Geotechnical Report
SOME GUIDELINES FOR HILLSIDE CONSTRUCTION
GOOD ENGINEERING PRACTICE POOR ENGINEERING PRACTICE
ADVICE
GEOTECHNICAL Obtain advice from a qualified, experienced geotechnical consultant at Prepare detailed plan and start site works before
ASSESSMENT early stage of planning and before site works. geotechnical advice.
PLANNING
SITE PLANNING Having obtained geotechnical advice, plan the development with the risk Plan development without regard for the Risk.
arising from the identified hazards and consequences in mind.
DESIGN AND CONSTRUCTION
HOUSE DESIGN Use flexible structures which incorporate properly designed brickwork, Floor plans which require extensive cutting and
timber or steel frames, timber or panel cladding. Consider use of split filling. Movement intolerant structures.
levels. Use decks for recreational areas where appropriate.
SITE CLEARING Retain natural vegetation wherever practicable. Indiscriminately clear the site.
ACCESS & DRIVEWAYS Satisfy requirements below for cuts, fills, retaining walls and drainage. Excavate and fill for site access before
Council specifications for grades may need to be modified. Driveways and geotechnical advice.
parking areas may need to be fully supported on piers.
EARTHWORKS Retain natural contours wherever possible. Indiscriminant bulk earthworks.
CUTS Minimise depth. Large scale cuts and benching.
Support with engineered retaining walls or batter to appropriate slope. Unsupported cuts.
Provide drainage measures and erosion control. Ignore drainage requirements.
FILLS Minimise height. Loose or poorly compacted fill, which if it fails, may
Strip vegetation and topsoil and key into natural slopes prior to filling. flow a considerable distance (including onto
Use clean fill materials and compact to engineering standards. properties below).
Batter to appropriate slope or support with engineered retaining wall. Block natural drainage lines.
Provide surface drainage and appropriate subsurface drainage. Fill over existing vegetation and topsoil.
Include stumps, trees, vegetation, topsoil,
boulders, building rubble etc. in fill.
ROCK OUTCROPS & Remove or stabilise boulders which may have unacceptable risk. Support Disturb or undercut detached blocks or boulders.
BOULDERS rock faces where necessary.
RETAINING WALLS Engineer design to resist applied soil and water forces. Construct a structurally inadequate wall such as
Found on bedrock where practicable. sandstone flagging, brick or unreinforced
Provide subsurface drainage within wall backfill and surface drainage on blockwork.
slope above. Lack of subsurface drains and weepholes.
Construct wall as soon as possible after cut/fill operation.
FOOTINGS Found within bedrock where practicable. Found on topsoil, loose fill, detached boulders or
Use rows of piers or strip footings oriented up and down slope. undercut cliffs.
Design for lateral creep pressures if necessary.
Backfill footing excavations to exclude ingress of surface water.
SWIMMING POOLS Engineer designed.
Support on piers to rock where practicable.
Provide with under-drainage and gravity drain outlet where practicable.
Design for high soil pressures which may develop on uphill side whilst
there may be little or no lateral support on downhill side.
DRAINAGE
SURFACE Provide at tops of cut and fill slopes. Discharge at top of fills and cuts.
Discharge to street drainage or natural water courses. Allow water to pond bench areas.
Provide generous falls to prevent blockage by siltation and incorporate silt
traps.
Line to minimise infiltration and make flexible where possible.
Special structures to dissipate energy at changes of slope and/or direction.
SUBSURFACE Provide filter around subsurface drain. Discharge of roof run-off into absorption trenches.
Provide drain behind retaining walls.
Use flexible pipelines with access for maintenance.
Prevent inflow of surface water.
SEPTIC & SULLAGE Usually requires pump-out or mains sewer systems; absorption trenches Discharge sullage directly onto and into slopes.
may be possible in some areas if risk is acceptable. Use of absorption trenches without consideration
Storage tanks should be water-tight and adequately founded. of landslide risk.
EROSION CONTROL & Control erosion as this may lead to instability. Failure to observe earthworks and drainage
LANDSCAPING Revegetate cleared area. recommendations when landscaping.
DRAWINGS AND SITE VISITS DURING CONSTRUCTION
DRAWINGS Building Application drawings should be viewed by a geotechnical
consultant.
SITE VISITS Site visits by consultant may be appropriate during construction.
INSPECTION AND MAINTENANCE BY OWNER
OWNER’S Clean drainage systems; repair broken joints in drains and leaks in supply
RESPONSIBILITY pipes.
Where structural distress is evident seek advice.
If seepage observed, determine cause or seek advice on consequences.
This table is extracted from PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT as presented in Australian Geomechanics, Vol 42, No 1, March
2007 which discusses the matter more fully.
February 2019
See the original