Town Planning Report - Final April 2016
Attached to the e-mail MCU16/0044 & REC16/0009 Development Application - Planning Report, Att 1,2,3A & 3B Email 1 of 4.
15024 – Noosa Council April 2016
intention of the Council to develop a Master Plan that only provides additional parking
for the Peregian Village. The Master Plan includes an IT Digital Hub for start up businesses,
a new Peregian Beach Community House Building, significant open space improvements,
improved pedestrian linkages and other improvements, plus additional parking for the
locality generally. Put simply, it is not a correct interpretation of the Master Plan to suggest
it is about providing additional parking for the Peregian Village, this being but one aspect
only.
Prior to Stage 2 of the Master Plan proceeding formal approval for works on the land
around Di Hirst Oval that Council holds in Trust, consent for this work will need to be
obtained from the Department of Natural Resources and Mines, which is likely to take
some time.
The Rufous Street Master Plan was prepared through an extensive community
consultation process over a 6 month period, involving the following stages:
• In May 2015, initial consultation as part of “Peregian Your Say” was held with 256
comment being received;
• A Charrette design workshop was held on 27 June 2015 with 36 people
representing key local stakeholders attended the workshop;
• Drawing on ideas developed at the Charrette, Deike Richards Architects developed
a Peregian Knowledge Campus proposal for discussion purposes;
• Stakeholder review of Campus proposal was held on 2 September 2015 with
people involved in the design charrette to gauge their response to the Knowledge
Campus proposal, which was ultimately scaled down;
• On 10 December 2015 a stakeholder review of the new concept proposal was
undertaken and a project team engaged to develop a Draft Master Plan for the
precinct;
• A Draft Master Plan was presented to a public meeting on 30 January 2016 with
over 100 people in attendance at the Peregian Beach Community House;
• Following the Public Meeting on 30 January 2016 the Master Plan was available for
public viewing and comment on the “Your Say Noosa” website until 10 February
2016, with a total of 78 submissions and 4 late submissions being received, from
individuals, local business owners, community organisations and the Traders
Association.
Consequently, the Master Plan has been developed following an extensive public
consultation process held with the local community of Peregian Beach. The Master Plan
was reported to the Ordinary Meeting of 10 March 2016, where Noosa Council resolved:
That Council note the report by the Director Community Services to the Infrastructure &
Services Committee Meeting dated 2 March 2016 on the Rufous Street Precinct Master Plan
and:
A. Endorse the Rufous St Precinct Master Plan as per attachment A, B and C
Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.