Original source · versioned page text
Attachment 3 - Pump Station Upgrade Corrospondence
Attached to the e-mail Reconfiguring a Lot (1 lot into 19) - RAL18/0023.
1 also draw your attention to Clauses 10.4 and 10.5 of Infrastructure Agreement between . Council and Mirose which states that sewerage infrastructure charges will apply for future stages of the development. Also the agreement notes that at its special meeting of 30 July 2003, resolved that it was not satisfied that infrastructure required by conditions of the approval is of such benefit to the owner of Lot 1 on RP215933 ‘(Tetrex) that would require a reimbursement by the owner to the Applicant. I have enclosed copies of the relevant clauses for your reference. Please note that sewerage infrastructure charges for the Tetrex site development did not and will not include any allowance for the cost of the upgrade of the sewerage pump station and rising main works carried out as part of the Noosa Civic Development. Further, the calculation of any future sewerage infrastructure charges for future stages of the Noosa Civic Development also will not include the costs of the upgraded pump station and sewerage infrastructure provided as.part of the Noosa Civic development. However it is noted that the pumping equipment and electrical equipment provided by Stockwells has been sized to accommodate ultimate flows including flows from the Tetrex site and given these circumstances, Council is prepared to allow a credit for sewerage infrastructure charges for future stages of the Noosa Civic Development based on the overall percentage of loading attributable to the Tetrex site. On this basis an amount of up to $59,548 (10.14% of $587,254.43 - Refer your letter of 13 March 2007) will be allowed. I trust that this matter is now settled. Yours faithfully - Mike Froude Water & Sewerage Capital Works Manager
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original