Council archive · source document
Form 1 and 7 · REC14/0015
Attached to the e-mail REC14/0015 Cover letter & IDAS forms Email 1 of 3.
IDAS form 1 (Sustainable Planning Act 2009 version 4.1 effective 4 July 2014) This form must be used for ALL development applications. You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this form. For all development applications, you must: * complete this form (IDAS form 1—Application details) complete any other forms relevant to your application provide any mandatory supporting information identified on the forms as being required to accompany your application. Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable Planning Regulation 2009. This form and any other IDAS form relevant to your application must be used for development applications relating to strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land use plan for the strategic port land, Brisbane core port land or airport land. PLEASE NOTE: This form is not required to accompany requests for compliance assessment. This form can also be completed online using MyDAS at lwww.dsdip.qld.gov.au/MyDAS Mandatory requirements Applicant details (Note: the applicant is the person responsible for making the application and need not be the owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct. Any development permit or preliminary approval that may be issued as a consequence of this application will be issued to the applicant.) Name?/s (individual or company name in CouR TWARE BUS TRAKSM P YY AZ! Ee ACH 006 257 647 For companies, contact name RITA TUEENOMHAFR T Postal address 1! SPRIGFIEKO AVENUE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 17 pages
Page 2
Suburb S77 KKDA £78 7 State | |Postcode VICTOR/A. 3 783 ‘Country Contact phone number O4 13 AAS 620 Mobile number (non-mandatory AS ABOVE requirement) Fax number (non-mandatory requirement) Email address (non-mandatory rré Qa bug 13 Dgmail ~Can requirement) @ ‘Applicant's reference number (non- mandatory requirement) 1. What is the nature of the development proposed and what type of approval is being sought? Table A—Aspect 1 of the application (If there are additional aspects to the application please list in Table B—Aspect 2.) a) What is the nature of the development? (Please only tick one box.) Material change | Reconfiguring a | Building work Operational of use lot J work b) What is the approval type? (Please only tick one box.) Preliminary Preliminary Development approval approval under permit under $241 8241 and s242 of SPA of SPA Y/Y ic) Provide a brief description of the proposal, including use definition and number of buildings or structures where applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.) A LOT KESIOLW PAK SUBLIVIS UAL, id) What is the level of assessment? (Please only tick one box.) Impact Code assessment assessment /
Page 3
Table B—Aspect 2 of the application (If there are additional aspects to the application please list in Table C—Additional aspects of the application.) la) What is the nature of development? (Please only tick one box.) Material change of use Reconfiguring a lot Building work Operational work b) What is the approval type? (Please only tick one box.) Preliminary Preliminary Development approval approval under permit under s241 s241 and s242 of SPA of SPA ic) Provide a brief description of the proposal, including use definition and number of buildings or structures where applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.) id) What is the level of assessment? Impact Code assessment assessment Table C—Additional aspects of the application (If there are additional aspects to the application please list in a separate table on an extra page and attach to this form.) Refer attached schedule Not required iz: Location of the premises (Complete Table D and/or Table E as applicable. Identify each lot in a separate row.) Table D—Street address and lot on plan for the premises or street address and lot on plan for the land adjoining or adjacent to the premises (Note: this table is to be used for applications involving taking or interfering with water). (Attach a separate schedule if there is insufficient space in this table.) Street address and lot on plan (All lots must be listed.) Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed.) Street address Lot on plan description Local government area (e.g. Logan, Cairns) Lot Unit Street Street name and official Post- Lotno. Plan type no. no. — suburb/ locality name code and plan no. ) 73 Eymunor weesh Rony @3CPner) KP7UIS/. ‘oe OOSAVIKE, 45 i) 7% Evmentos Noes ROA , 2ECOARNREZHS/ Semone ¥ MdOSAVILLE. ASC, ill) 77 E¢r plot NOOSA £Ond 74% APOUST SUNSH IM WIALE- Planning se he dette the reciees involves multiple zones, clearly identify the relevant zone/s for each lot in a separate row in the below table. Non-mandatory) ThbES ARC NOT APHICHBK
Page 4
Lot Applicable zone / Applicable local plan / precinct Applicable overlay/s precinct i) ii) ili) Table E—Premises coordinates (Appropriate for development in remote areas, over part of a lot or in water not adjoining or adjacent to land e.g. channel dredging in Moreton Bay.) (Attach a separate schedule if there is insufficient space in this table.) Coordinates Zone Datum _|Local (Note: place each set of coordinates ina _ |reference government separate row) area (if applicable) Easting |Northing |Latitude |Longitude GDA94 WGS84 other 3. Total area of the premises on which the development is proposed (indicate square metres) ] At 4e me 4. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm etc.) | HOUSE PMD VACANT AAND 6. Are there any current approvals (e.g. a preliminary approval) associated with this application? (Non-mandatory requirement) ()Yes—provide details below List of approval Date approved Date approval lapses reference/s (dd/mm/yy) (dd/mm/yy) 6. Is owner’s consent required for this application? (Refer to notes at the end of this form for more information.) No THE APPLICANT LS THE OWNER | Yes—complete either Table F, Table G or Table H as applicable Table F TABLE E NOT APPLICABLE | RITA . /§ THEE BAI EX)STINE Hovske Od WE Ok THe 4075 ~ LOT 7H ? Dnt +
Page 5
Name of owner/s of the land We, the above-mentioned owner/s of the land, consent to.the making of this application. COURT WARE ( Av spunksi) Bry SF ~ Signature of owner/s of the land Date Table G Name of owner/s of the land The owner's written consent is attached or will be provided separately to the assessment manager. Table H Name of owner/s of the land By making this application, |, the applicant, declare that the owner has given written consent to the making of the application. 7. Identify if any of the following apply to the premises (Tick applicable box/es.) Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete Table | On strategic port land under the Transport Infrastructure Act 1994—complete Table J In a tidal water area—complete Table K On Brisbane core port land under the Transport Infrastructure Act 1994 (No table requires completion.) On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion) Listed on either the Contaminated Land Register (CLR) or the Environmental Management Register (EMR) under the Environmental Protection Act 1994 (no table requires completion) Table | Name of water body, watercourse or aquifer} Table J Lot on plan description for strategic port land|Port authority for the lot Table K
Page 6
Name of local government for the tidal Port authority for the tidal area (if area (if applicable) applicable) 8. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc) (N)Yes—ensure the type, location and dimension of each easement is included in the plans submitted 9. Does the proposal include new building work or operational work on the premises? (Including any services) nofes)-ensure the nature, location and dimension of proposed works are included in plans submitted 10. Is the payment of a portable long service leave levy applicable to this application? (Refer to notes at the end of this form for more information.) Q)-20 to question 12 Yes 11. Has the portable long service leave levy been paid? (Refer to notes at the end of this form for more information.) No NOT RPPRICHALE Yes—complete Table L and submit with this application the yellow local government/private certifier’s copy of the receipted QLeave form Table L Amount paid|Date paid |QLeave project number (6 digit (dd/mmiyy)|Number starting with A, B, E, L or P) 12. Has the local government agreed to apply a superseded planning scheme to this application under section 96 of the Sustainable Planning Act 2009? No NOT APPA CHALE Yes—please provide details below Name of local Date of written notice |Reference number of written government given by local notice given by local government government (if applicable) (dd/mm/yy)
Page 7
13. List below all of the forms and supporting information that accompany this application (Include all IDAS forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question does not apply for applications made online using MyDAS) Description of attachment or title of Method of lodgement to attachment assessment manager IDAS FoRM 1 JONS FORM. 7 SCHEOULE 3 ASSESSABLE DEVLPT | CHECKLIST 3 — AECON/TEULINE ALON | PLAAMING- LEP OAT- Development, wow ba TAA, fe Of ast Qid 4002 38) 14, Applicant’s declaration au By making this application, | declare that all information in this application is true and correct (Note: it is unlawful to provide false or misleading information) Notes for completing this form * Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly-made application. Note, the assessment manager has discretion to accept an application as properly made despite any non-compliance with the requirement to provide mandatory supporting information under section 260(1)(c) of the Sustainable Planning Act 2009 Applicant details * Where the applicant is not a natural person, ensure the applicant entity is a real legal entity. Question 1 * Schedule 3 of the Sustainable Planning Regulation 2009 identifies assessable development and the type of assessment. Where schedule 3 identifies assessable development as “various aspects of development” the applicant must identify each aspect of the development on Tables A, B and C respectively and as required. Question 6 * Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is
Page 8
required for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is required under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or include a declaration by the applicant that the owner has given written consent to the making of the application. If a development application relates to a state resource, the application is not required to be supported by evidence of an allocation or entitlement to a state resource. However, where the state is the owner of the subject land, the written consent of the state, as landowner, may be required. Allocation or entitlement to the state resource is a separate process and will need to be obtained before development commences. Question 7 * |f the premises is listed on either the Contaminated Land Register (CLR) or the Environmental Management Register (EMR) under the Environmental Protection Act 1994 it may be necessary to seek compliance assessment. Schedule 18 of the Sustainable Planning Regulation 2009 identifies where compliance assessment is required. Question 11 * The Building and Construction Industry (Portable Long Service Leave) Act 1997 prescribes when the portable long service leave levy is payable. * The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Question 12 * The portable long service leave levy need not be paid when the application is made, but the Building and Construction Industry (Portable Long Service Leave) Act 1997 requires the levy to be paid before a development permit is issued. * Building and construction industry notification and payment forms are available from any Queensland post office or agency, on request from QLeave, or can be
Page 9
completed on the QLeave website at
www.gleave.ald.gov.au. For further information contact
QLeave on 1800 803 481 or visit
www.dleave.aid.gov.
Privacy—The information collected in this form will be used by
the Department of State Development, Infrastructure and
Planning (DSDIP), assessment manager, referral agency and/or
building certifier in accordance with the processing and
assessment of your application. Your personal details should not
be disclosed for a purpose outside of the IDAS process or the
provisions about public access to planning and development
information in the Sustainable Planning Act 2009, except where
required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be
stored in relevant databases. The information collected will be
retained as required by the Public Records Act 2002.
OFFICE USE ONLY
Date received [|Reterence numbers{|
NOTIFICATION OF ENGAGEMENT OF A PRIVATE
CERTIFIER
Tol Council. | have been engaged as the private certifier for
ithe building work referred to in this application
Date of Name BSA Certification license {Building
lengagement number classification/s
QLEAVE NOTIFICATION AND PAYMENT (For completion by
assessment manager or private certifier if applicable.)
Date
receipted jName of
Date form officer who
paid —_|sighted by sighted the
lassessment|form
manager
QLeave [Amount
project paid
number ($)
Description of the
lwork
Page 10
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agency. IDAS form 14
Page 11
IDAS form 7 (Sustainable Planning Act 2009 version 3.0 effective 1 July 2013) This form must be used for development applications or requests for compliance assessment for reconfiguring a lot. You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this form. For all development applications, you must: * complete DAS form 1—Application details * complete any other forms relevant to your application * provide any mandatory supporting information identified on the forms as being required to accompany your application. For requests for compliance assessment, you must: * complete IDAS form 32—Compliance assessment * Provide any mandatory supporting information identified on the forms as being required to accompany your request Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable Planning Regulation 2009. This form can also be completed online using MyDAS at lwww.dsdip.gld.gov.au/MyDAS Mandatory requirements 1. What is the total number of existing lots making up the 3 premises? Ps What is the nature of the lot reconfiguration? (Tick all applicable boxes.) WA subdivision—complete questions 3-6 and 11 boundary realignment—complete questions 8, 9 and 11 Y creating an easement giving access to a lot from a constructed road —complete questions 10 and 11 dividing land into parts by agreement—please provide details below and complete questions 7 and 11 3. Within the subdivision, what is the number of additional lots being created and their intended final use? Intended final use of new (ResidentialJCommercial Industrial Other— lots specify
Page 12
Number of additional lots f created 4. What type of approval is being sought for the subdivision? J Development permit Preliminary approval Compliance permit 5. Are there any current approvals associated with this subdivision application or request? (E.g. material change of use.) (Re)¥es—provide details below C PREVIOUS HPPROVALS LAPSED MY holy -) List of approval Date approved Date approval lapses reference/s (dd/mm/yy) (dd/mm/yy) 6. Does the proposal involve multiple stages? (Ro) -compete Table A Yes—complete Table B Table A a) What is the total length of any new road to be constructed? ML (metres) b) What is the total area of land to be contributed for community MWK purposes? (square metres) c) Does the proposal involve the construction of a canal or artificial waterway? d) Does the proposal involve operational work for the building of a tetaining wall? Yes Table B—complete a new Table B for every stage if the application involves more than one stage a) What is the proposed estate name? (if known and if applicable) b) What stage in the development does this table refer to? c) If a development permit is being sought for this stage, will the development permit result in additional residential lots? No Yes—specify the total number
Page 13
d) What is the total area of land for this stage? (square metres)
e) What is the total length of any new road to be constructed at this
stage? (metres)
f) What is the total area of land to be contributed for community
purposes at this stage? (square metres)
g) Does the proposal involve the construction of a canal or artificial
waterway?
No Yes
h) Does the proposal involve operational work for the building of a
retaining wall?
No Yes
7. Lease/agreement details—how many parts are being created NOT PPPUCHB AE
and what is their intended final use?
Intended final use of new Residential Commercial Industrial Other—
parts specify
Number of additional parts
created
8. What are the current and proposed dimensions following the =
boundary realignment for each lot forming the premises? MoT AYLLICHB LE
Current lot Proposed lot
Lot plan [Area |Length of road j|Lot Area Length of road
description |(square/frontage number |(square frontage
metres) metres)
9. What is the reason for the boundary realignment? NOT BALKICHEKE
10. What are the dimensions and nature of the proposed
easement? (if there are more than two easements proposed please list
in a separate table on an extra page and attach to this form.)
Width {Length |Purpose of the easement (e.g. What land is benefitted
(m) (m) pedestrian access)? by the easement?
@+00 72°84 ACCESS ANO SKYE LOTS $0 8S!
Mandatory supporting information
41, Confirm that the following mandatory supporting information
accompanies this application or request
Page 14
Development, Infrastri ast Qid 4002 38) au Mandatory supporting information Confirmation of lodgement Method of lodgement |All applications and requests for reconfiguring a lot Site plans drawn to an appropriate scale (1:100, 1:200 or 1:500 are the recommended scales) which show the following: * the location and site area of the land to which the application or request relates (relevant land) * the north point the boundaries of the relevant land * any road frontages of the relevant land, including the name of the road * the contours and natural ground levels of the relevant land * the location of any existing buildings or structures on the relevant land the allotment layout showing existing lots, any proposed lots (including the dimensions of those lots), existing or proposed road reserves, building envelopes and existing or proposed open space (note: numbering is required for all lots) * any drainage features over the relevant land, including any watercourse, creek, dam, waterhole or spring and any land urture and BapAwEt to a flood with an annual exceedance probability of 1% * any existing or proposed easements on the relevant land and their function all existing and proposed roads and access points on the relevant land any existing or proposed car parking areas on the relevant land * the location of any proposed retaining walls on the relevant land and their height the location of any stormwater detention on the relevant land * the location and dimension of any land dedicated for community purposes * the final intended use of any new lots. Confirmed Vv For a development application — A statement about how the proposed development addresses) the local government's planning scheme and any other planning documents relevant to the application. For a request for compliance assessment — A statement about how the proposed development laddresses the matters or things against which the request must be assessed. Confirmed /| A statement addressing the relevant part(s) of the State Development Assessment Provisions (SDAP). Confirmed Not applicable For an application involving assessable development in a wild river application relates is not prohibited area Documentation that: Confirmed “ * describes how the development to which the Not . applicable development and
Page 15
* demonstrates how the proposed development will meet the requirements set out in the relevant wild river declaration and any applicable code mentioned in the relevant wild river declaration under the Wild Rivers Act 2005. Amap showing the proposed location of the Confirmed development in relation to any nominated Not waterways under the Wild Rivers Act 2005 and applicable wild river management areas. (a map may be prodiiced aay at Wild river management area means any of the following areas under the Wild Rivers Act 2005: * special floodplain management area * preservation area * high preservation area * floodplain management area * subartesian management area * designated urban area. Editor's note: A floodplain management area, subartesian management area or designated urban area may be over all or part of a high preservation area or preservation area. A subartesian management area or designated urban area may be over all or part of a special floodplain management area. Notes for completing this form ° For supporting information requirements for requests for compliance assessment, please refer to the relevant matters for which compliance assessment will be carried out against. To avoid an action notice, it is recommended that you provide as much of the mandatory information listed in this form as possible. Privacy—Please refer to your assessment manager, referral agency and/or building certifier for further details on the use of information recorded in this form. OFFICE USE ONLY Date received Reference numbers The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agency. IDAS form 7-
Page 16
Development, Infrastructure and Planning ast Qid 4002 38) au Schedule 3 Assessable Development Checklist 3 (Sustainable Planning Act 2009 version 3.1 effective 20 December 2013) This checklist only applies when the development application seeks approval for reconfiguring a lot. Before completing this checklist, it is recommended you complete Checklist 1—Various aspects of development. You may complete this checklist as part of your development application. The checklist will: help you identify whether you need to make a development application for the proposed development help you identify the relevant Integrated Development Assessment System (IDAS) form you need to complete as part of your application assist in identifying the assessment manager or referral agency for development that is assessable development under schedule 3 of the Sustainable Planning Regulation 2009. tf your development involves a material change of use, operational work or building work, it is recommended you complete the relevant checklists: Checklist 2—Material change of use, Checklist 4—Operational work or Checklist 5—Building work where relevant. If you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the Department of State Development, Infrastructure and Planning's (DSDIP) website at www.dsdip.gid.gov.au All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning Regulation 2009. Part 1—General questions| 11 Does the proposal involve reconfiguring a lot under the Land Title Act 1994 or reconfiguring a lot that is assessable development under the planning scheme, a temporary local planning instrument, a preliminary approval to which section 242 of the Sustainable Planning Act 2009 applies, or a state planning regulatory provision? No |End of checklist 'Yes|Complete part 2 of this checklist Part 2—Reconfiguring a lot under the Land Title Act 1994 2.1 Do any of the following apply? The reconfiguration requires compliance assessment under Yes schedule 18 of the Sustainable Planning Regulation 2009, or No the reconfiguration is under a relevant instrument of lease, or | Yes
Page 17
No the plan of subdivision necessary for the reconfiguration: is a building format plan of subdivision that does not subdivide | Yes land on or below the surface of the land, or No is for amalgamation of 2 or more lots, or Yes No is for the incorporation, under the Body Corporate and Yes Community Management Act 1997, section 41, of a lot with No icommon property for a community titles scheme, or is for the conversion, under the Body Corporate and Yes Community Management Act 1997, section 43, of lessee No common property within the meaning of that Act to a lot ina community titles scheme, or is in relation to the acquisition, including by agreement, under | Yes ithe Acquisition of Land Act 1967 or otherwise, of land by: No a constructing authority, as defined under that Act, for a purpose set out in parts 1 to 13 (other than part 10, second dot point) of the schedule to that Act, or an authorised electricity entity, or is for land held by the state, or a statutory body representing Yes the state, and the land is being subdivided for a purpose set No out in the Acquisition of Land Act 1967, schedule, parts 1 to 13 (other than part 10, second dot point) whether or not the land relates to an acquisition, or is for reconfiguring a lot comprising strategic port land, or Yes No is for reconfiguring a South Bank lot within the corporation area} Yes under the South Bank Corporation Act 1989, or No is for the Transport Infrastructure Act 1994, section 240, or Yes No is in relation to the acquisition of land for a water infrastructure | Yes facility, or No is for land in a priority development area. Yes No * If yes to any of the above, and this is the only aspect of your development, then you do not require a development permit. End of checklist. If no to all of the above, then your development requires a development permit, and you must submit a development application to your local government as assessment manager. Please contact your local government for further information. End of checklist. Privacy—Please refer to your assessment manager or referral agency for further details on the use of information recorded in this form. Disclaimer: While DSDIP believes that the information contained on this form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information. It is your responsibility to make your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances. To the full extent permitted by law, DSDIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your reliance on this process and the
Page 18
information contained on this form. OFFICE USE ONLY Date received| Reference numbers|] The Sustainable Planning Act 2009 is administered by DSDIP. This checklist and all other required application materials should be sent to your assessment manager and any referral agency. Checklist 3
Used in these records
Form 1 and 7.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.