Council archive · source document
Response to Information Request 10-6-2025 Combined External Catchment data · OPW25/0042
one pOUNDAR. = =
CONSULTANTS SPEC
pee
ee eee ea eae al a
1
1
I CATCHMENT
‘ 565S0M
1
'
1
See eee eet ei it
.
1
1
1
1
‘ CATCHMENT4
\ 565 SOM
1
1
1
1
1
‘
1 1
L od
wa
1
e'
SIS ta pa in
Pte
.
’
:
‘
’
Ss
A
‘
=:
& oo"
‘ a
‘ ’
.
. 1
.
Sei ee?
RAINWATER HARVESTING %
<—)— Tks TO HYDRAULIC
‘CONSULTANTS SPEC
N
@ STORMWATER DRAINAGE LAYOUT PLAN
LEGEND
RIP@ INDICATES RAPID INFILTRATION PIT (RIP) REFER DETAIL
Sa INDICATES EXISTING SEWER RETICULATION
INDICATES EXISTING WATER RETICULATION
. — INDICATES EXISTING STORMWATER
INDICATES PROPOSED STORMWATER DRAINAGE
0 5 10 15 20 25m
SCALE 1:250 A1
—— 7 RPTL
1800 DIA 2400 DEEP
CATCHMENT 565 SOM
RAINWATER HARVESTING RIP 1SL.2060
TANKS TO HYDRAULIC @ 1800 DIA 2400 DEEP
amv ~~ -~
‘CATCHMENT 565 SOM
220001. RAINWATER HARVESTING
TANK PLUMBED TO IRRIGATION
‘SYSTEM. DISCHARGE OVERFLOW TO
R.LP. REFER LONGITUDINAL SECTION
ON DWG $30001.40601
een
ws
ey
NOTE:
ALL BASEMENT & CARPARK STORMWATER &
TO DISCHARGE OVER A "FOX BPT600" GROSS
POLLUTANT TRAP PRIOR TO CONNECTION TO R.L.P.'S.
BASEMENT & CARPARK DRAINAGE DETAILS TO
HYDRAULIC CONSULTANT'S SPECIFICATIONS.
WASHDOWN TO BE COLLECTED IN A SUMP & PUMPED
RAINWATER HARVESTING
TANKS TO HYDRAULIC
CONSULTANTS SPEC.
CATCHMENT 2
565 SQM
:
'
1
'
'
CATCHMENT 3 x
565 80M !
1
'
'
'
'
'
'
fete erent mare
{
{
q
{
CATCHMENTS
318 SQM
NOTE:
EXTREME CARE TO BE TAKEN EXCAVATING
ADJACENT EXISTING SEWER.
NOTE:
REFER TO HYDRAULIC CONSULTANT'S DETAILS FOR
ALL DOWNPIPE & STORMWATER CONNECTIONS
(PLUMBING & DRAINAGE APPROVAL).
900sq GALVANISED GRATE
FIX WITH 2/M12 S/S BOLTS,
SURFACE LEVEL AS SPECIFIED,
r
i 7 ; oa CONVERTOR SLAB & RISER.
i x i TO MANUFACTURERS SPEC.
? INLET PIPE (IF SPECIFIED)
Teal +b. 1800 DIA RCP (2)
3
4 “ 4 BALANCE PIPE. (IF
. SPECIFIED)
ei REMOVABLE BIDIM A14 ra
q GEOFABRIC FILTER. WEIGHT
F WITH ROCK SPALLS. te a enath
75mm BASALT ROCKSPALLS
WRAPPED IN BIDIM A14
GEOFABRIC
RAPID INFILTRATION PIT (RIP) DETAIL.
CLEAN COARSE SAND FILTER
RIP SCHEDULE
RIPNo] S.L. | IL. | BALANCE PIPE
RIP 1 N/A
AMENDMENTS
issue) DATE DESCRIPTION INT.
% | sora | stoRsnwareR avenceD ®
8 | castor | stommwateravennen R
Othis plan ts Other than for the of and wud)
ee eet
tay fo any form or by any (slectroale,
aero copying, photo copying, er vidervise) be reproduced
stared in Freel lam oc trunmnitiodwilbot th geen rin
Fooeas wila Ta ht wogeres srl Yo
Femaias within Talo Profesdeaal ‘0 enquiries
DRAWING STATUS Design: sH
Drawn: JR
FOR APPROVAL | _ Pate:tusz»
NOT FOR CONSTRUCTION
Ay ,
Checked:
Api sze abadwen
.
a 'APPROVAL RPEQ- 4784
PROFESSIONAL ENGINEERS
‘TATE PROFESSIONAL ENGINEERS PTY LTD.
A.B.N. 28 086 262 035
39-45 First Avenue, Mooloolaba
PO Box 1092, Mooloolaba, QLD, 4557
Tel (07) 5457 5300 Fax (07) 5477 6100
Email: [email protected]
Web: http:/Awww.tate.net.au
FILENAME :$3000-4.06-01-8 dug - DATE: S117 «124mm
REE: XSXOCOLABASE, XR Arch Floor Pian LY
PROJECT:
PROPOSED DEVELOPMENT
at LOT 4 SERENITY CLOSE
NOOSA HEADS
CLIENT:
CAPE BOUVARD DEVELOPMENTS PTY LTD
DRAWING TITLE:
STORMWATER DRAINAGE
LAYOUT PLAN & DETAILS
Council Ref:
Sheet | Revision
Pra] [ke S3000/L4/06/01
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request 10-6-2025 Combined External Catchment data.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.