a. Condition 6 – is required to ensure that the buildings comply with height requirements
from all angles that are visible from the road.
b. Condition 46 - the stormwater material submitted to Council as part of the assessment
process detailed conceptual issues that need to be resolved before the design detail
can be documented in the Operational Works Application.
c. Condition 66g - additional street trees can be planted which will further soften the
building and contribute positively to the streetscape.