Council archive · source document
RFI - Attachment-4-Updated_Engineering_Plans · MCU19/0055
Plans and drawings: the text below has words only, no drawings.
Original PDF page 1, section 2. The text section number identifies this passage in the reader.
4
Bitumen
8 39
39.4
.84 5
39 .63 .3
39 39
rground*
.24
40
*Sewer Line Unde
39.4
40.2
.2 3 .15
*Water Line Underground From Records*
40 40
hill street
P
3 .44
RC
.7 39
39
215°0'
9.382
675
.60 .18
39 39
.29
.84 .7 5 .54 39
39 39 39 .38
39
.66
39.2
39
.40 9
39.NEL
9.0
2
39
FH3
KERB & CHAN
.87 .82 39.8 .59 .60 .46 .5 9 .41
.12 39 39 .75 .73 .75 39 39 39 39
40 39
29.035
39 39 39
.5 5
304°52'
39
.44
39
94
5 66
94
RP
.43 .08
39 39
.46 d*
39 n
ou
tF
No n)
o le e
h m
an Bitu
rM w
ate r Ne
.23 mw e
39 TE 8 t or (Und
A .2 *S
GRL 38
SWPit I
CERTIFIED BY: DRAWING ISSUE: DRAWING TITLE: SCALE & SHEET SIZE: SHEET No.:
CLIENT: Andy & Pamela Pannifex
Unit 7 "Kuluin Village South" C.Hoger RPEQ (15346) C
Proposed Dual Occupancy at
CROSSOVER & DRIVEWAY 1:200 - A3 1-01
1 Indiana Pl, Kuluin, Q, 4558. PROJECT:
Email: [email protected] DESIGNED BY: DRAWN BY: JOB No.: DATE:
www.structures.net.au
Lot 93 (RP94566), No. 27 Hill Street
C.H. C.H. 12727 04.07.2019
Sunshine Beach QLD 4567
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment-4-Updated_Engineering_Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 719 KB (small file)
- File type
No other editions are linked here.