Skip to the record
The gold standard in government transparency.

Original source · versioned page text

DA Form1-Development application details

Attached to the e-mail Operational Works Application OPW18/0293.

of 12

Page text shows just the words. Original shows the document exactly as it was published.

   11) Dividing land into parts by agreement – how many parts are being created and what is the intended use of the
   parts?
   Intended use of parts created              Residential              Commercial             Industrial               Other, please specify:


   Number of parts created

   12) Boundary realignment
   12.1) What are the current and proposed areas for each lot comprising the premises?
                                    Current lot                                                                 Proposed lot
                                                         2
   Lot on plan description                     Area (m )                              Lot on plan description                Area (m2)



   12.2) What is the reason for the boundary realignment?



   13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
   (attach schedule if there are more than two easements)
   Existing or               Width (m)        Length (m)        Purpose of the easement? (e.g.                     Identify the land/lot(s)
   proposed?                                                    pedestrian access)                                 benefitted by the easement




Division 3 – Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
   14.1) What is the nature of the operational work?
       Road work                                              Stormwater                              Water infrastructure
       Drainage work                                            Earthworks                             Sewage infrastructure
       Landscaping                                              Signage                                Clearing vegetation

       Other – please specify:                Carparking and associated drainage and treatment.

   14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
       Yes – specify number of new lots:
       No
   14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)
   $

PART 4 – ASSESSMENT MANAGER DETAILS
   15) Identify the assessment manager(s) who will be assessing this development application


   16) Has the local government agreed to apply a superseded planning scheme for this development application?
       Yes – a copy of the decision notice is attached to this development application
       Local government is taken to have agreed to the superseded planning scheme request – relevant documents
   attached
    No



                                                                                                                                             Page 5
                                                                                                          DA Form 1 – Development Application details
                                                                                                                        Version 1.1— 22 JUNE 2018
Log in to download the original file

DA Form1-Development application details.pdf · 330 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.