Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Negotiated Report (Representations made) 132008 176 05 (As Published)

of 12

Page text shows just the words. Original shows the document exactly as it was published.

                      a.      Condition 6 – is required to ensure that the buildings comply with height requirements
                              from all angles that are visible from the road.
                      b.      Condition 46 - the stormwater material submitted to Council as part of the assessment
                              process detailed conceptual issues that need to be resolved before the design detail
                              can be documented in the Operational Works Application.
                      c.      Condition 66g - additional street trees can be planted which will further soften the
                              building and contribute positively to the streetscape.




                                                                                                     Page 12 of 12

Document Set ID: 23616598
Version: 2, Version Date: 05/03/2025
Log in to download the original file

Negotiated Report (Representations made) 132008 176 05 (As Published).pdf · 371 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.