Skip to the record
Accept no substitutions.

Original source · versioned page text

response to information request - Werin St

of 3

Page text shows just the words. Original shows the document exactly as it was published.

Engineering

    10. Please amend the Driveway and Access plan to reduce the width of the
        crossover at the kerb and front boundary to be in accordance with standard
        drawing RS-049.
    11. Please demonstrate on the engineering plans, prepared by an RPEQ, that a
        design B99 vehicle can manoeuvre onsite from each of the three parking
        spaces (the double garage and the single carport) and leave in a forward
        gear. If this cannot be achieved, please consider altering the design of the
        proposed second unit to allow sufficient manoeuvring space.
    12. Please amend the Bulk Earthworks Plan to detail whether the fill area is being
        retained or battered and provide detail around the proposed (i.e. slope of the
        batter or type of retaining structure).
    13. Please amend the stormwater management plan to include either of the
        following options:
            a. Consolidate the downpipes to a single crossing point in the footpath,
                preferably adjacent the crossover so the footpath replacement
                section can be poured with the crossover; or
            b. Include notes on the plan to replace an entire panel from the footpath
                at each crossing point or alternatively install the pits via boring under
                the footpath.

Please see attached updated SCG plans with detailed driveway plan. The proposed dual
occupancy dwellings adjoin a local road and may reverse out in accordance with the
Driveways and Carparking code. Despite this compliance, the applicant has demonstrated
manoeuvring for one space with the double garage for a five-point turn.

Bulk earthworks plan demonstrates minimal cut/fill and no retaining walls and stomwater
plans have been updated to address Council’s request.

----------------------------------------------------------------------------------------------------------------------
Pursuant to the Development Assessment Rules, the applicant has given the assessment
manager the information requested in the information request. Please proceed with the
assessment of the application at your earliest convenience.

If you have any further queries in relation to the above, please do not hesitate to contact
myself.

Regards,




Jack Lewis B.Sc Hons UNSW M.Plan Otago MPIA MQELA
Planner/Director
Pivotal Perspective Pty Ltd
0406 334 227




                                                                                                      Page 3 of 3
Log in to download the original file

response to information request - Werin St.pdf · 849 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.