Decision Notice - 010.2007.00001316.001 [As Published] · 132007.1316
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 6
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
1. Development undertaken in accordance with this approval must generally comply with the approved plans
of development. The approved plans are titled and numbered Lower Floor Plan (option 1), P01; Upper
Floor Plan (options 1), P02; Elevations, P03; Elevations, P04; and Site Plan, P05 prepared by Artech
Property and dated 27 June 2007 and as may be amended by these conditions.
2. The development must be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
emissions.
3. All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
(LPG or natural).
4. A rainwater storage tank with a minimum capacity of 5000 litres shall be provided on site to service the
detached house. The tank is to be installed to ensure water from the tank can be used both:
4.1. for external use such as watering gardens, irrigation, ornamental ponds or water features, topping
up swimming pools, outdoor cleaning; and
4.2. for use in flushing of toilets internal to the building.
5. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are not
constructed under overhead electricity transmission lines, or within any easements.
6. A minimum of 20% of the site shall be retained as soft landscaping.
7. The building shall not exceed 8.3m above natural ground level.
8. A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged
with Council at completion of work confirming compliance with the maximum allowable building height as
required by either the conditions of approval or the Planning Scheme.
9. The area within 4.5 metres of the revetment wall shall be developed in accordance with the following:
a) a minimum of 25% of the area is planted with shrubs; and
b) a maximum of 25% of the area is under hard pavement and the balance is to be turf or ground
covers; and
c) No tree species with a mature height of over 3m are to be planted; and
d) No shrubs are to be planted within 1m of the revetment wall; and
e) The ground surface within the first metre from the revetment wall is turf, ground cover or hard
pavement.
10. Security in the form of a cash bond or trading bank guarantee to the sum of $1,500 must be submitted, to
secure performance of all conditions of this approval, prior to the issue of a Development Permit for
building works. The cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing performance of this
permit.
11. The Development Permit for a material change of use lapses if the use has not happened by 22 August
2011, unless an application to extend the currency is approved by Council.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@1006463f\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00001316.001 [As Published]Related documentApplication case desk ↗
0015E6B5.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 26 KB (small file)
- File type
No other editions are linked here.