Report for Noosa Shire Council
Date report printed: 06/02/2022
Project Details
Project Name Altum
InSite User Email
Web files link
Site Area (m2) 582 Project ID 2824
Planning number 188-002
Development type Single dwelling
Existing site details Residential >750m2 per dwelling
Street address 245 David Low Way, Peregian Beach QLD, Australia
Results
Objective: Reduce annual Objective: Control peak Objective: Improve
average runoff volume by discharge flow (litres per stormwater runoff water
harvesting or infiltrating second) with adequate on quality
stormwater site detention (Equivalent to STORM
score)
Target: No increase in pre- Target: less than or equal Target: Achieve a score of
development annual to zero. If greater than 100 or more
average runoff volume zero this is the additional This corresponds to a 45%
(Up to a 10% increase is Site Storage Requirement reduction in nitrogen
allowed to account for (SSR) volume required runoff
uncertainties)
VOLUME RESULT FLOW RESULT QUALITY RESULT
-89.6 -4.9 208
% change in annual m3 of additional site Pollution reduction
average volume storage required score (out of 100)
VOLUME PASSES FLOW PASSES QUALITY PASSES
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.