Council archive · source document
B Current Decision Notice · 132007.2398
Attached to the e-mail 132007.2398.02 Request to change existing approval (1 of 3) Cover letter and site, floor & elevation plans.
132007.2398.01
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1 The applicant is advised that development contributions and infrastructure charges
applicable to this development approval have been based on the following Uses Class/
Uses and applicable quantities:-
Existing Development Approved Development
Existing Use Class / Existing Approved Use
Approved Quantity
Use Quantity Class / Use
Stage 1 = 120 single beds + 21x 2 bed
units
Stage 2 = 21x 2 bed units
Stage 3 = 29 x 2 bed units
1 Lot & house Multiple Housing - Stage 4 = 13 x 2 bed units
Type 3 -
Detached House +
Retirement & Stage 5 = 21 x 2 bed units
1 Vacant Lot Special Needs
Stage 6 = 24 x 2 bed units
Stage 7 = 18 x 2 bed units
Stage 8 = 20 x 2 bed units
Stage 9 = 12 x 2 bed units
2. The applicant is informed that payment via credit card transaction will not be an
acceptable method of payment for development contributions conditioned in this permit
or for infrastructure charge notices issued separately.
3. The requirement for payment of infrastructure contributions has been assessed in
accordance with Council’s policy “Infrastructure Contributions (Charges) Rebates for
Eligible Community Organisations”. This approval is based on the organisation type and
purpose of development in accordance with Table 1 of the policy as detailed in the
contribution condition of the Development Permit.
4. The applicant is advised that a Compliance Permit for all plumbing and drainage works
within the boundaries of the development site shall be obtained from Council’s Plumbing
Services Section prior to obtaining a Development Permit for Building Works.
5. A separate loop of water main should be installed within the property boundary for domestic
and fire services. Fire hydrants and fire sprinklers are should be connected to the fire main.
Fire hose reels and the domestic supply to be connected to the metered domestic service.
6. The applicant is advised that this development may require the provision of fire hydrants
and a booster pump in accordance with the Building Code of Australia, and in
consultation with Queensland Fire Services to ensure suitable fire fighting infrastructure
is provided. To this end any necessary fire hydrants shall be clearly shown on the plans
submitted for both Operational Works and Building Works approvals and if a booster
pump is deemed necessary, the plans shall indicate where the fire truck is to be
accommodated in order to provide boosting to the water supply.
7. A Waste Management Plan shall be in accordance with Planning Scheme Policy No. 9
and further, shall include the following information: -
The types of waste that will be generated from the activities approved within the
development.
Estimated volumes or tonnage of both recyclables and waste generated.
Methods to be used for dealing with garden waste.
Page 17 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
B CURRENT DECISION NOTICE.pdfRelated documentApplication case desk ↗
About this file
- File size
- 121 KB (small file)
- File type
No other editions are linked here.