Council archive · source document
07/2174 - Response to Information Request [As Published] · 132007.2174
- 5 - 1.0 INTRODUCTION 1.1 Preamble Duke Environmental have been commissioned by Oak Investment Holdings Pty Ltd (via Contour Consulting Engineers) to undertake this Stormwater Management Plan. This report has been compiled generally in accordance with Noosa Shire Councils (NSC) Policy 5 - Engineering Design Standards Roads, Drainage and Earthworks (Section 4. Design and Approval — Drainage), and addresses Item 3 of Noosa Shire Council Information Request (Ref: 2007/2174), dated 5 December 2007. This report details proposed stormwater quantity management strategies to be incorporated into the construction and operation phases of the proposed development. 1.2 Site Location The subject site is located at 43-45 Elanda Street, Sunshine Beach, and is described as Lots 399 & 400 on RP 48112. The site has an area of approximately 0.15 ha. Refer Figure 1.0 in Appendix A for Site Locality Plan and Figure 2.0 in Appendix A for Aerial Photograph. 1.3 Description of the Proposal The applicant proposes to construct a development comprising of five (5) apartments, with associated driveways, swimming pools and car parking areas. Additionally, the development will contain a detention basin to aid in the provision of non-worsening of stormwater flows. Refer lan Gorton Design Drawing 0710SD.06 included in Appendix A. 1.4 Site Characteristics The site is accessed from Elanda Street and consists of two (2) lots. One (1) lot has a residential dwelling which is accessed by an unsealed driveway. Existing vegetation on the subject site is generally comprised of scattered trees and grassy areas. The topography of the site is mapped as steeply sloping generally from the southern boundary towards the north of the site. Refer Figure 2.0 - Aerial Photograph included in Appendix A. 1.5 Site Constraints & Opportunities Opportunity is provided to locate a Detention Basin within the site to treat stormwater runoff. Further, a closed tank system for every apartment is proposed to collect rainwater runoff from the roof areas. Roof rainwater runoff will be re-used to supply toilet flushing and landscape irigation. Runoff from carpark/driveway areas and overflow from rain water tanks will enter the Detention Basin before being released from the site. These are considered AA07731SMP January 2008 ATijs
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2174 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.