RFI - C - Site Based Stormwater Management Plan

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Stormwater Calculations
Report for Noosa Shire Council
                                                                       Date report printed: 06/02/2022
Project Details
Project Name            Altum
InSite User Email
Web files link
Site Area (m2)          582                                               Project ID 2824
Planning number         188-002
Development type        Single dwelling
Existing site details   Residential >750m2 per dwelling
Street address          245 David Low Way, Peregian Beach QLD, Australia


Results




Objective: Reduce annual      Objective: Control peak       Objective: Improve
average runoff volume by      discharge flow (litres per    stormwater runoff water
harvesting or infiltrating    second) with adequate on      quality
stormwater                    site detention                (Equivalent to STORM
                                                            score)
Target: No increase in pre-   Target: less than or equal    Target: Achieve a score of
development annual            to zero. If greater than      100 or more
average runoff volume         zero this is the additional   This corresponds to a 45%
(Up to a 10% increase is      Site Storage Requirement      reduction in nitrogen
allowed to account for        (SSR) volume required         runoff
uncertainties)
VOLUME RESULT                 FLOW RESULT                   QUALITY RESULT

 -89.6                        -4.9                          208
% change in annual            m3 of additional site         Pollution reduction
average volume                storage required              score (out of 100)

VOLUME PASSES                 FLOW PASSES                   QUALITY PASSES
Log in to download the original file

RFI - C - Site Based Stormwater Management Plan.pdf · 6.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.