Skip to the record
Beware of cheap imitations.

Council archive · source document

Planning Report No. 100041 · MCU22/0140

of 30

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

4.1.4        Waste Management


            The proposed development will accommodate kerbside waste collection via
            manoeuvring bins from the proposed access driveways. Bins can be stored
            along the side wall of each dwelling and will comprise one general waste and
            one recycle bin per unit. Bins will be collected by Council’s kerbside pickup
            service on the applicable day.


4.1.5        Services


            As stated under Section 3.1.7 of this report, the proposed development will be
            connected to all standard urban infrastructure services including reticulated
            supply of water, reticulated sewerage, reticulated stormwater infrastructure,
            reticulated electricity supply and telecommunications.


            It is noted that the existing sewer line traverses the site on an approximate
            east-west trajectory. Proposed Units 1 & 2 will be established over the sewer
            line, but in accordance with Unitywater advice all structural elements will
            incorporate sufficient clearance to the underground pipe infrastructure so as
            not    to    create   any   adverse     impacts.      Importantly,     access   to   sewer
            infrastructure via manholes is not impeded. This will be confirmed with
            Unitywater as part of a build over sewer application separate to this Material
            Change of Use application.



4.1.6        Stormwater Management


            On-site Stormwater Management has been addressed in detail within the
            Stormwater      Management       Plan      prepared    by   Ingeniir   and   included    as
            Appendix E of this application and has detailed compliance with Council’s
            Planning Scheme Policy and QUDM. The proposed development will capture
            flows in a detention system prior to discharging from the site. The detention
            tank will discharge to the lawful point of discharge to the Council controlled
            infrastructure in the road reserve.


                                                  15


Planning Report 100041             Murray & Associates (Qld) Pty Ltd                        August 2022

Used in these records

About this file

File size
678 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Planning Report No. 100041.pdf · 678 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.