HumeCeptor® system
Inspection and maintenance guide
Issue 2


[OCR of page images]
a
umes Strength. Performance. Passion.

HumeCeptor® system
Inspection and maintenance guide

TANT

 
Full text of the other 11 pages

Page 2

    Purpose of this guide
    This guide outlines the maintenance procedures and requirements for
    HumeCeptor® units.


    Where the contents of this guide differ from project      Humes makes no representation or warranty, implied
    specifications and drawings, supervisory personnel        or otherwise that, amongst others, the content of this
    should consult with a Humes engineer. In the event        guide is free from errors or omissions or in relation
    of any conflict between the information in this guide     to the adequacy of the information contained in this
    and local legislative requirements, the legislative       guide and where appropriate you will seek verification
    requirements will take precedence.                        from an independent third party before relying on
                                                              any information in this guide. Humes is not liable or
    It is the responsibility of the site owner and its        responsible to any person for any use or reliance of any
    contractors to determine the site’s suitable access and   information arising out of or in connection with this guide.
    location for maintenance plant and equipment.


    Nothing in this guide is to be construed as a
    representation, endorsement, promise, guarantee or
    warranty whether expressed or implied.




1   HumeCeptor® system

Page 3

                                                                                        HumeCeptor® system
Safety advice
The HumeCeptor® unit must be maintained in
accordance with all relevant health and safety
requirements, including the use of PPE and fall protection
where required.




Confined space entry

Maintenance of the HumeCeptor® should not require
entry, however, if entry into the unit is required, then the
device is deemed a confined space. As such, if entering
the unit, all equipment and training must comply to SHE
regulations. It is the responsibility of the contractor or
person/s entering the unit to proceed safely at all times.




Personal safety equipment

The contractor is responsible for the provision of
appropriate personal protection equipment including,
but not limited to safety boots, hard hat, reflective vest,
protective eyewear, gloves and fall protection equipment.
Make sure all equipment is used by trained and certified
personnel, and is checked for proper operation and safety
features prior to use.




Handling

The customer, or their contractor, is responsible for the
removal of access lids from the HumeCeptor® unit. The
customer or contractor should familiarise themselves
with the device and site constraints, and particular
attention should be given to safety hazards such as
overhead power lines and other services in the vicinity
when considering the position of plant and equipment.




                                                               HumeCeptor® system   2

Page 4

    Maintenance overview                                          Sediment settles to the bottom of the lower chamber
                                                                  by gravity forces. The circular design of the treatment
    To ensure ongoing long-term environmental protection          chamber is critical to prevent turbulent eddy currents,
    HumeCeptor® needs to be maintained (generally                 which inhibit the settling process.
    annually).
                                                                  During high flow conditions, stormwater in the by-pass
    The actual on-going maintenance frequency                     chamber will overtop the weir and be conveyed to the
    requirements will be determined through quarterly             outlet drain directly. Water flowing over the weir creates
    inspections undertaken during the first year. However,        a backwater effect on the outlet decant pipe (ensuring
    only an annual maintenance period is anticipated for          head stabilization between the inlet drop pipe and outlet
    most HumeCeptor® units installed within drainage              decant pipe). This ensures that excessive flow will not be
    infrastructure.                                               forced through the treatment chamber scouring or re-
                                                                  suspending previously settled material.
    Inspection can be performed by anyone, and procedures
    for inspection are provided in this document.                 The by-pass mechanism is an integral part of the
                                                                  HumeCeptor®, since other oil/grit separator designs and
    Generally, comprehensive maintenance is performed             proprietary devices have been noted to scour during high
    from the surface via vacuum truck. Companies capable          flow conditions (Schueler and Shepp, 1993).
    of performing this maintenance can be found in the
    Yellow Pages or online by searching sewer cleaning or
                                                                  Figure 1 – HumeCeptor® system operation during design
    liquid waste removal. If you require a list of contacts for
                                                                             flow conditions
    cleaning your HumeCeptor® please call your nearest
    Humes office.



    HumeCeptor® operation

    A HumeCeptor® unit can be divided into two distinct
    zones comprising:

    1.   A lower treatment chamber
    2.   An upper by-pass chamber


    Stormwater flows into the by-pass chamber via the
    stormwater drainage-pipe, where low flows are diverted        Figure 2 – HumeCeptor® system operation during high
    into the treatment chamber by the weir and drop pipe                     flow conditions

    arrangement.


    Note, the treatment chamber is always full of water
    so water will flow up through the outlet decant pipe
    (based on the head of water behind the inlet weir) to be
    discharged back into the by-pass chamber downstream of
    the weir. The downstream section of the by-pass chamber
    is connected to the outlet drainage pipe.
    Oil and other liquids with a specific gravity less than
    water rise in the treatment chamber and become trapped
    since the inlet of outlet decant pipe is submerged.




3   HumeCeptor® system

Page 5

                                                                                                                           HumeCeptor® system
Model Identification                                         Figure 3 – HumeCeptor® system variations


Even if you do not have the plans of your stormwater
drainage system, you will still be able to identify
the location of an in-line HumeCeptor® unit(s) as all
HumeCeptor® units have a 600 mm diameter cast iron
lid, clearly embossed with “HumeCeptor®”.


You will be also be able to identify an inlet HumeCeptor®
unit(s), by looking through the stormwater inlet grate
where the fibreglass insert will be visible.
                                                                     STC 2 (inlet)                          MultiCeptor™
However once you have found the unit, you may still be
uncertain what model it is. Comparing the measured
depth from the water level (bottom of insert) to the base
of the tank with the dimensions listed in Table 1 below
will help to determine the size/model of the unit.


If there is still uncertainty regarding the size of the
HumeCeptor® using depth measurements, contact your
nearest Humes office for further advice.


There are a few variations on the standard models
described above. However, basic maintenance procedures                   AquaCeptor™
will be the same. The following figures display the
different types of HumeCeptor® units available. For
further details, please refer to the HumeCeptor® Technical
manual.



Table 1 – Depths from pipe invert to base

            Model                 Pipe invert to base (m)
             STC2                              1.50
             STC3                              1.40
             STC5                              1.80
                                                                      DuoCeptor™
             STC7                              2.70
             STC9                              2.40
            STC14                              3.40
            STC18                              3.10
            STC23                              3.70
            STC27                              3.50




                                                                     HumeCeptor® MAX




                                                                                                  HumeCeptor® system   4

Page 6

    Inspection Procedure                                           4.    To empty the Sludge Judge, touch the check valve pin
                                                                         against a hard surface; this opens the check valve
    HumeCeptor® units are generally sized such that they                 allowing the contents to drain out.
    only require maintenance (cleaning out) on an annual
    basis. This being said, it is difficult to know what           Oil Sampling
    the actual pollutant loading rate from the particular
                                                                   A similar procedure for using the Sludge Judge applies for
    catchment that the HumeCeptor® services might be
                                                                   checking the oil level in the HumeCeptor®, except in this
    (how much pollution enters the device in a given time
                                                                   instance the device is used through the oil clean out port
    frame). Therefore, the manufacturer recommends that
                                                                   rather than the outlet riser.
    the HumeCeptor® should be monitored on a 3 monthly
    basis, which will assist in determining the actual need for    1. Lower the Sludge Judge into the oil clean out port
    maintenance.                                                         of the HumeCeptor® to a depth of 1 to 1.5 meters
                                                                         below the fibreglass insert.
    The following procedure can be used to inspect the
    HumeCeptor® and determine the levels of sediment and           2. When at the required depth tug slightly on the rope
    hydrocarbons (oils) in the device.                                   to set the check valve trapping the mixture inside.

    1.   Locate the HumeCeptor® - all units have a 600mm           3. When the Sludge Judge has been raised clear of the
         diameter cast iron lid embossed with“HumeCeptor®”               HumeCeptor®, the amount of oil in the device can be
    2.   Use the Gatic lifter to remove the lid                          read using the markers on the clear pipe section.
    3.   Conduct a visual inspection of the inlet and outlet
                                                                   4. To empty the Sludge Judge, touch the check valve pin
         pipes to ensure there are no blockages
                                                                         against a hard surface; this opens the check valve
    4.   Conduct a visual inspection of the fibreglass insert
                                                                         allowing the contents to drain out.
         and check for damage; also check for obstructions in
         the orifice
                                                                   The depths of the sediment and hydrocarbons should
    5.   Identify the location of the oil clean out port and the
                                                                   be recorded. The HumeCeptor® will require a clean out
         outlet riser
                                                                   when either the sediment or oil levels in the device reach
    6.   Use the Sludge Judge to determine the levels of
                                                                   the depths outlined in Table 2 below.
         sediment and hydrocarbons in the device
                                                                   It should be noted that for an STC2 model HumeCeptor®,
    The HumeCeptor® is designed to capture and retain              a screw cap will need to be removed to access the Oil
    sediments and hydrocarbons, therefore, two samples will        Clean Out Port. Ensure that the cap is replaced when
    need to be drawn from the device by using the Sludge           work is completed.
    Judge. The Sludge Judge is used in the following manner:


    Sediment Sampling
                                                                   Table 2 – Sediment depths indicating maintenance
    1.   Lower the Sludge Judge into the outlet riser of the
         HumeCeptor® all the way to the base of the unit; the       Model       Max Oil Depth      Max Sediment Depth
                                                                                   (mm)                  (mm)
         float valve will open allowing materials to flow in. It
         should be lowered in slowly and not plunged to the
                                                                        STC2          350                   200

         bottom.
                                                                        STC3          450                   350

    2.   When at the bottom of the unit the clear pipe of
                                                                        STC5          450                   600

         the Sludge Judge will be filled to the top of weir             STC7          450                   850

         level with water (and sediment at the bottom). Tug             STC9          850                   600

         slightly on the rope to set the check valve trapping       STC14            1150                   700

         the mixture inside.                                        STC18            1050                   600

    3.   When the Sludge Judge has been raised clear of the         STC23            1050                   700

         HumeCeptor®, the amount of sediment in the base            STC27            1150                   750

         of the device can be read using the markers on the
         clear pipe section.




5   HumeCeptor® system

Page 7

                                                                                                                                  HumeCeptor® system
Maintenance Procedure                                           It may be convenient on larger units to de-water some
                                                                of the relatively clean water from the central zone in the
Maintenance of HumeCeptor® is performed using                   treatment chamber. This will minimise maintenance
vacuum/eductor trucks this ensures that no requirement          costs as disposal of essentially clean stormwater can
for entry into the unit is necessary for maintenance.           be avoided. Often this can be done in either the sewer
The vacuum truck industry is a well-established sector of       or upstream of the pipe (position sandbags to create
the waste management industry cleaning underground              temporary storage). However, this should only be done
tanks, sewers and catch basins.                                 with the appropriate authorities consent.


A HumeCeptor® unit is cleaned by adhering to the
following steps:                                                Maintenance Cost

1.   Complete a Job Hazard Analysis (JHA) and a Work            The costs to clean out a HumeCeptor® will vary based
     Method Statement (WMS) before undertaking the              on the size of the unit, pollutant volume/type and
     maintenance procedure.                                     transportation distances.
2.   Prepare the site around the HumeCeptor® for
     cleaning. This involves establishing the job site          Economies of scale will be achieved where there are

     (traffic control if required), assembling cleaning         multiple units for a given location. The time to clean the
                                                                HumeCeptor® is approximately 30 minutes to an hour,
     equipment, positioning the vacuum truck and
                                                                excluding transportation and disposal.
     ensuring correct equipment is available to use
     (including PPE).                                           Disposal costs will vary greatly depending on local
3.   Remove the lid above the holding chamber and               authority requirements, the type of contaminants
     conduct a visual inspection to assess the condition        washing off your site and the availability of waste
     of the HumeCeptor® and note if there are any               disposal facilities.
     blockages or lodged debris
4.   Check for oil using a dipstick, tube or sampling device    It should be noted that these costs would be incurred
                                                                during the maintenance of any type or brand stormwater
     via the oil sample port.
                                                                quality structure and not just the HumeCeptor®.
5.   Remove and store any free oil separately using a
     small portable pump via the oil sample port:
     a.   Be sure to skim from the top of the water to
     ensure oil contaminants are removed
     b.   Approximately 300 mm of water should also be
     removed from the top of the water column
     c.   The oil/fuel waste can be disposed of
     separately, as this will incur a higher disposal cost
6.   Remove the sludge/sediment from the bottom of the
     HumeCeptor® using the vacuum truck:
     a.   The truck’s suction hose should be lowered into
     the sump of the device via the outlet riser
     b.   While extracting the waste, move the hose
     around in the opening to ensure that the hose
     is sucking from various locations in the sump to
     remove all the captured material
     c.   The extracted waste can usually be disposed of
     as general waste at a waste transfer station
7.   Clean the interior of the pit using water jet
8.   Replace lid, ensuring it is firmly and securely in place




                                                                                                         HumeCeptor® system   6

Page 8

    Maintenance Frequency                                        Although HumeCeptor® will continue to operate
                                                                 effectively until sediment completely fills the
    It is generally recommended that inspection of the unit      treatment chamber. It is still deemed good practice
    to be undertaken every three months for the first year of    that maintenance should be performed “annually” or
    operation. This schedule may then be relaxed after a year,   “once the sediment depth exceeds the guideline values”
    when confidence is gained regarding the actual pollutant     provided in Table 2, whichever condition is achieved first.
    load and run-off generated by the up-stream catchment.
    A more frequent program may be required where there is       HumeCeptor® units are often installed in areas where
    greater risk of oil spills.                                  the potential for hydrocarbon spillage is great. However
                                                                 HumeCeptor® should be cleaned immediately after any
    You may elect to undertake inspection yourself or            major spill occurs, by a licensed liquid waste contractor.
    choose to contract a waste management company to             You should also notify the appropriate regulatory
    obtain a complete inspection and maintenance package.        agencies as required in the event of a spill.
    Contact the nearest Humes office for recommendations/
    information regarding companies, which have the
    capabilities to provide an inspection and maintenance
                                                                 Removal of Hazardous Material
    service in your area.
                                                                 The requirements for the disposal of material removed
                                                                 from the HumeCeptor® are similar to that of any other
    The need for maintenance can be determined easily by
                                                                 stormwater treatment device. Local guidelines should be
    inspecting the unit from the surface. The depth of oil in
                                                                 consulted prior to disposal.
    the interceptor can be determined by inserting a dipstick
    in the oil sample port. Similarly, the depth of sediment
                                                                 The sediment, once de-watered, may be suitable for
    can be measured from the surface without entry into
                                                                 disposal in a sanitary landfill. It is recommended to check
    the HumeCeptor® via a clear tube (Sediment sampler) -
                                                                 with the relevant authorities in your local area as some
    sediment sampler tubes are available from Humes. The
                                                                 local authorities may require testing of the sediment
    sampler is inserted in the 610 mm opening in the “disc”
                                                                 prior to disposal.
    in-line models and through the 100 mm oil sample port
    in the “inlet” models.
                                                                 All petroleum waste-products, collected in the
                                                                 HumeCeptor® (oil/chemical/fuel spills), should
    As a general rule an annual maintenance schedule is
                                                                 be removed and disposed of by a licensed waste
    recommended. However maintenance requirement
                                                                 management contractor.
    frequency will vary with the volumes of stormwater
    pollution generated by your site (number of spills,
    amount of sediment, etc.). So while annual maintenance
    is recommended, the frequency of maintenance may be
    varied (increased or reduced) based on local conditions;
    if the unit is filling up with sediment more quickly than
    projected, maintenance may be required semi-annually;
    conversely once the site has stabilised maintenance may
    only be required every two or three years.




7   HumeCeptor® system

Page 9

Example Job Safety Analysis (JSA)/Work Method Statement (WMS)
The following JSA/WMS is a guide only. It is the responsibility of the cleaning contractor or asset owner to develop their own JSA/WMS in
line with their own WHS requirements and constraints. It also assumes that there will be no entry into the unit during maintenance.

 Project/ Address:                                                                                                  Date:

 Job: Clean out of HumeCeptor® unit                                                                                 Operator:

 Risk Level:                  1 - Extreme                  2 - High                  3 - Medium                     4 – Low                    5 - Negligible
 Consequence:                 Likely to cause very         Clear potential for       Similar to risk of driving     Little likelihood of any   Virtually Harmless
                              serious harm                 serious harm              a car                          harm
 Response:                    STOP THE JOB                 STOP and Reassess to      Control and ensure             Monitor to ensure risk     Continue work
                                                           find better way           controls work                  remains low
                                                                                   INITIAL                                                       PERSON             END
                PROCEDURE                             POSSIBLE HAZARDS                                            CONTROLS
                                                                                    RISK                                                       RESPONSIBLE          RISK
 1. Preliminaries:                             Nil                                    -      Refer to relevant manuals                         Operator              -
 • Confirm unit locations and types
 • Familiarise with the technical manual
 2. Plan the Job:                              • Climbing in/out/around of truck     3       • Refer to safety plan on moving around           Operator              4
 • Room to access and work on the unit                                                         vehicles
   without impacting other property or         • All units have a high risk of       4       • Wear PPE and never reach into or lift                                 5
   vehicles                                      containing syringes                           accumulated matter with hands. If a needle
 • Consider water flows and if excessive                                                       stick injury occurs, wash the affected area
   note and move onto next job                                                                 with soap and water and report the incident
 • Condition and status of unit                                                                to the branch and seek medical attention
 • Identify water fill point                                                                   ASAP.
 • Identify waste dump point
 3.Establish Job Site:                         • Traffic                             2       • Devise a relevant Traffic Management WMS        Operator              5
 • Over 60 km/hr will require traffic          • Pedestrians                                 • Ensure barriers and signs redirect
   management                                  • Overhead power lines                          pedestrians
 • Within 6.4m of overhead power lines                                                       • Ensure spotter is present
   will require spotter
 4. Assemble Cleaning Equipment                • Infection                           3       • Personal hygiene (wash hands prior to           Operator              5
 • Position vacuum hose to remove debris       • Sharp edges                                   smoking/eating)
   from the unit                               • Manual handling                             • Wear gloves & remove sharp edges/burrs on
                                               • Falling equipment                             equipment
                                               • High pressure water                         • Follow a manual handling WMS
                                                                                             • Store equipment securely on vehicle
                                                                                             • Inspect vacuum hose fittings firmly secured
                                                                                             • Inspect hose daily 7 ensure it has been
                                                                                               tested (6 monthly)
                                                                                             • Never cap jetting hose
                                                                                             • Inspect jetting hose for damage
                                                                                             • Never adjust pump pressures or regulators
                                                                                             • Maximum reducer on 1” hose is ¾”
                                                                                             • No reducers on ½” hose
                                                                                             • Fittings to be firmly secured using a spanner
 5. Open the Cover                             • Manual Handling                     3       • Refer to a SWP for manual handling              Operator              5
 • Remove lid using the manhole lifting        • Open Manholes                               • Refer to a SWP for manhole lifting
   procedure
 • If lid is mass concrete and exceeds safe
   lifting limits, use mechanical lifting
   device
 6. Start Cleaning                             • Manual handling                     3       • Follow a SMP for manual handling                Operator              5
 • Check for oil using a dipstick, tube or     • Eye injury from flying debris               • Wear eye protection
   sampling device                             • Noise                                       • Wear hearing protection
 • Remove and store any free oil separately    • People inside exclusion zone                • Stop operation until area clear. Only
   using a small portable pump                 • Confined Space Entry (If                      essential personnel within exclusion zone
 • If there is any requirement to enter the      required)                                   • Ensuring minimum slack in hose to prevent
   pit for any reason, confined Space Entry                                                    whipping
   Procedure is to be followed                                                               • Refer to confined space manuals and SWPs
 • Decant the relatively clean water from
   the central zone to either sewer or
   upstream (approvals from authorities
   required to discharge to sewer)
   (OPTIONAL)
 • Vacuum all material out of the sump
   until empty clear
 • Clean the interior of the pit using water
   jet
 7. Finish Cleaning                            • Manual handling                     3       • Follow a SMP for manual handling                Operator              5
 • Replace lid ensuring it is fimly &
   securely in place
 • Ensure all waste is vacuumed and site is
   clean prior to packing up
 • Complete the CWS recording all details
   and any problems

Page 10

HumeCeptor® unit maintenance record


                                                             Customer details
Company                                                                 Phone
Contact name                                                            Email
Address                                                                 Date
State                                                                   Operator name
                                                         HumeCeptor® unit details
Model                                                                   Type (circle one)         Standard | Inlet | Multi | Aqua
Cleaning method (circle one)        Vacuum | Eduction                                                       Duo | MAX
                                                               Layout details
                                Plan                                                        Elevation




                                                         Pollutant removal results
Estimated volume of water removed (L)                                   Hydrocarbons(%)
Estimated volume of pollutants/oil (m )3
                                                                        Vegetation (%)
Percentage of pollutant content (%)                                     Sediments (%)
Percentage of pollutant capacity (%)                                    Total volume (%)                        100
Any evidence of gross pollutants (i.e. items larger than drink cans)?                                                  YES     NO
Any evidence of sewage contamination?                                                                                  YES     NO
Any evidence of any other unexpected contamination?                                                                    YES     NO
Describe unexpected contamination (if any):




Any problems cleaning the HumeCeptor® unit (describe briefly):




If problems were experienced were they thenresolved satisfactorily (describe briefly):

Page 11

Contact information
National sales 1300 361 601

humes.com.au

[email protected]




Head Office                   New South Wales       South Australia

18 Little Cribb St            Grafton               Adelaide
Milton 4064 QLD               Ph: (02) 6644 7666    Ph: (08) 8168 4544
Ph: (07) 3364 2800            Fax: (02) 6644 7313   Fax: (08) 8168 4549
Fax: (07) 3364 2963
                              Newcastle
                              Ph: (02) 4032 6800    Western Australia
Queensland                    Fax: (02) 4032 6822
                                                    Gnangara
Ipswich/Brisbane              Sydney                Ph: (08) 9302 8000
Ph: (07) 3814 9000            Ph: (02) 9832 5555    Fax: (08) 9309 1625
Fax: (07) 3814 9014           Fax: (02) 9625 5200
                                                    Perth
Rockhampton                   Tamworth              Ph: (08) 9351 6999
Ph: (07) 4924 7900            Ph: (02) 6763 7300    Fax: (08) 9351 6977
Fax: (07) 4924 7901           Fax: (02) 6763 7301


Townsville                                          Northern Territory
Ph: (07) 4758 6000            Victoria
Fax: (07) 4758 6001                                 Darwin
                              Echuca                Ph: (08) 8984 1600
                              Ph: (03) 5480 2371    Fax: (08) 8984 1614
                              Fax: (03) 5482 3090


                              Melbourne
                              Ph: (03) 9360 3888
                              Fax: (03) 9360 3887

Page 12

National sales 1300 361 601
humes.com.au
[email protected]




A Division of Holcim Australia



This brochure supersedes all previous literature on this subject. As the specifications and details contained in this publication may change please
check with Humes Customer Service for confirmation of current issue. This document is provided for information only. Users are advised to
make their own determination as to the suitability of this information or any Humes product for their own specific circumstances. We accept
no responsibility for any loss or damage resulting from any person acting on this information. Humes is a registered business name of Holcim
(Australia) Pty Ltd. HumeCeptor is a registered trademark of Holcim. “Strength. Performance. Passion.” is a trademark of Holcim. HumeCeptor is
marketed, sold and manufactured by Humes under licence from Imbrium Systems Corp.

© April 2017 Holcim (Australia) Pty Ltd ABN 87 099 732 297. All rights reserved. This guide or any part of it may not be reproduced without prior
written consent of Holcim.

Used in these records

About this file

File size
839 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

humeceptor-maintenance-guide-2017.pdf · 839 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.