page 28

DEO7731 POST DEV MIT.out
ESTIMATED TIME TO PEAK (MINS) = 15.00

BREA AA AE EERE AEE EEE EEA ERA AA EAA AEE EE HEE AAA EEE EEE EAE EEE EA
HHAHH

Elanda Street, Sunshine Beach

Results for period from 0: 0.0 1/ 1/1990

to 12: 0.0 2/ 1/1990
HHHAHHAHHHHHAHAHAEAAAEAEHHAAAAAAHARAAEEE A AAAAARAAAAAAAaHARAAARAAAAEAAE EERE EAE
HHHeHt

ROUTING INCREMENT (MINS) = 0.50
STORM DURATION (MINS) = 25.
RETURN PERIOD (YRS) = 50.
BX = 1.0000
TOTAL OF FIRST SUB-AREAS (ha) = 0.04
TOTAL OF SECOND SUB-AREAS (ha) = 0.10
TOTAL OF ALL SUB-AREAS (ha) = 0.15
SUMMARY OF CATCHMENT AND RAINFALL DATA
Link Catch. Area Slope % Impervious Pern B Link
Label #1 #2 #1 #2 #1 «#2 #1 #2 #1 «#2 No.

Cha) %) (%)
POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link
Label Intensity #1 #2 #1 #2 * #2 Inflow to Lag
(mm/h) C mm ) (mm/h) m ) (mA3/s) Peak mins

POST DEV 150.99 12.50 1.500 17.50 0.000 44. sai "64. 415 0.1057 15.00 0.000

SUMMARY OF BASIN RESULTS

Link Time Peak Time Peak Total = --------- Basin ---------
Label to Inflow to outflow Inflow vol. vol. stage
Peak (mA3/s) Peak (mA3/s) = (m3) Avail Used Used

POST DEV 15.00 .1057 15.00 -1021 82.884 0.0000 10.200 0.4897

SUMMARY OF BASIN OUTLET RESULTS

Link No. s/D Dia width Pipe Pipe
Label of Factor Length Slope
(m) (m) (m) (m) (%)
POST DEV 1.0 .2250 0.000 5.000 3.000
LINK POST DEV 1.000
ESTIMATED VOLUME (CU METRES*10**3) = 0.9263E-01
ESTIMATED PEAK FLOW (CUMECS) = 0.12
ESTIMATED TIME TO PEAK (MINS) = 14.00

HEAHHAEAHERAAAHAAEERAAR AAA RAEAGA HABA EB BEEA BABA AEEAAA EH ARATE ABA EAAAEH PRA EH AD HAE
HAEHH

Elanda Street, Sunshine Beach

Page 5

Page 29

DEO7731 POST DEV MIT.out
Results for period from 0: 0.0 1/ 1/1990
to 12: 0.0 2/ 1/1990

AEE EEE AEE EEE EEE EE

HAEHH

ROUTING INCREMENT (MINS)
STORM DURATION (MINS)
RETURN PERIOD (YRS)

BX

TOTAL OF FIRST SUB-AREAS (ha)
TOTAL OF SECOND SUB-AREAS (ha)
TOTAL OF ALL SUB-AREAS (ha)

kona

b

uot al

SUMMARY OF CATCHMENT AND RAINFALL DATA

Link Catch. Area Slope % Impervious Pern
Label th ) #2 #1 #2 #1 #2 #1 #2
a

POST DEV 0.0433 0.1035

0.50
25.
100.
0000

0.04

0.10

0.15

B Link

#1 = #2 No.

(%) (%)
15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link
Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag
(mm/h) (mm ) (mm/h) C mm ) (mA3/s) Peak mins
POST DEV 166.95 12.50 1.500 17.50 0.000 51.206 68.060 0.1173 14.00 0.000
SUMMARY OF BASIN RESULTS
Link Time Peak Time Peak Total --------- Basin ---------
Label to Inflow to outflow Inflow vol. vol Stage
Peak (mA3/s) Peak (mA3/s) (mA3) Avail used used
POST DEV 14.00 .1173 15.00 +1143 92.634 0.0000 11.266 0.5141
SUMMARY OF BASIN OUTLET RESULTS
Link No. s/D Dia width Pipe Pipe
Label of Factor Length Slope
(m) (m) (m) (m (%)
POST DEV 1.0 -2250 0.000 5.000 3.000
Run completed at: 21st December 2007 9:01:00
mik open 0
Page 6

Page 30

DEO7731 POST DEV.out
Run started at: 20th December 2007 14:48:28

BRERA AE HATE EE AAA AEH HA AA AAA EEA ABH AAA AHHH AE AAA AAA HH AER
#HttH

RUNTIME RESULTS
FEE AEB AEE AE AEE AEA EEE EAE AE AE EATER EE EAE EA AE EAE AE EAE AEA EA AEA EEE AE EE
HEHEHE

Max. no. of links allowed = 2000
Max. no. of routng increments allowed = 25000
Max. no. of rating curve points = 25000

Max. no. of storm temporal points = 25000

Max. no. of channel subreaches = 25

Max link stack level = 25

Input version number = 650

LINK POST DEV 1.000

ESTIMATED VOLUME (CU METRES*10**3) = 0.4141E-01
ESTIMATED PEAK FLOW (CUMECS) = 0.06
ESTIMATED TIME TO PEAK (MINS) = 14.50

HAHAHAHAHAHA RAAEAAHEAHHAABHH EAA BEABHA AAA AAEAE EH HA ABHAHAAA BARA HARRAH HHH
HHT
Elanda Street, Sunshine Beach

Results for period from 0: 0.0 1/ 1/1990

to 12: 0.0 2/ 1/1990
HHAEHRHEHAAHAEAEHE HE AAAHAEH EH EB AH EEE ABH AAA A AA AAAHAARAEE HAAH HARE AH HARES
HatHE

ROUTING INCREMENT (MINS) = 0.50
STORM DURATION (MINS) = 25.
RETURN PERIOD (YRS) = 2.
BX = 1.0000
TOTAL OF FIRST SUB-AREAS (ha) = 0.04
TOTAL OF SECOND SUB-AREAS (ha) = 0.10
TOTAL OF ALL SUB-AREAS (ha) = 0.15
SUMMARY OF CATCHMENT AND RAINFALL DATA
Link Catch. Area Slope % Impervious Pern B Link
Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No.

Cha) (%) @%)
POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link
Page 1

Page 31

DEO7731 POST DEV.out
Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag
(mm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins
POST DEV 82.549 12.50 1.500 17.50 0.000 16.994 32.895 0.0635 14.50 0.000

LINK POST DEV 1.000

ESTIMATED VOLUME (CU METRES*10**3) = 0.5388E-01
ESTIMATED PEAK FLOW (CUMECS) = 0.08
ESTIMATED TIME TO PEAK (MINS) = 15.00

HAE AE EER EAHA HAA EAR EH RAE HEE EAE AAA AEE
HeHHH
Elanda Street, Sunshine Beach

Results for period from 0: 0.0 1/ 1/1990

to 12: 0.0 2/ 1/1990
HAA AEA EAE AETHER AEE AEA EAE EAE AEE EAE EEA AEE AA
HHHHH

ROUTING INCREMENT (MINS)
STORM DURATION (MINS)
RETURN PERIOD (YRS)

Bx 1

TOTAL OF FIRST SUB-AREAS (ha) = 0.04
TOTAL OF SECOND SUB-AREAS (ha) =

TOTAL OF ALL SUB-AREAS (ha) =

bueou i
Ne
wv

SUMMARY OF CATCHMENT AND RAINFALL DATA
Link Catch. Area Slope % Impervious Pern B Link
Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No.
Cha) (%) (%)
POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link
Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag
(mm/h) C mm +) (mm/h) C mm ) (mA3/s) Peak mins

POST DEV 103.19 12.50 1.500 17.50 0.000 25.247 41.497 0.0799 15.00 0.000

LINK POST DEV 1.000

ESTIMATED VOLUME (CU METRES*10**3) = 0.6053E-01
ESTIMATED PEAK FLOW CCUMECS) = 0.09
ESTIMATED TIME TO PEAK (MINS) = 15.00

BAER AER ADR RE AERA HAA ARAB ABA EAA EPAAEH HAHAHAHAHA
HEsHE
Elanda Street, Sunshine Beach

Results for period from 0: 0.0 1/ 1/1990

to 12: 0.0 2/ 1/1990
HHH ER ERE RARER AEEBEHATHE AAR AABAAAHAAAAAEHREEHAEEE ERY Ee a
HEHE

ROUTING INCREMENT (MINS) = 0.50
Page 2

Page 32

DEQ7731 POST DEV.out
STORM DURATION (MINS)
RETURN PERIOD (YRS)
BX
TOTAL OF FIRST SUB-AREAS (ha)
TOTAL OF SECOND SUB-AREAS (ha)
TOTAL OF ALL SUB-AREAS (ha)

.0000

How te

SUMMARY OF CATCHMENT AND RAINFALL DATA
Link Catch. Area Slope % Impervious Pern B Link
Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No.
Cha) (%) (%)
POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link
Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag
(mm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins

POST DEV 114.19 12.50 1.500 17.50 0.000 29. 685 "46. 081 0.0887 15.00 0.000

LINK POST DEV 1.000

ESTIMATED VOLUME (CU METRES*10**3) = 0.7023E-01
ESTIMATED PEAK FLOW CCUMECS) = 0.10
ESTIMATED TIME TO PEAK (MINS) = 15.00

FN TERE EEE TE I A TTT TT AT AI TE
HHH
Elanda Street, Sunshine Beach

Results for period from 0: 0.0 1/ 1/1990
to 12: 0.0 2/ 1/1990
IE ER EERE EER I EEE A EE EEE

ROUTING INCREMENT (MINS)
STORM DURATION (MINS)
RETURN PERIOD (YRS)

Bx

TOTAL OF FIRST SUB-AREAS (ha)
TOTAL OF SECOND SUB-AREAS (ha)
TOTAL OF ALL SUB-AREAS (ha)

0.50
25.

20.
. 0000

0.04
0.10
0.15

Hide

SUMMARY OF CATCHMENT AND RAINFALL DATA
Link Catch. Area Slope % Impervious Pern B Link
Label #1 #2 #1 #2 #1 (#2 #1 #2 #1 #2 No.
Cha) (%) (%)
POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link
Label Intensity #1 #2 #1 #2 #1 #2 Inftow to Lag
(mm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins

POST DEV 130.11 12.50 1.500 17.50 0.000 36.171 52.713 0.1014 15.00 0.000

LINK POST DEv 1.000

ESTIMATED VOLUME (CU METRES*10**3) = 0.6184E-01
Page 3

Page 33

DEO7731 POST DEV.out
ESTIMATED PEAK FLOW (CUMECS) = 0.11
ESTIMATED TIME TO PEAK (MINS) = 10.00

HERHH AREA EAHA AAAAEEA HAAR AAE ERE AHH AAEAHHHARA ERE EAH AUB H
#H##HH
Elanda Street, Sunshine Beach

Results for period from 0: 0.0 1/ 1/1990

to 12: 0.0 2/ 1/1990
HAA BA AAA ATA AEA AAA AEA AHA AEA AH HEA A EEE AEA AEE A
HHHHH

ROUTING INCREMENT (MINS) = 0.50
STORM DURATION (MINS) = 15.
RETURN PERIOD (YRS) = 50.
BX = 1.0000
TOTAL OF FIRST SUB-AREAS (ha) = 0.04
TOTAL OF SECOND SUB-AREAS (ha) = 0.10
TOTAL OF ALL SUB-AREAS (ha) = 0.15
SUMMARY OF CATCHMENT AND RAINFALL DATA
Link Catch. Area Slope % Impervious Pern B Link
Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No.

Cha) (%) (%)
POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time = Link

Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag
Cmm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins

PosT DEV 191.29 12.50 1.500 17.50 0.000 31.989 46.322 0.1079 10.00 0.000

LINK POST DEV 1.000

ESTIMATED VOLUME (CU METRES*10**3) = 0.8198E-01
ESTIMATED PEAK FLOW CCUMECS) = 0.12
ESTIMATED TIME TO PEAK (MINS) = 10.00

HAA AEE EE AE EAE EEE AEE EEE EEE AEE EE EAE AEE EEE AH
HHHHH
Elanda Street, Sunshine Beach

Results for period from 0: 0.0 1/ 1/1990

to 12: 0.0 2/ 1/1990
BEARER AE AEE HE EAE EAE EEE AEH AE EAE EH
HHHHH

ROUTING INCREMENT (MINS) = 0.50
STORM DURATION (MINS) = 20.
RETURN PERIOD (YRS) = 100.
Bx = 1.0000

TOTAL OF FIRST SUB-AREAS (ha) = 0.04
TOTAL OF SECOND SUB-AREAS (ha) = 0.10
TOTAL OF ALL SUB~AREAS (ha) = 0.15

SUMMARY OF CATCHMENT AND RAINFALL DATA
Page 4

Page 34

DEO7731 POST DEV.out

Link Catch. Area Slope % Impervious Pern B Link
Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No.
(ha) (%) (%)

POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link
Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag
(mm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins

POST DEV 185.57 12.50 1.500 17.50 0.000 44. 983 "60. 358 0.1199 10.00 0.000

Run completed at: 20th December 2007 14:48:30

mik open 0

Page 5

Page 35

DEO7731 PRE DEV.out
Run started at: 20th December 2007 14:39:16

AEA EEE HAE TER AAA BARA AA AAA HA BABA EAHA A BH AER AEA AE A EAB AH
HHEHH

RUNTIME RESULTS
BRE AEA AE AREA AE EAE AEE AE HE EAE AEA EAE AEA BA EAE AEE AE AEA AE EAE EEE AE EE EE EAE EAE EA EEA AE EE
HEAEE

Max. no. of links allowed = 2000
Max. no. of routng increments allowed = 25000
Max. no. of rating curve points = 25000

Max. no. of storm temporal points = 25000

Max. no. of channel subreaches = 25

Max link stack level = 25

Input Version number = 650

LINK PREDEV 1.000

ESTIMATED VOLUME (CU METRES*10**3) = 0.2691E-01
ESTIMATED PEAK FLOW (CUMECS) = 0.06
ESTIMATED TIME TO PEAK (MINS) = 15.00

HARRAH HAHA A AHA AHHH AAA AEH HAE ARH HAA HH RAHA HBB HHH HH
HHHAH
Elanda Street, Sunshine Beach

Results for period from 0: 0.0 1/ 1/1990

to 12: 0.0 2/ 1/1990
HEAEEHHEABAAEHE HAA AEH AAA AR ARBAARAAAAABHAAH HAAR HH HH HABA A HARARE HH
HHHHE

ROUTING INCREMENT (MINS) = 0.50
STORM DURATION (MINS) = 25.
RETURN PERIOD (YRS) = 2.
Bx = 1.0000
TOTAL OF FIRST SUB-AREAS (ha) = 0.13
TOTAL OF SECOND SUB-AREAS (ha) = 0.01
TOTAL OF ALL SUB-AREAS (ha) = 0.15
SUMMARY OF CATCHMENT AND RAINFALL DATA
Link Catch. Area Slope % Impervious Pern B Link
Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No.

Cha) (%) (%)
PREDEV 0.1348 0.0120 15.50 15.50 0.000 100.0 .030 .010 .0026 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link
Page 1

Page 36

DEO7731 PRE DEV.out
Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag
Cmm/h) C mm ) Cmmn/h) C mm ) (mA3/s) Peak mins
PREDEV 82.549 12.50 1.500 17.50 0.000 16.994 32.895 0.0572 15.00 0.000

LINK PREDEV 1.000

ESTIMATED VOLUME (CU METRES*10**3) = 0.3907E-01
ESTIMATED PEAK FLOW C(CUMECS) = 0.07
ESTIMATED TIME TO PEAK (MINS) = 15.00

FEAR AE AE ETE AE AEE EEE AEE EAE EAE AE EAE AE AE EEE EE AEE EE EEE EA EAE EEE EAE EEE AERA
HeHHH
Elanda Street, Sunshine Beach

Results for period from 0: 0.0 1/ 1/1990

to 12: 0.0 2/ 1/1990
HHBRAHHEAAEHAHAR EAE AHHEAHERAHAHABEHAAHAEHAAHHHEHABH HEBER RE
HHH

ROUTING INCREMENT (MINS)
STORM DURATION (MINS)
RETURN PERIOD (YRS)

BX

TOTAL OF FIRST SUB-AREAS (ha)
TOTAL OF SECOND SUB-AREAS (ha)
TOTAL OF ALL SUB-AREAS (ha)

0.50
25.

5.
- 0000

Ho te

o°0°0
ROP
uMRw

SUMMARY OF CATCHMENT AND RAINFALL DATA
Link Catch. Area Slope % Impervious Pern B Link
Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No.
Cha) (%) (%)
PREDEV 0.1348 0.0120 15.50 15.50 0.000 100.0 .030 .010 .0026 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link
Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag
(mm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins

PREDEV 103.19 12.50 1.500 17.50 0.000 25.247 41.497 0.0748 15.00 0.000

LINK PREDEV 1.000

ESTIMATED VOLUME (CU METRES*10**3) = 0.4557€-01
ESTIMATED PEAK FLOW (CUMECS) = 0.08
ESTIMATED TIME TO PEAK (MINS) = 15.00

BBA EH EAH TAHA AAA ATA AA EAE AA AAHAAEHAPHHHH AHHH
HeHHE
Elanda Street, Sunshine Beach

Results for period from 0: 0.0 1/ 1/1990

to 12: 0.0 2/ 1/1990
HEEHHHHHEAAHHAHAHAAAAHAAA AREA AREES BEEBE RAR RAE a
HHHHH

ROUTING INCREMENT (MINS) = 0.50
Page 2

Page 37

DEO7731 PRE DEV.out
STORM DURATION (MINS)
RETURN PERIOD (YRS)
BX

TOTAL OF FIRST SUB-AREAS (ha)
TOTAL OF SECOND SUB-AREAS (ha)
TOTAL OF ALL SUB-AREAS (ha)

25.
10.
. 0000

ou dt

Hot Woe

0.01
0.15

SUMMARY OF CATCHMENT AND RAINFALL DATA
Link Catch. Area Slope % Impervious Pern B Link
Label #1 #2 #1 #2 #1 #2 #1 #2 #10 «#2 No.
Cha) (%) (%)
PREDEV 0.1348 0.0120 15.50 15.50 0.000 100.0 .030 .010 .0026 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link
Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag
Cmm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins

PREDEV 114.19 12.50 1.500 17.50 0.000 29.685 46.081 0.0839 15.00 0.000

LINK PREDEV 1.000

ESTIMATED VOLUME (CU METRES*10**3) = 0.5506E-01
ESTIMATED PEAK FLOW (CUMECS) = 0.10
ESTIMATED TIME TO PEAK (MINS) = 15.00

BEHRAAEEEEEAEARAEBARERERAEAAEERAREEEH AEE EERE EEE BALE EDR EAE AER HEE AERA EEE
HHEHH

Elanda Street, Sunshine Beach

Results for period from 0: 0.0 1/ 1/1990
to 12: 0.0 2/ 1/1990

HAEREHHABEABAEEREBAEERAEAEAEE TER HABERAEHEERAEEAE EH ABEEAR BAAR AE ADEE EAE AEE AAA
#HHEH

ROUTING INCREMENT (MINS) = 0.50
STORM DURATION (MINS) = 25.
RETURN PERIOD (YRS) = 20.
BX = 1.0000
TOTAL OF FIRST SUB-AREAS (ha) = 0.13
TOTAL OF SECOND SUB-AREAS (ha) = 0.01
TOTAL OF ALL SUB-AREAS (ha) = 0.15
SUMMARY OF CATCHMENT AND RAINFALL DATA
Link Catch. Area Slope % Impervious Pern 8 Link
Label #1 #2 #1 #2 #1 «#2 #1 #2 #10 «#2 No.

%

(ha) % (%)
PREDEV 0.1348 0.0120 15.50 15.50 0.000 100.0 .030 .010 .0026 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link
Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag
(mm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins

PREDEV 130.11 12.50 1.500 17.50 0.000 36.171 52.713 0.0968 15.00 0.000

LINK PREDEV 1.000

ESTIMATED VOLUME (CU METRES*10**3) = 0.4872E-01
Page 3

Page 38

DEO7731 PRE DEV.out
ESTIMATED PEAK FLOW CCUMECS) = 0.10
ESTIMATED TIME TO PEAK (MINS) = 10.00

FER EH EAA EA AEA ET AEA AEA EEA AEE EA
#HHHHH
Elanda Street, Sunshine Beach

Results for period from 0: 0.0 1/ 1/1990

to 12: 0.0 2/ 1/1990
HEAR AE AEE AE AE AE AE EAE EEE A AEE EEE AEA AEE EAE AEE EEA EEA a
HHHHE

ROUTING INCREMENT (MINS) = 0.50
STORM DURATION (MINS) = 15.
RETURN PERIOD (YRS) = 50.
Bx = 1.0000
TOTAL OF FIRST SUB-AREAS (ha) = 0.13
TOTAL OF SECOND SUB~AREAS (ha) = 0.01
TOTAL OF ALL SUB-AREAS (ha) = 0.15
SUMMARY OF CATCHMENT AND RAINFALL DATA
tink Catch. Area Slope % Impervious Pern B Link
Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No.

Cha) (%) (%)
PREDEV 0.1348 0.0120 15.50 15.50 0.000 100.0 .030 .010 .0026 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time = Link
Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag
(mm/h) C mm ) Cmm/h) C mm ) (mA3/s) Peak mins

PREDEV 191.29 12.50 1.500 17.50 0.000 31.989 46.322 0.1032 10.00 0.000

LINK PREDEV 1.000

ESTIMATED VOLUME (CU METRES*10**3) = 0.5594E-01
ESTIMATED PEAK FLOW CCUMECS) = 0.11
ESTIMATED TIME TO PEAK (MINS) = 10.00

FRA AE AE AE HE AEA AEE EE EEE EAE A EE AEA AEE EEA
HeHHH
Elanda Street, Sunshine Beach

Results for period from 0: 0.0 1/ 1/1990

to 12: 0.0 2/ 1/1990
AEE EAE AE AE AEE AAA EEE EEE AEE AAA EE AEE EEE
HHHHH

ROUTING INCREMENT (MINS) = 0.50
STORM DURATION (MINS) = 45.
RETURN PERIOD CYRS) = 100.
BX = 1.0000

TOTAL OF FIRST SUB-AREAS (ha) = 0.13
TOTAL OF SECOND SUB-AREAS (ha) = 0.01
TOTAL OF ALL SUB-AREAS (ha) = 0.15

SUMMARY OF CATCHMENT AND RAINFALL DATA
Page 4

Page 39

ee a a ee ee ee ee ee ee ee ee ee

DEO7731 PRE DEV.out
Link Catch. Area Slope % Impervious Pern B Link
Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No.
(ha) (%) (%)
PREDEV 0.1348 0.0120 15.50 15.50 0.000 100.0 .030 .010 .0026 0.000 1.000

Link Average Init. Loss Cont. Loss Excess Rain Peak Time = Link
Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag
(mm/h) C mm ) Cmm/h) (mA3/s) Peak mins

C mm_)
PREDEV 211.27 12.50 1.500 17.50 0.000 36.962 51.317 0.1148 10.00 0.000
Run completed at: 20th December 2007 14:39:17

mik open 0

Page 5

Used in these records

About this file

File size
4.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2174 - Response to Information Request [As Published].pdf · 4.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.