RFI - C - Site Based Stormwater Management Plan
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn CIVIL ENGINEERING PROJECT MANAGEMENT
SEDIMENT AND EROSION CONTROL
SITE BASED STORMWATER MANAGEMENT PLAN
at 245 David Low Way, PEREGIAN BEACH
for Altum Property Group
DATE: 03.02.22 REF: 188-002-001
ATT: Assessment Officer EMAIL: [email protected]
REV: A
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 43 pages
Page 2
CONTENTS PAGE
Lawful Point of Discharge ............................................................................................ 9
External Catchment and Overland Flows .................................................................... 9
Stormwater Infrastructure........................................................................................... 9
Flooding ....................................................................................................................... 9
Page 2 of 11
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
Page 3
LIST OF FIGURES
Figure 1 - Locality Plan ......................................................................................................................................... 6
LIST OF TABLES
Table 1 – Required Infiltration Tank Volumes ..................................................................................................... 7
Table 2 – Required Infiltration Tank Size ............................................................................................................. 8
LIST OF APPENDICES
Appendix A Engineering Plans
Prepared by Bax Engineering dated February 2022
Appendix B Insite Integrated Water Management
Prepared by Bax Engineering dated February 2022
Page 3 of 11
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
Page 4
INTRODUCTION
Bax Engineering has been commissioned by Altum Property Group to provide a site-based stormwater
management plan for the proposed development at 245 David Low Way, Peregian Beah, Queensland.
The report is intended to support the development application seeking approval for a material change of use
for the site.
The existing site covers a site area of 582m2 and currently has an existing dwelling with hardstand driveways
and two detached sheds. The proposed development consists of one two-storey office and living space with
access driveway and carparking at the ground floor level. This footprint area is 253m2, there is a proposed
hardstand driveway and carpark of 123m2 and the remaining area (206m2) is to be landscaped.
This report has been developed to address the stormwater management in regards to a suitable discharge
from the property and both quality and quantity requirement. The plan is in response to the Noosa Council
information request (MCU21-0288 and OPW21/0364) which requires the development to collect and
discharge/infiltrate stormwater and ensure sufficient capacity is provided in the existing infiltration system.
The stormwater runoff for the proposed development site has been assessed using the Queensland Urban
Drainage Manual (QUDM) with Rational Method calculations to determine the potential stormwater flows on
the development.
Page 4 of 11
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
Page 5
THE SITE AND ITS CONTEXT
LOCALITY
The site is described as lot 22 on P9315 at 245 David Low Way in Peregian Beach and is within the Noosa
Council local government boundaries. The development is identified in Figure 1.
The property has frontage to David Low Way in the east and is bound by a commercial development in the
north, residential property to the south and the recently completed Community Centre to the west.
The total area of the subject lot is 582m2 with the elevation range between 11.5m AHD in the north east corner
to 10.5m AHD in the south-west corner. There is a general fall towards the rear south-west at a slope of
approximately 3%.
Any existing captured runoff from the site currently flows via pipe to an underground infiltration system
located adjacent to the western property boundary within the Community Centre bounds. This area is
landscaped with any overland flows directed to a carpark and driveway area and into the Rufous Street road
reserve. The duration the system has been in operation is unknown, however there appears to be no signs of
failure or apparent nuisance created during storm events. It is noted that any calculations have been based on
the site area only and no external catchments have been considered.
Page 5 of 11
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
Page 6
Figure 1 - Locality Plan
Source: Queensland Globe
The purpose of the management plan is to ensure the current infiltration system designed for the site is
adequate to contain flows generated by the proposed development.
Calculations using the Insite Water modelling program provides the critical storm duration as 10 minutes and
a time of concentration for the site to the outlet as 5 minutes. (Refer Appendix A).
Previous approvals with Noosa Council indicate that any development requiring infiltration systems need to
demonstrate that all but the most extreme rainfall events would be infiltrated and that any infiltration tanks
are to be sized to cater for all design events up to and including the 1% AEP (1 in 100-year ARI design event).
Based on the post-development impervious fraction the site was calculated to have a peak flow for a 1% AEP
design storm event as 0.05 m3/s.
Page 6 of 11
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
Page 7
STORMWATER MANAGEMENT
STORMWATER QUANTITY MANAGEMENT
Infiltration Tank Sizing and Background
It is recommended that underground infiltration tanks be installed within the property to minimise the flows
being sent to the historical point of discharge (i.e. the infiltration system within the adjacent council owned
property).
The proposed infiltration tank sizes are calculated based on geotechnical investigations of the property
showing material as sand. This stratum typically demonstrates a saturated hydraulic conductivity of
k = 2.6x10-3 m/s (9216 mm/hr) and assumed that a groundwater table would be at least 1.0m below the base
of any infiltration system installed.
The sizing of the proposed infiltration tanks is based on the Hydrological Effectiveness Method as outlined in
Section 7 of “The WSUD Technical Design Guidelines for South East Queensland” (2006).
The Hydrological Effectiveness Method sizes an infiltration trench based on the specified proportion of the
mean annual runoff volume that will infiltrate in to the soil profile. In brevity the methodology states that for
the geotechnical information provided, an infiltration tank 1.0m deep with an area equal to 1% of the
catchment will infiltrate 100% of the mean annual runoff.
Based on the generated volume of proposed runoff for the 1% AEP event and the Hydrological Effectiveness
Method the proposed volume is reproduced below in Table 1. The detention volume calculated using the Insite
Water software (with a permissible discharge volume for non-worsening and orifice plate) is also provided as
comparison. It is demonstrated that Hydrological Effectiveness Method provides a larger tank size and was
adopted for design and construction.
Table 1 – Required Infiltration Tank Volumes
Catchment Area (ha) Volume
Hydrological Effectiveness Method In-site Water
Lot 22 0.0582 5.82m3 4.30m3
Page 7 of 11
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
Page 8
The dimensions of the proposed infiltration system would use Atlantis Flo-Tank (Matrix Triple Modules) or an
approved equivalent. The dimension of each Atlantis cell used is 408mm wide x 685mm long x 1310mm high
(0.366m3 per cell). Based on a system comprising of 25 modules connected in 5 rows of 5 modules formation,
the results for infiltration are shown in Table 2.
Table 2 – Required Infiltration Tank Size
Required Volume Proposed Tank Properties (25 modules)
Acceptable Capacity
(Hydrological Effectiveness Method) Surface Area Volume
5.82m3 6.987m2 9.15m3 Yes
It is noted that the proposed tank size well exceeds the required volume. However, based on the suitable space
for installation, this configuration has been adopted. This conservative volume as well as the unknown capacity
of the existing infiltration system that is historically being used, surpasses the requirements for non-worsening
from the site.
Page 8 of 11
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
Page 9
DRAINAGE AND EXISTING TOPOGRAPHY
Lawful Point of Discharge
The site drains with a grade towards an existing low point at approximately RL 10.5m AHD in the south-west
corner. This location has been the historical point of discharge and will remain.
To attempt to achieve a lawful point of discharge to the David Low Way road reserve would require substantial
fill to the site and create a visual appearance that would not be welcome to the environment.
External Catchment and Overland Flows
In general, the site experiences no overland flow from any upper catchments.
Stormwater Infrastructure
The proposed stormwater system utilises 150 and 225mm diameter pipes and will ultimately discharge to the
existing infiltration system via the proposed infiltration system. Overland flows from any major storm events
will also be directed towards the south-west. However, with the tank sizing available it is expected that runoff
would be reduced.
Flooding
Flood mapping courtesy of the Noosa Council (ARCGIS Web Map) indicates the site is not subject to flooding
from any sources.
The mapping demonstrates all defined flood extents limited to the parkland in the west.
Page 9 of 11
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
Page 10
CONCLUSION
The report has reviewed the pre and post development scenario for the subject and external catchment
hydrology to ensure non-actionable nuisance of flows.
In summary, the development on the subject site will result in non-actionable nuisance of stormwater runoff
quantities with all runoff to outlet to infiltration tanks (both new and existing). It is expected the proposed
tank would be suitable for detention as a stand-alone system, however the connection to the historical
infiltration would provide supplementary capacity.
While a pipe connection to the existing council infrastructure in David Low Way was investigated, it was found
to be unfeasible. Substantial fill to achieve fall as well as the distance of any infrastructure from the site; this
connection cannot be considered a realistic outcome.
It is anticipated the report, when reviewed in conjunction with the planning report and the development plans;
will assist in supporting the application seeking development approval.
Yours Faithfully,
GLENN AINSWORTH
MIEAust CPEng NER RPEQ CPESC
BAX ENGINEERING PTY. LTD.
Ph: 0407 021 300
Page 10 of 11
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
Page 11
REFERENCES
Civil Design
Prepared by Bax Engineering
Insite Integrated Water Management
https://insitewater.com.au/
Queensland Globe – Site Mapping
https://qldglobe.information.qld.gov.au/
Queensland Urban Drainage Manual Fourth edition, 2016 (Institute of Public Works Engineering
Australasia, Queensland Division)
Page 11 of 11
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
Page 12
APPENDIX A
Engineering Plans
Prepared by Bax Engineering dated February, 2022
[OCR of page images]
APPENDIX A
Engineering Plans
Prepared by Bax Engineering dated February, 2022
Page 13
INDUSTRIAL DEVELOPMENT
245 DAVID LOW WAY
BAX
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PEREGIAN BEACH QLD 4573 [email protected]
Operational Works Application
ALTUM
NORTH POINT
DRAWING SCHEDULE
INDEX
DRAWING
SHEET TITLE
GENERAL
188-002-001 COVER SHEET
188-002-002 GENERAL NOTES
DRIVEWAY & DRAINAGE WORKS
188-002-100 SITE LAYOUT PLAN
188-002-200 EARTHWORKS LAYOUT PLAN
188-002-201 EARTHWORKS SECTIONS
SITE LOCATION 188-002-250 SEDIMENT & EROSION CONTROL PLAN
188-002-251 SEDIMENT AND EROSION DETAILS
188-002-300 GRADING & DRAINAGE LAYOUT PLAN
188-002-301 PAVEMENT LAYOUT PLAN
188-002-302 SIGN & LINEMARKING LAYOUT PLAN
STORMWATER
188-002-400 DRAINAGE CATCHMENT LAYOUT PLAN
188-002-401 DRAINAGE LONGITUDINAL SECTION
188-002-402 DRAINAGE CALCULATIONS TABLE
WATER RETICULATION
188-002-500 WATER RETICULATION GENERAL NOTES
188-002-501 WATER RETICULATION LAYOUT PLAN
188-002-502 WATER RETICULATION DETAIL PLAN
SEWER RETICULATION
188-002-600 SEWER RETICULATION GENERAL NOTES
188-002-601 SEWER RETICULATION LAYOUT PLAN
MISCELLANEOUS
188-002-700 CONCRETE & JOINTING DETAILS
VEHICLE SWEPT PATH
188-002-800 SWEPT PATH LAYOUT PLAN SHEET 1 OF 5
188-002-801 SWEPT PATH LAYOUT PLAN SHEET 2 OF 5
188-002-802 SWEPT PATH LAYOUT PLAN SHEET 3 OF 5
188-002-803 SWEPT PATH LAYOUT PLAN SHEET 4 OF 5
188-002-804 SWEPT PATH LAYOUT PLAN SHEET 5 OF 5
LOCALITY PLAN
PROJECT DESCRIPTION
PROPERTY DESCRIPTION PROJECT NAME:
LOT:
22 245 DAVID LOW WAY, PEREGIAN BEACH
PLAN: PROJECT NO:
P9315 188-002
REVISION DATE:
LOCAL AUTHORITY:
07.02.22
SUNSHINE COAST COUNCIL
LOCAL AUTHORITY APPROVAL NO:
PLAN ISSUE:
NA
FOR APPROVAL
Page 14
GENERAL EARTHWORKS/ROADWORKS SEDIMENT AND EROSION
STORMWATER
·
·
·
·
·
·
LINEMARKING
ENERGY SERVICE PROVIDERS TELECOMMUNICATIONS
SERVICE PROVIDERS elstra Manual of Uniform Traffic Control Devices
BEFORE YOU DIG SERVICE LOCATIONS AGL
ERGON. AUSTRALIA
IT IS THE RESPONSIBILITY OF THE PRINCIPAL
ENERGY
energex ' yes' Telstra visionstream
CONTRACTOR TO CONTACT ALL RELEVANT origin OPTUS WARNING: OPTIC FIBRE NOTE: ALL SIGNS & LINE MARKING TO BE IN
SERVICE AUTHORITIES TO VERIFY THE NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM EXTREME CARE TO BE TAKEN WHILE EXCAVATING IN THE
LOCATION OF ALL EXISTING SERVICES PRIOR PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED VICINITY OF OPTIC FIBRE CABLES. LOCATIONS ARE TO ACCORDANCE WITH THE MANUAL OF
PRIOR TO START OF CONSTRUCTION. PHONE DBYD PRIOR TO START OF CONSTRUCTION. PHONE DBYD
TO THE START OF CONSTRUCTION SERVICE LOCATIONS ON 1100 FOR DETAILS. SERVICE LOCATIONS ON 1100 FOR DETAILS.
BE CONFIRMED PRIOR TO START OF CONSTRUCTION. UNIFORM TRAFFIC CONTROL DEVICES.
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM GENERAL NOTES
DATUM:
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-002 REVISION B A1
Page 15
EXISTING LAYOUT PROPOSED LAYOUT
LEGEND:
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM SITE LAYOUT PLAN
DATUM:
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-100 REVISION B A1
Page 16
LEGEND:
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM EARTHWORKS LAYOUT PLAN
DATUM:
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-200 REVISION B A1
Page 17
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM EARTHWORKS SECTIONS
DATUM:
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-201 REVISION B A1
Page 18
LEGEND:
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM SEDIMENT & EROSION CONTROL PLAN
DATUM:
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-250 REVISION B A1
Page 19
STABILISED SITE ACCESS
SEDIMENT FENCE
BARRIER FENCE
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM SEDIMENT AND EROSION DETAILS
DATUM:
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-251 REVISION B A1
Page 20
LEGEND:
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM GRADING & DRAINAGE LAYOUT PLAN
DATUM:
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-300 REVISION B A1
Page 21
LEGEND:
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM PAVEMENT LAYOUT PLAN
DATUM:
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-301 REVISION B A1
Page 22
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM SIGN & LINEMARKING LAYOUT PLAN
DATUM:
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-302 REVISION B A1
Page 23
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM DRAINAGE CATCHMENT LAYOUT PLAN
DATUM:
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-400 REVISION B A1
Page 24
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM DRAINAGE LONGITUDINAL SECTION
DATUM:
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-401 REVISION B A1
Page 25
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM DRAINAGE CALCULATIONS TABLE
DATUM:
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-402 REVISION B A1
Page 26
NOTES: WATER
NORTH POINT
SITE LOCATION ≤
≤
LOCALITY PLAN
DRAWING SCHEDULE
number TITLE
WATER RETICULATION
188-002-500 WATER RETICULATION GENERAL NOTES
188-002-501 WATER RETICULATION LAYOUT PLAN
188-002-502 WATER RETICULATION DETAIL PLAN
SERVICE LOCATIONS
CLEARANCES BETWEEN WATER MAINS AND IT IS THE RESPONSIBILITY OF THE PRINCIPAL
CONTRACTOR TO CONTACT ALL RELEVANT
UNDERGROUND SERVICES SERVICE AUTHORITIES TO VERIFY THE
LOCATION OF ALL EXISTING SERVICES PRIOR
TO THE START OF CONSTRUCTION
≤ Manual of Uniform Traffic Control Devices
BEFORE YOU DIG
≤
NOTE: ALL SIGNS & LINE MARKING TO BE IN
ACCORDANCE WITH THE MANUAL OF
≤
UNIFORM TRAFFIC CONTROL DEVICES.
ENERGY SERVICE PROVIDERS TELECOMMUNICATIONS
AGL SERVICE PROVIDERS elstra
ERGON. AUSTRALIA
≤ ENERGY
energex ' yes' Telstra visionstream
origin OPTUS WARNING: OPTIC FIBRE
NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM EXTREME CARE TO BE TAKEN WHILE EXCAVATING IN THE
PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED VICINITY OF OPTIC FIBRE CABLES. LOCATIONS ARE TO
PRIOR TO START OF CONSTRUCTION. PHONE DBYD PRIOR TO START OF CONSTRUCTION. PHONE DBYD
SERVICE LOCATIONS ON 1100 FOR DETAILS. BE CONFIRMED PRIOR TO START OF CONSTRUCTION.
SERVICE LOCATIONS ON 1100 FOR DETAILS.
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM WATER RETICULATION
DATUM:
GENERAL NOTES
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-500 REVISION B A1
Page 27
LEGEND:
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM WATER RETICULATION LAYOUT PLAN
DATUM:
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-501 REVISION B A1
Page 28
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM WATER RETICULATION DETAIL PLAN
DATUM:
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-502 REVISION B A1
Page 29
SEWER
NORTH POINT
SITE LOCATION
LOCALITY PLAN
DRAWING SCHEDULE
number TITLE
SEWER RETICULATION
188-002-600 SEWER RETICULATION GENERAL NOTES
188-002-601 SEWER RETICULATION LAYOUT PLAN
ENERGY SERVICE PROVIDERS TELECOMMUNICATIONS
SERVICE PROVIDERS elstra Manual of Uniform Traffic Control Devices
BEFORE YOU DIG SERVICE LOCATIONS AGL
ERGON. AUSTRALIA
IT IS THE RESPONSIBILITY OF THE PRINCIPAL
ENERGY
energex ' yes' Telstra visionstream
CONTRACTOR TO CONTACT ALL RELEVANT origin OPTUS WARNING: OPTIC FIBRE NOTE: ALL SIGNS & LINE MARKING TO BE IN
SERVICE AUTHORITIES TO VERIFY THE NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM EXTREME CARE TO BE TAKEN WHILE EXCAVATING IN THE
LOCATION OF ALL EXISTING SERVICES PRIOR PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED VICINITY OF OPTIC FIBRE CABLES. LOCATIONS ARE TO ACCORDANCE WITH THE MANUAL OF
PRIOR TO START OF CONSTRUCTION. PHONE DBYD PRIOR TO START OF CONSTRUCTION. PHONE DBYD
TO THE START OF CONSTRUCTION SERVICE LOCATIONS ON 1100 FOR DETAILS. SERVICE LOCATIONS ON 1100 FOR DETAILS.
BE CONFIRMED PRIOR TO START OF CONSTRUCTION. UNIFORM TRAFFIC CONTROL DEVICES.
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM SEWER RETICULATION
DATUM:
GENERAL NOTES
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-600 REVISION B A1
Page 30
LEGEND:
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM SEWER RETICULATION LAYOUT PLAN
DATUM:
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-601 REVISION B A1
Page 31
A
A -
-
A
-
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM CONCRETE & JOINTING DETAILS
DATUM:
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-700 REVISION B A1
Page 32
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM SWEPT PATH LAYOUT PLAN
DATUM:
SHEET 1 OF 5
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-800 REVISION B A1
Page 33
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM SWEPT PATH LAYOUT PLAN
DATUM:
SHEET 2 OF 5
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-801 REVISION B A1
Page 34
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM SWEPT PATH LAYOUT PLAN
DATUM:
SHEET 3 OF 5
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-802 REVISION B A1
Page 35
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM SWEPT PATH LAYOUT PLAN
DATUM:
SHEET 4 OF 5
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-803 REVISION B A1
Page 36
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM SWEPT PATH LAYOUT PLAN
DATUM:
SHEET 5 OF 5
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-804 REVISION B A1
Page 37
APPENDIX B Insite Integrated Water Management Prepared by Bax Engineering dated February, 2022
Page 38
Stormwater Calculations
Report for Noosa Shire Council
Date report printed: 06/02/2022
Project Details
Project Name Altum
InSite User Email
Web files link
Site Area (m2) 582 Project ID 2824
Planning number 188-002
Development type Single dwelling
Existing site details Residential >750m2 per dwelling
Street address 245 David Low Way, Peregian Beach QLD, Australia
Results
Objective: Reduce annual Objective: Control peak Objective: Improve
average runoff volume by discharge flow (litres per stormwater runoff water
harvesting or infiltrating second) with adequate on quality
stormwater site detention (Equivalent to STORM
score)
Target: No increase in pre- Target: less than or equal Target: Achieve a score of
development annual to zero. If greater than 100 or more
average runoff volume zero this is the additional This corresponds to a 45%
(Up to a 10% increase is Site Storage Requirement reduction in nitrogen
allowed to account for (SSR) volume required runoff
uncertainties)
VOLUME RESULT FLOW RESULT QUALITY RESULT
-89.6 -4.9 208
% change in annual m3 of additional site Pollution reduction
average volume storage required score (out of 100)
VOLUME PASSES FLOW PASSES QUALITY PASSES
Page 39
Design Criteria
The items on this page must be reflected on other project plans, specifications and engineering drawings.
The development must be designed and constructed in accordance with the following:
Rainwater Tank Specifications
Total rainwater tank volume (L) 0 *This is the rainwater tank volume
retention + detention
0
*This is the rainwater tank volume
Total rainwater retention* tank volume (L) that is available for reuse
*This is the rainwater tank volume that is
Total rainwater detention* tank volume (L) 0 reserved for slow release to stormwater
Roof connected to rainwater tank (m ) 2
0.0
Rainwater tanks connected to Toilet , Laundry
Irrigated Garden
Other rainwater tank end uses (L/day) Area (m2)
First Flush
% building rainwater end uses connected 100 Device? 0
(to rainwater tanks)
*Site storage added adjacent to the legal point of
Additional* Site Storage (L) 9150 discharge for peak flow detention or volume infiltration
Recycled water source (Yes/No)
Water tank reliability % 0.0
0.0
*Note if this number is under 25%, then 30% of the tank’s retention
Rainwater tank overflow % volume will be counted toward the detention volume
Water Efficiency Specifications
Basin WELS star rating > 4 Star WELS rating
Toilet WELS rating > 4 Star WELS rating
Bath WELS star rating Medium Sized Contemporary Bath
Washing Machine WELS star rating Default or unrated
Kitchen Taps WELS rating > 4 Star WELS rating
Urinal WELS rating Not Applicable
Shower WELS star rating 3 Star WELS (> 7.5 but <= 9.0) (minimum requirement)
Dishwasher WELS star rating > 3 Star WELS rating
4300 litres of additional Site Storage Requirement (SSR) (in addition to the combined rainwater / detention tanks) which is provided
by 9150 litres of additional site storage adjacent to the legal point of discharge.
Stormwater management measures selected are
This includes all impervious areas in the site connected to Council or Stormwater Authority drains. This excludes
pervious areas like garden, gravel, and lawn areas)
•253m2 of Other Roof draining to 3m2 of treatment: Infiltration Sand
•123m2 of Driveway Driveway draining to 3m2 of treatment: Infiltration Sand
© 2020 InSite Water www.insitewater.com.au
Page 40
Building Occupancy Calculations
Building Spaces
•253m2 of Individual dwellings - BCA Class 1a with an average occupancy of 5.1 people
Estimated Total Building Occupancy 5.1
Stormwater VOLUME Calculations
Site Area (m2) 582
Post development total impervious
area (m2) 376.0
Rainwater Tank Overflow (kL/annum) 0.0
Pre-development Volume (kL/annum) 183.5
Post-development Volume
19.1
(kL/annum)
Change in volume % -89.6
Stormwater QUALITY Calculations
Rainwater Tank Runoff reduction (%) 0.0
Rainwater Tank(s) Total Nitrogen (TN) 0.0
reduction
Total Nitrogen (TN) % reduction 93.6
Equivalent STORM Score 208
Water EFFICIENCY Calculations
Benchmark water use (kL/year) 444.9
Predicted potable water use (kL/year) 396.0
Predicted potable water use
212.7
(L/person/day)
Water savings from tank (kL/year) 0.0
Water saving from efficiency (kL/year) 48.90
Water
Total water saving % (efficiency + tank 11.0 saving 48.9
+ recycled water) (kL/year)
© 2020 InSite Water www.insitewater.com.au
Page 41
Stormwater FLOW Calculations - Boyd's formula
This section outlines rational method calculations for On Site Detention (OSD) and Site Storage Requirements (SSR)
Permissible Site Discharge (PSD) Calculations
Calculated PSD 20.5
PSD Override Value Used
Site Storage Calculations
Preliminary On Site Detention (OSD)
tank size required estimate (m3) 4.30 Boyd's formula formula
OSD and storages* provided (m3) 9.2 Includes storages: rainwater tank retention allowance,
rainwater tank detention, and additional added storage volumes
Additional detention / retention
-4.9
volume required (m3)
Base case (pre-development) fraction
0.40
impervious (ratio)
Base case runoff coefficient 0.82
Post development total impervious
0.0376
area (in hectares)
Post development fraction impervious
(ratio) 0.65
Post development runoff coefficient 0.868
Pre-development design storm 20% AEP (~1 in 5 year ARI storm) - default residential
Post development detention required 1% AEP (~1 in 100 ARI)
Critical Storm Duration - the
Catchment time of concentration – 10
Tc(catchment) in minutes
Rainfall Depth (mm) for Critical Storm
25.71
Duration - Tc(catchment)
Rainfall intensity - i at Tc(catchment)
154.3
(mm/h)
Travel time from discharge point 5.0
to catchment outlet (min) - Tcs
Rainfall Depth (mm) for Tcs - (IFD at 18.74
Tcs)
Rainfall intensity - i at tc(site) (mm/h) 224.88
OSD tank flow restrictor orifice diameter = 99 mm
© 2020 InSite Water www.insitewater.com.au
Page 42
About In-Site Water
This report is generated by user inputs from the toolkit at InSite Water. In-Site water is an online Integrated Water
Management tool designed for use on smaller sites (less than 2 hectares) in Australia that need quick and accurate
stormwater engineering answers. InSite water is simple to use but provides robust stormwater design and
engineering answers.
This report includes outputs from the InSite tool that has investigated:
– water tank sizing
– detention tank sizing
– water savings through efficiency
– water WSUD treatments such as raingardens
For enquiries, contact us through www.insitewater.com.au
Disclaimer
This guide is of a general nature only. Advice from a suitably qualified professional should be sought for your
particular circumstances. Depending on each unique situation, there may be occasions where compliance is not
achieved.
This report does not provide a detailed design and layout for the piping and general drainage system in your
development, which should be prepared by a suitably qualified professional. In addition, InSite Water does not
consider compliance for slope stability or foundation / slab / footing protection, which needs to come from a
qualified geotechnical or structural engineer.
The following is outside the scope of InSite Water, however it is critical that all designers consider the following in
drainage design and in using Water Sensitive Urban Design (WSUD) devices and approaches:
• Manage expectations and risks around occasional surface water and ponding.
• Ensure that uncontrolled stormwater does not flow over property boundaries or otherwise cause a nuisance.
• Plan for major flood pathways – locate buildings away from, adapt (raise floors above predicted flood levels)
and defend buildings against potential major flooding.
• Seek professional advice to reduce damage and safety risks.
• Design for local conditions such as vegetation, topography and soils (soil type, reactivity, permeability, water
table level, salinity, dispersiveness, acid sulphate soils, contaminated land etc).
• Ensure that soil moisture and building clearance is considered in areas of reactive clays or where varying soil
moisture levels could damage buildings or other infrastructure.
• For steeper sites, ensure the design includes geotechnical considerations such as slope stability with varying
soil saturation levels.
• Ensure that a Stormwater Risk Assessment and Environmental Management Plan is undertaken for sites that
pose a pollution risk.
• Ensure that a Construction Environmental Management Plan (CEMP) is implemented to control sediments
and reduce stormwater pollution during construction.
• Compliance with ARR 2019, Australian Rainfall and Runoff: A Guide to Flood Estimation http://arr.ga.gov.au/
• Compliance with NCC plumbing and building standards.
• Compliance with AS/NZS 3500.
• Compliance with EPA and other environmental regulations.
• Compliance with other relevant Australian Standards, regulations and Council requirements.
Legal Disclaimer
InSite Water and Organica Engineering takes no responsibility for the selective application or interpretation by third parties of the information that constitutes the document. This
document and its associated materials have been produced in good faith with all information contained deemed to be correct at time of production. Organica Engineering Pty Ltd, the
authors, reviewers and contributors take no responsibility, legally or financially, for any loss/damage to property/persons/projects resulting directly/indirectly from the document in whole
or part, its associated materials, or the interpretation thereof. Organica Engineering makes no claim as to the accuracy or authenticity of the content of this document, and does not
accept liability for loss or damages incurred as a result of reliance placed upon it.
© 2020 InSite Water www.insitewater.com.au
Page 43
Appendix A: attach further details for this project (if applicable):
Above: Roof treatment drawing (draft for planning approvals only: not for
construction, not to scale)
© 2020 InSite Water www.insitewater.com.au
Page 44
Above: Driveway treatment drawing (draft for planning approvals only: not for
construction, not to scale)
© 2020 InSite Water www.insitewater.com.au