Decision Notice OPW25 0040 · OPW25/0040

of 7

Text shows just the words. Original shows the document exactly as it was published.

                                                Prepared by Reitsma
                                                (AS ANNOTATED IN RED BY COUNCIL)

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 7 July 2027, unless an application to extend the currency period is
                      approved by Council.
               GENERAL CONDITIONS
                      Engineering
               3.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to Council prior to the prestart meeting.
               4.     The principal contractor must have all the appropriate insurance and public liability
                      documentation to carry out the works. The principal contractor is also responsible to ensure
                      that any subcontractors also have the appropriate insurance and public liability
                      documentation. Certificates demonstrating currency of public liability insurance and works
                      insurance covering the works must be submitted to Council prior to the prestart meeting.
               5.     Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works.
               6.     A Construction Management Plan must be submitted to Council prior to the prestart meeting
                      and must specifically address the following:
                      a.      traffic Management during the construction phase;
                      b.      appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
                              Devices (MUTCD);
                      c.      provision for safe pedestrian access across the frontage of the site both during and
                              outside working hours.
               Performance Bond
               7.     Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
                      submitted to Council, to secure the performance of all the conditions of this approval, prior
                      to the commencement of the works. The cash bond or trading bank guarantee will be
                      returned on performance of the conditions of the approval less any costs incurred by Council
                      in respect of enforcing performance of this permit. Council reserves the right to call upon the
                      bond or guaranteed sum to effect compliance with conditions.
               DURING CONSTRUCTION
                      Engineering
               8.     The integrity and condition of any existing public or Council infrastructure and services
                      (above ground and/or underground) must not be adversely affected by the proposed works
               9.     Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               10.    All works must be constructed and work procedure undertaken in accordance with:



                                                                                                        Page 2 of 7
Document Set ID: 23884938
Version: 2, Version Date: 10/07/2025

Used in these records

About this file

File size
149 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice OPW25 0040.pdf · 149 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.